A biochemical simulation experimental equipment for sewage treatment
By designing sewage treatment biochemical simulation experimental equipment with movable partitions in sewage treatment simulation experimental equipment, the problem that fixed volume design in the existing technology cannot meet different sewage treatment needs is solved, and more accurate experimental results and design reference data are achieved.
Patent Information
- Application Number
- CN202421424525.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-20
AI Technical Summary
Due to the fixed volume design, the existing sewage treatment simulation experimental equipment cannot meet the actual needs of treating different types of sewage, resulting in a deviation from the actual sewage treatment effect and cannot provide accurate data support.
A biochemical simulation experimental equipment for sewage treatment was designed, including anaerobic boxes, hypoxic boxes, aerobic boxes and precipitation boxes. The volume of each treatment box is changed by moving the adjustment partition, thereby determining the optimal volume ratio for different types of sewage.
The treatment box volume is adjusted according to different sewage types, and an experimental device is provided to verify the biochemical treatment efficiency of different types of sewage, and design reference data is provided for later sewage treatment projects, which improves the accuracy of experimental results.
Smart Images

Figure CN222700133U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage treatment, in particular to a biochemical simulation experimental equipment for sewage treatment. Background Art
[0002] Wastewater treatment has always been the focus of research in the field of environmental protection. As a commonly used tool in scientific research, wastewater treatment biochemical simulation experimental equipment is of great significance for studying wastewater treatment technology, optimizing treatment processes and later sewage treatment project construction.
[0003] Existing sewage treatment simulation experimental equipment usually adopts a fixed-volume treatment box design. Although it can simulate the basic process of sewage treatment, when treating different types of sewage, due to differences in sewage composition, concentration and treatment difficulty, the fixed volume ratio often cannot meet actual needs. This leads to deviations between the experimental results and the actual sewage treatment effects, and cannot provide accurate data support for the optimization of sewage treatment processes. It also affects the accuracy of the subsequent sewage treatment project construction, resulting in unnecessary waste of resources.
[0004] Therefore, the utility model proposes a sewage treatment biochemical simulation experiment equipment to solve the above problems. Utility Model Content
[0005] The embodiment of the utility model aims to provide a sewage treatment biochemical simulation experiment equipment to solve the above problems.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A biochemical simulation experiment equipment for sewage treatment comprises an anaerobic box, an anoxic box, an aerobic box and a sedimentation box, wherein the anaerobic box, the anoxic box, the aerobic box and the sedimentation box are connected in sequence, a sludge pump is provided on the sedimentation box, and three sludge return pipes are connected to the output end of the sludge pump, which are respectively used for sludge to return to the anaerobic box, the anoxic box and the aerobic box, a first partition plate is provided in the anaerobic box, which is adapted to the internal contour of the anaerobic box and can be moved and adjusted along the anaerobic box, a second partition plate is provided in the anoxic box, which is adapted to the internal contour of the anoxic box and can be moved and adjusted along the anoxic box, and a third partition plate is provided in the aerobic box, which is adapted to the internal contour of the aerobic box and can be moved and adjusted along the aerobic box, and sealing strips are provided on the sides of the first partition plate, the second partition plate and the third partition plate.
[0008] In an optional solution: the anaerobic box is provided with a first adjustment mechanism for realizing movement and adjustment of the first partition, the anoxic box is provided with a second adjustment mechanism for realizing movement and adjustment of the second partition, and the aerobic box is provided with a third adjustment mechanism for realizing movement and adjustment of the third partition.
[0009] In an optional solution: the first adjustment mechanism includes a threaded rod rotatably arranged inside the anaerobic box, an internally threaded barrel threadedly sleeved on the threaded rod, and a rotating rod rotatably arranged on one side of the anaerobic box, one end of the internally threaded barrel away from the threaded rod is fixedly connected to the first partition, a bevel gear transmission assembly is provided between the rotating rod and the threaded rod, and a handwheel is provided at one end of the rotating rod located outside the anaerobic box, and the second adjustment mechanism and the third adjustment mechanism are completely the same in structure as the first adjustment mechanism.
[0010] In an optional scheme: a first water pipe is provided between the anaerobic box and the anoxic box, a first sewage pump is provided on the first partition, and a first hose is provided between the output end of the first sewage pump and the end of the first water pipe away from the anoxic box, a second water pipe is provided between the anoxic box and the aerobic box, a second sewage pump is provided on the second partition, and a second hose is provided between the output end of the second sewage pump and the end of the second water pipe away from the aerobic box, a third water pipe is provided between the aerobic box and the sedimentation tank, a third sewage pump is provided on the third partition, and a third hose is provided between the output end of the third sewage pump and the end of the third water pipe away from the sedimentation tank.
[0011] In an optional solution, volume scale lines are provided on the inner walls of the anaerobic box, the anoxic box and the aerobic box.
[0012] Compared with the prior art, the beneficial effects of the embodiments of the present invention are as follows:
[0013] The sewage is treated in the anaerobic tank, anoxic tank, aerobic tank and sedimentation tank in turn according to the process flow. According to the different types of sewage, the volume of the anaerobic tank, aerobic tank and aerobic tank is changed by moving and adjusting the baffles, so as to determine the optimal volume ratio between the anaerobic tank, anoxic tank and aerobic tank when treating different types of sewage, provide a verification experimental device for the efficiency of biochemical treatment of different types of sewage, and provide design reference data for the construction size of each sewage pool in the later sewage treatment project.
[0014] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The drawings herein are incorporated into and constitute a part of the specification to illustrate embodiments consistent with the present application and are used together with the specification to explain the principles of the present application. At the same time, these drawings and text descriptions are not intended to limit the scope of the concept of the present application in any way, but to illustrate the concept of the present application for those skilled in the art by referring to specific embodiments.
[0016] Figure 1 It is a structural schematic diagram of the utility model.
[0017] Figure 2 It is a three-dimensional diagram of the first partition in the utility model.
[0018] Figure 3 It is a structural schematic diagram of the first adjustment mechanism in the utility model.
[0019] Notes on figure numbers: 1- anaerobic box, 2- anoxic box, 3- aerobic box, 4- sedimentation box, 5- first partition, 6- first adjustment mechanism, 7- second partition, 8- second adjustment mechanism, 9- third partition, 10- third adjustment mechanism, 11- first sewage pump, 12- first hose, 13- second sewage pump, 14- second hose, 15- third sewage pump, 16- third hose, 17- first water pipe, 18- second water pipe, 19- third water pipe, 20- sludge pump, 21- sludge return pipe, 22- volume scale line, 23- sealing strip, 24- threaded rod, 25- internally threaded cylinder, 26- bevel gear transmission assembly, 27- rotating rod, 28- handwheel. DETAILED DESCRIPTION
[0020] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0021] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.
[0022] See also Figure 1 and Figure 2A biochemical simulation experiment equipment for sewage treatment comprises an anaerobic box 1, an anoxic box 2, an aerobic box 3 and a sedimentation box 4, wherein the anaerobic box 1, the anoxic box 2, the aerobic box 3 and the sedimentation box 4 are connected in sequence, the sedimentation box 4 is provided with a sludge pump 20, and the output end of the sludge pump 20 is connected with three sludge return pipes 21 respectively used for sludge to return to the anaerobic box 1, the anoxic box 2 and the aerobic box 3, the anaerobic box 1 is provided with a first partition 5 which is adapted to the internal contour of the anaerobic box 1 and can be moved and adjusted along the anaerobic box 1, the anoxic box 2 is provided with a second partition 7 which is adapted to the internal contour of the anoxic box 2 and can be moved and adjusted along the anoxic box 2, the aerobic box 3 is provided with a third partition 9 which is adapted to the internal contour of the aerobic box 3 and can be moved and adjusted along the aerobic box 3, and the first partition 5, the second partition 7 and the third partition 9 are all provided with sealing strips 23 on their sides.
[0023] It should be noted that the sealing between the partition and the wall of each processing box is achieved by the sealing strip 23, and the partition in each processing box is similar to the form of a "sealing piston".
[0024] The sewage is sequentially treated in the anaerobic tank 1, the anoxic tank 2, the aerobic tank 3 and the sedimentation tank 4 according to the process flow. According to different sewage types, the volume of the anaerobic tank 1 is changed and adjusted by moving the first baffle 5, the volume of the anoxic tank 2 is changed and adjusted by moving the second baffle 5, and the volume of the aerobic tank 3 is changed and adjusted by moving the third baffle 9, so as to determine the optimal volume ratio among the anaerobic tank 1, the anoxic tank 2 and the aerobic tank 3 when treating different types of sewage, provide a verification experimental device for the efficiency of biochemical treatment of different types of sewage, and provide design reference data for the construction size of each sewage pool in the later sewage treatment project.
[0025] Furthermore, the inner walls of the anaerobic box 1, the anoxic box 2 and the aerobic box 3 are all provided with volume scale lines 22. When the partition is moved and adjusted, the volume of the treatment box at this time can be accurately known by reading the value on the volume scale line 22 on the side of the partition.
[0026] See also Figure 1 and Figure 3 In one embodiment of the utility model, the anaerobic box 1 is provided with a first adjustment mechanism 6 for realizing movement and adjustment of the first partition 5, the anoxic box 2 is provided with a second adjustment mechanism 8 for realizing movement and adjustment of the second partition 7, and the aerobic box 3 is provided with a third adjustment mechanism 10 for realizing movement and adjustment of the third partition 9;
[0027] The first adjustment mechanism 6 includes a threaded rod 24 rotatably arranged inside the anaerobic box 1, an internally threaded barrel 25 threadably sleeved on the threaded rod 24, and a rotating rod 27 rotatably passed through one side of the anaerobic box 1. One end of the internally threaded barrel 25 away from the threaded rod 24 is fixedly connected to the first partition plate 5. A bevel gear transmission assembly 26 is provided between the rotating rod 27 and the threaded rod 24, and a hand wheel 28 is provided at one end of the rotating rod 27 located outside the anaerobic box 1. The second adjustment mechanism 8 and the third adjustment mechanism 10 have the same structure as the first adjustment mechanism 6.
[0028] In this embodiment, the rotating rod 27 is rotated by the hand wheel 28, and the threaded rod 24 is driven to rotate under the transmission action of the bevel gear transmission assembly 26. Since the threaded rod 24 and the internal threaded tube 25 are threadedly matched and the internal threaded tube 25 is fixedly connected to the first partition 5, the rotation of the threaded rod 24 drives the internal threaded tube 25 to "extend and retract", thereby driving the first partition 5 to move and adjust along the anaerobic box 1, thereby changing and adjusting the volume of the anaerobic box 1. The anoxic box 2 and the aerobic box 3 both adopt the same structure as above to achieve movement and adjustment.
[0029] See also Figure 1 In one embodiment of the utility model, a first water pipe 17 is provided between the anaerobic box 1 and the anoxic box 2, a first sewage pump 11 is provided on the first partition plate 5, and a first hose 12 is provided between the output end of the first sewage pump 11 and the end of the first water pipe 17 away from the anoxic box 2, a second water pipe 18 is provided between the anoxic box 2 and the aerobic box 3, a second sewage pump 13 is provided on the second partition plate 7, and a second hose 14 is provided between the output end of the second sewage pump 13 and the end of the second water pipe 18 away from the aerobic box 3, a third water pipe 19 is provided between the aerobic box 3 and the sedimentation box 4, a third sewage pump 15 is provided on the third partition plate 9, and a third hose 16 is provided between the output end of the third sewage pump 15 and the end of the third water pipe 19 away from the sedimentation box 4.
[0030] In this embodiment, the treated sewage in the anaerobic tank 1 is pumped to the anoxic tank 2 for treatment by the first sewage pump 11, the treated sewage in the anoxic tank 2 is pumped to the aerobic tank 3 for treatment by the second sewage pump 13, and the treated sewage in the aerobic tank 3 is pumped to the sedimentation tank 4 for treatment by the third sewage pump 15.
[0031] Furthermore, in this embodiment, the sedimentation tank 4 is also provided with a discharge port for discharging the treated sewage.
[0032] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.
[0033] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A sewage treatment biochemical simulation experiment equipment, comprising an anaerobic box (1), an anoxic box (2), an aerobic box (3) and a sedimentation box (4), wherein the anaerobic box (1), the anoxic box (2), the aerobic box (3) and the sedimentation box (4) are connected in sequence, and the sedimentation box (4) is provided with a sludge pump (20), and the output end of the sludge pump (20) is connected with three sludge return pipes (21) for returning sludge to the anaerobic box (1), the anoxic box (2) and the aerobic box (3), respectively, wherein: The anaerobic box (1) is provided with a first partition (5) adapted to the internal contour of the anaerobic box (1) and movable and adjustable along the anaerobic box (1); the anoxic box (2) is provided with a second partition (7) adapted to the internal contour of the anoxic box (2) and movable and adjustable along the anoxic box (2); the aerobic box (3) is provided with a third partition (9) adapted to the internal contour of the aerobic box (3) and movable and adjustable along the aerobic box (3); and the first partition (5), the second partition (7) and the third partition (9) are all provided with sealing strips (23) on their sides.
2. The sewage treatment biochemical simulation experiment equipment according to claim 1 is characterized in that: The anaerobic box (1) is provided with a first adjustment mechanism (6) for realizing movement and adjustment of a first partition (5), the anoxic box (2) is provided with a second adjustment mechanism (8) for realizing movement and adjustment of a second partition (7), and the aerobic box (3) is provided with a third adjustment mechanism (10) for realizing movement and adjustment of a third partition (9).
3. The sewage treatment biochemical simulation experiment equipment according to claim 2 is characterized in that: The first adjustment mechanism (6) comprises a threaded rod (24) rotatably arranged inside the anaerobic box (1), an internally threaded barrel (25) threadably sleeved on the threaded rod (24), and a rotating rod (27) rotatably passed through one side of the anaerobic box (1); one end of the internally threaded barrel (25) away from the threaded rod (24) is fixedly connected to the first partition plate (5); a bevel gear transmission assembly (26) is arranged between the rotating rod (27) and the threaded rod (24); and a hand wheel (28) is arranged at one end of the rotating rod (27) located outside the anaerobic box (1); the second adjustment mechanism (8) and the third adjustment mechanism (10) are completely identical in structure to the first adjustment mechanism (6).
4. The sewage treatment biochemical simulation experiment equipment according to claim 1 is characterized in that: A first water conduit (17) is provided between the anaerobic box (1) and the anoxic box (2); a first sewage pump (11) is provided on the first partition plate (5); a first hose (12) is provided between the output end of the first sewage pump (11) and the end of the first water conduit (17) away from the anoxic box (2); a second water conduit (18) is provided between the anoxic box (2) and the aerobic box (3); a second sewage pump (13) is provided on the second partition plate (7); a second hose (14) is provided between the output end of the second sewage pump (13) and the end of the second water conduit (18) away from the aerobic box (3); a third water conduit (19) is provided between the aerobic box (3) and the sedimentation box (4); a third sewage pump (15) is provided on the third partition plate (9); a third hose (16) is provided between the output end of the third sewage pump (15) and the end of the third water conduit (19) away from the sedimentation box (4).
5. The sewage treatment biochemical simulation experiment equipment according to claim 1 is characterized in that: The inner walls of the anaerobic box (1), the anoxic box (2) and the aerobic box (3) are all provided with volume graduation lines (22).