The invention discloses a construction method of a sports field adopting ultra-light odorless particles, and relates to the technical field of
high polymer material
processing.The construction method comprises the steps that raw materials are pretreated, and polyether
polyol, a
foaming agent, an amine catalyst, a
tin catalyst and a foam stabilizer are mixed and stirred to prepare a foaming precursor; foaming and forming, namely pouring the precursor into a mold at
high pressure, preserving heat and pressure, and foaming into a block material; crushing and granulating, namely crushing blocks, grading and screening to obtain particles of 1-10mm; mixing on site, and stirring and
coating the glue and the particles according to the ratio of 1: 2.5; paving and compacting: paving the base layer with the material, and compacting to form an elastic base layer;
surface layer spraying, wherein fine particles and waterproof color paste are mixed according to the ratio of 1: 1, sprayed and dried to form a wear-resistant
surface layer; and marking and delivering, namely marking after the
surface layer is dried, and delivering if the detection is qualified. The particles prepared by the method are super easy to process, and after construction, the field structure is compact, the performance is stable, the
environmental protection property reaches the standard, the service life is long, the process
controllability is high, large-scale production can be realized, and the construction requirements of various sports fields such as campuses, communities and professional venues are met.