Movable foundation pier and sandbox integration device

By designing a mobile base pier and sandbox integration device, the problem of the existing base pier and sandbox being fixed and unable to move is solved, and the rapid layout and stability of on-site oil pipes and high-pressure pipelines are achieved, saving working hours and costs, and the device is compact in structure and better safe.

CN222687479UActive Publication Date: 2025-03-28HONGZE DONGJUN MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421248636.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2025-03-28
Estimated Expiration
2034-06-03

AI Technical Summary

Technical Problem

The existing foundation piers and sandboxes are fixed in a certain place and cannot be moved, resulting in a long cement pouring period and long solidification time, which extends the time of on-site operation.

Method used

A mobile base pier and sandbox integration device is designed, including bent base plate, steel plate, end plate, cover plate, seamless steel pipe, internal thread sleeve, flange pipeline support assembly, clamp assembly and ring screw. Through the welding and connection of these components, stable fixing and lifting of oil pipes and high-pressure flange pipelines are achieved.

Benefits of technology

It realizes rapid layout and stability of on-site oil pipes and high-pressure pipelines, shortens on-site working cycles, saves installation hours and labor costs, and the device has a compact structure, simple operation and better safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222687479U_ABST
    Figure CN222687479U_ABST
Patent Text Reader

Abstract

The utility model discloses a movable foundation pier and sandbox integration device, which belongs to the field of movable foundation piers and sandboxes and comprises a bent bottom plate, a cover plate, an internal thread sleeve, a flange pipeline support assembly, a hoop assembly and the like. The integrated device stabilizes on-site oil pipes and high-pressure pipelines. The integrated device is designed in a movable and integrated mode, and the oil pipe and the high-pressure flange pipeline can be fixed at the same time through the clamp assembly and the flange pipeline supporting assembly. According to the movable foundation pier and sandbox integration device, the on-site work period is shortened, and on-site typesetting of oil pipes and high-pressure pipelines is quicker and more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of mobile base piers and sand boxes, and in particular to a mobile base pier and sand box integrated device. Background Art

[0002] The foundation pier is mainly used in oil wellheads and natural gas extraction to hold down natural gas and oil pipelines, and the sandbox is mainly used to support high-pressure pipelines. Most of the foundation piers and sandboxes on site are cast with cement, fixed in a certain place and cannot be moved; and the cement casting period and solidification time are long, which prolongs the time of on-site operations. Summary of the invention

[0003] The utility model aims to provide a mobile foundation pier and sandbox integrated device for layout and stabilization of on-site oil pipes and high-pressure pipelines.

[0004] In view of the shortcomings of the previous base piers and sand boxes, this time a mobile base pier and sand box integrated device is specifically designed. The mobile base pier and sand box of the device are used to stabilize the on-site oil pipelines and high-pressure pipelines, shortening the on-site working cycle and making the layout of the on-site oil pipelines and high-pressure pipelines faster and more convenient.

[0005] The utility model provides the following technical solution: a mobile pier and sandbox integrated device, comprising a bending bottom plate (3) using integral bending, a steel plate (1), an end plate (6), and a cover plate (7) welded together, a seamless steel pipe (4) and an internal thread sleeve (5) installed in the middle, a flange pipeline support assembly (10) installed on the top and connected to the internal thread sleeve (5) through a TR thread, a clamp assembly (2) installed on the bottom, and the oil pipe and the high-pressure flange pipeline can be fixed at the same time through the clamp assembly (2) and the flange pipeline support assembly (10), the top lifting ring screw (8) is used for lifting, and a pier nameplate (9).

[0006] Preferably, the bending base plate (3) is bent in an integral manner.

[0007] Preferably, the top eye screw (8) is used for lifting.

[0008] Preferably, the top is provided with a flange pipeline support assembly (10) and is connected to the internal threaded sleeve (5) via a TR thread.

[0009] Preferably, the oil pipe and the high-pressure flange pipeline can be fixed simultaneously through the clamp assembly (2) and the flange pipeline support assembly (10).

[0010] The beneficial effects of the utility model are as follows: the utility model provides a mobile base pier and sand box integrated device with an integrated design, compact structure, simple operation, and more convenient and quick stabilization of on-site oil pipes and high-pressure pipelines; secondly, all parts are made of integral forgings, with greater body strength and better safety; furthermore, the overall device is movable, saving on-site installation time and labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the utility model;

[0012] In the figure: 1, steel plate 2, clamp assembly 3, bent bottom plate 4, seamless steel pipe 5, internal thread sleeve 6, end plate 7, cover plate 8, lifting eye screw 9, base pier nameplate 10, flange pipeline support assembly. DETAILED DESCRIPTION

[0013] The technical solution of the utility model is further explained below in conjunction with the accompanying drawings.

[0014] As shown in the figure, the high-pressure wellhead back pressure valve delivery tool comprises: a steel plate 1, a clamp assembly 2, a bent bottom plate 3, a seamless steel pipe 4, an internally threaded sleeve 5, an end plate 6, a cover plate 7, a lifting eye screw 8, a base pier nameplate 9, and a flange pipeline support assembly 10; the characteristics are: the bent bottom plate (3) uses an integral bending, the steel plate (1), the end plate (6), and the cover plate (7) are welded together, a seamless steel pipe (4) and an internally threaded sleeve (5) are installed in the middle, a flange pipeline support assembly (10) is installed on the top and is connected to the internally threaded sleeve (5) through a TR thread, a clamp assembly (2) is installed at the bottom, and the oil pipe and the high-pressure flange pipeline can be fixed at the same time through the clamp assembly (2) and the flange pipeline support assembly (10), the top lifting eye screw (8) is used for lifting, and the base pier nameplate (9).

[0015] Preferably, the bending base plate (3) is bent in an integral manner.

[0016] Preferably, the top eye screw (8) is used for lifting.

[0017] Preferably, the top is provided with a flange pipeline support assembly (10) and is connected to the internal threaded sleeve (5) via a TR thread.

[0018] Preferably, the oil pipe and the high-pressure flange pipeline can be fixed simultaneously through the clamp assembly (2) and the flange pipeline support assembly (10).

[0019] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A mobile foundation pier and sandbox integrated device, characterized in that: The invention comprises a bending bottom plate (3) which is integrally bent, a steel plate (1), an end plate (6), and a cover plate (7) which are welded together, a seamless steel pipe (4) and an internal thread sleeve (5) are installed in the middle, a flange pipeline support assembly (10) is installed on the top and is connected to the internal thread sleeve (5) through a TR thread, a clamp assembly (2) is installed on the bottom, and the oil pipe and the high-pressure flange pipeline can be fixed at the same time through the clamp assembly (2) and the flange pipeline support assembly (10), a top lifting eye screw (8) is used for lifting, and a base pier nameplate (9) is provided.

2. The mobile foundation pier and sandbox integrated device according to claim 1 is characterized in that: The bending base plate (3) is bent in an integral manner.

3. The mobile foundation pier and sandbox integrated device according to claim 1 is characterized in that: The top eye screw (8) is used for lifting.

4. The mobile foundation pier and sandbox integrated device according to claim 1 is characterized in that: The top is provided with a flange pipeline support assembly (10) and is connected to the internal thread sleeve (5) via a TR thread.

5. The mobile foundation pier and sandbox integrated device according to claim 1 is characterized in that: The clamp assembly (2) and the flange pipeline support assembly (10) can realize simultaneous fixing of the oil pipe and the high-pressure flange pipeline.