Auxiliary platform erecting structure for approach bridge area
By erecting platforms formed by auxiliary piles and steel structures in the embankment filling area, the problem of insufficient stability of auxiliary platforms in the existing technology is solved, and the effect of safely erecting large-tonnage equipment during steel trest construction is achieved.
Patent Information
- Application Number
- CN202421371928.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-06-17
AI Technical Summary
The existing auxiliary platform is completed and compacted by clay filling and directly used as a starting platform for construction. However, since the steel trest needs to be constructed with a crane and a hammer stand on the auxiliary platform for construction of the steel pipe column, the tonnage is large, the stability of the filling area cannot be guaranteed and the safety is low.
Auxiliary piles are set up in the embankment filling area, and auxiliary platforms are formed with steel cross beams, longitudinal distribution beams, transverse sub-distribution beams and panels. It is used to erect large-tonnage equipment during subsequent steel trest construction to ensure the stability of the embankment filling area.
By erecting a platform formed by auxiliary piles and steel structures, the stability of the embankment filling area can be effectively guaranteed and large-tonnage equipment can be safely erected during the construction of the steel trest.
Smart Images

Figure CN222685293U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge approach platforms, in particular to an auxiliary platform erection structure in a bridge approach area. Background Art
[0002] At present, underwater construction mostly requires the construction of steel trestles to serve as a passage for personnel, work platforms, and transportation equipment such as cranes. Before the construction of the steel trestles, it is generally necessary to build an auxiliary platform on the shore as a starting platform for the construction of the steel trestles. The existing auxiliary platform is directly used as a starting platform for construction after clay filling and compaction. However, during the construction of the steel trestles, a crane is required to cooperate with a vibrating hammer to stand on the auxiliary platform to construct the steel pipe column, and the tonnage is large. The stability of the filling area cannot be guaranteed, and the safety is low. In response to the above problems, the present application provides a structure for erecting an auxiliary platform in the approach bridge area to ensure the stability of the embankment filling area. Utility Model Content
[0003] The utility model provides an auxiliary platform erection structure in the approach bridge area, which is formed by erecting auxiliary piles in the embankment filling area and cooperating with steel cross beams, longitudinal distribution beams, transverse secondary distribution beams and panels to form an auxiliary platform for erecting large-tonnage equipment during subsequent steel trestle construction to ensure the stability of the embankment filling area.
[0004] The technical problem to be solved is: the existing auxiliary platform is directly used as a starting platform for construction after being filled with clay and compacted. However, during the construction of the steel trestle, a crane is required to cooperate with a vibrating hammer to stand on the auxiliary platform to construct the steel pipe column. The tonnage is large, the stability of the filling area cannot be guaranteed, and the safety is low.
[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0006] The utility model discloses an auxiliary platform erection structure in an approach bridge area, comprising a bank filling area, auxiliary piles, steel beams, longitudinal distribution beams, transverse secondary distribution beams, panels and steel sheet piles, wherein the auxiliary piles are arranged in the bank filling area and the lower parts are driven into a bearing layer, the upper ends of the auxiliary piles are provided with steel beams, longitudinal distribution beams, transverse secondary distribution beams and panels in sequence from top to bottom, the steel sheet piles are arranged on the water-facing side of the bank filling area, and the upper ends of the steel sheet piles are supported on the longitudinal distribution beams.
[0007] The utility model provides an auxiliary platform erection structure in the approach bridge area. Furthermore, the top surface of the bank filling area is provided with a slope which gradually rises toward the waterfront side.
[0008] The utility model provides an auxiliary platform erection structure in the approach bridge area. Further, the panel surface is horizontally laid and is located at the same horizontal plane as the surface layer of the steel trestle.
[0009] The utility model provides an auxiliary platform erection structure in the approach bridge area. Further, the longitudinal distribution beam is fixedly connected with the longitudinal distribution beam of the steel trestle.
[0010] The utility model provides an auxiliary platform erection structure in a bridge approach area. Further, the steel sheet piles are Larsen steel sheet piles, which are arranged side by side on the waterfront side of the embankment filling area.
[0011] The utility model provides an auxiliary platform erection structure in a bridge approach area. Further, the steel cross beam and the longitudinal distribution beam are buried in the embankment filling area.
[0012] The utility model provides an auxiliary platform erection structure in the approach bridge area. Further, the auxiliary piles are arranged at one end of the longitudinal distribution beam away from the waterfront side.
[0013] The utility model provides an auxiliary platform erection structure in a bridge approach area. Further, the distance between the auxiliary piles and the nearest steel trestle steel column does not exceed 1.5 times the distance between the adjacent steel trestle steel columns.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] The present application forms an auxiliary platform by setting up auxiliary piles in the embankment filling area, and cooperating with steel beams, longitudinal distribution beams, transverse secondary distribution beams and panels, which is used for setting up large-tonnage equipment during the subsequent steel trestle construction to ensure the stability of the embankment filling area; in addition, the steel sheet piles are used as the retaining structure of the embankment filling area on the one hand, and on the other hand, they can play a certain supporting role for the end of the auxiliary platform, further ensuring the stability of the auxiliary platform before the auxiliary platform is connected to the steel trestle.
[0016] The utility model will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the utility model.
[0018] Reference numerals:
[0019] 1. Bank filling area; 2. Auxiliary piles; 3. Steel beams; 4. Longitudinal distribution beams; 5. Horizontal secondary distribution beams; 6. Panels; 7. Steel sheet piles; 8. Trestle. DETAILED DESCRIPTION
[0020] like Figure 1As shown, the utility model discloses a structure for erecting an auxiliary platform in the approach bridge area, including a bank filling area 1, auxiliary piles 2, steel beams 3, longitudinal distribution beams 4, transverse secondary distribution beams 5, panels 6 and steel sheet piles 7. The bank filling area 1 is backfilled with coral sand in this application. The auxiliary piles 2 are arranged in the bank filling area 1 and the lower part is driven into the bearing layer. The steel beams 3 are erected on the upper ends of the adjacent auxiliary piles 2 and are fixedly connected to the auxiliary piles 2. The longitudinal distribution beams 4 are arranged on the steel beams 3 and are fixedly connected to the steel beams 3. The transverse secondary distribution beams 5 are laid on the longitudinal distribution beams 4. The panels 6 are steel panels 6, which are laid on the transverse secondary distribution beams 5, wherein the above-mentioned fixed connection can be bolted or welded. The steel sheet piles 7 can be Larsen steel sheet piles 7, which are arranged side by side on the water-facing side of the bank filling area 1, and the upper ends of the steel sheet piles 7 are supported on the longitudinal distribution beams 4.
[0021] The top surface of the bank filling area 1 is provided with a slope which gradually rises toward the waterfront side. The panel 6 is laid horizontally and is located at the same level as the surface layer of the steel trestle 8, so as to facilitate the connection between the auxiliary platform structure and the steel trestle 8.
[0022] The longitudinal distribution beam 4 is fixedly connected to the longitudinal distribution beam 4 of the subsequently erected steel trestle 8, and the auxiliary platform is structurally connected to the steel trestle 8 to ensure the stability and durability of the auxiliary platform.
[0023] In addition, the steel cross beam 3 and the longitudinal distribution beam 4 are buried in the embankment filling area 1, which facilitates the connection between the embankment filling area 1 and the auxiliary platform.
[0024] The auxiliary pile 2 is arranged at the end of the longitudinal distribution beam 4 away from the waterfront side, and the distance between the auxiliary pile 2 and the nearest steel trestle 8 steel column does not exceed 1.5 times the distance between the adjacent steel trestle 8 steel columns, which can ensure the stability of the auxiliary platform.
[0025] The present application forms an auxiliary platform by setting up auxiliary piles 2 in the embankment filling area 1, and cooperating with steel cross beams 3, longitudinal distribution beams 4, transverse secondary distribution beams 5 and panels 6, which is used to set up large-tonnage equipment during the subsequent construction of the steel trestle 8 to ensure the stability of the embankment filling area 1; in addition, the steel sheet piles 7 are used as the retaining structure of the embankment filling area 1 on the one hand, and can play a certain supporting role on the end of the auxiliary platform on the other hand, and further ensure the stability of the auxiliary platform before the auxiliary platform is connected to the steel trestle 8.
[0026] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A structure for erecting an auxiliary platform in the approach bridge area, characterized in that: The invention comprises a bank filling area (1), auxiliary piles (2), a steel beam (3), a longitudinal distribution beam (4), a transverse secondary distribution beam (5), a panel (6) and a steel sheet pile (7). The auxiliary piles (2) are arranged in the bank filling area (1) and the lower part is driven into the bearing layer. The upper end of the auxiliary piles (2) is provided with a steel beam (3), a longitudinal distribution beam (4), a transverse secondary distribution beam (5) and a panel (6) in sequence from top to bottom. The steel sheet piles (7) are arranged on the water-facing side of the bank filling area (1), and the upper ends of the steel sheet piles (7) are supported on the longitudinal distribution beam (4).
2. The auxiliary platform erection structure for the approach bridge area according to claim 1, characterized in that: The top surface of the embankment filling area (1) is provided with a slope which gradually rises towards the waterfront side.
3. The auxiliary platform erection structure for the approach bridge area according to claim 1 is characterized by: The panel (6) is laid horizontally and is located at the same level as the surface layer of the steel trestle (8).
4. The auxiliary platform erection structure for the approach bridge area according to claim 1 is characterized by: The longitudinal distribution beam (4) is fixedly connected to the longitudinal distribution beam (4) of the steel trestle (8).
5. The auxiliary platform erection structure for the approach bridge area according to claim 1 is characterized by: The steel sheet piles (7) are Larsen steel sheet piles (7) which are arranged side by side on the water-facing side of the embankment filling area (1).
6. The auxiliary platform erection structure for the approach bridge area according to claim 1, characterized in that: The steel cross beam (3) and the longitudinal distribution beam (4) are buried in the embankment filling area (1).
7. The auxiliary platform erection structure for the approach bridge area according to claim 1, characterized in that: The auxiliary pile (2) is arranged at an end of the longitudinal distribution beam (4) away from the waterfront side.
8. The auxiliary platform erection structure for the approach bridge area according to claim 1, characterized in that: The distance between the auxiliary pile (2) and the nearest steel trestle (8) steel column is no more than 1.5 times the distance between the adjacent steel trestle (8) steel columns.