Toe-crossing board construction road structure

By pouring step-type bases of equal width on the toe slabs and erecting steel gabions, the road foundation and concrete pavement are formed, which solves the problem of difficult and high cost in the construction of traditional cross-toe slab transportation roads, and achieves low-cost and low-difficulty construction results.

CN222700750UActive Publication Date: 2025-04-01POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420992101.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2025-04-01
Estimated Expiration
2034-05-09

AI Technical Summary

Technical Problem

The construction of traditional cross-toe plate transportation roads is difficult and expensive, which is not conducive to promotion and application.

Method used

The step-type base and road infrastructure are adopted, including pouring step-type bases of equal width on the toe plate, filling the road foundation, and erecting several layers of steel gabions on both sides, and laying concrete pavement on the top.

Benefits of technology

It reduces construction costs and difficulty, reduces damage to the toe plate structure, and ensures the passing of the cross-toe plate transportation road.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222700750U_ABST
    Figure CN222700750U_ABST
Patent Text Reader

Abstract

The utility model provides a toe board construction road structure which comprises a step type base poured on a toe board, the width of the step type base is equal to that of the toe board, a road foundation is filled on the step type base, a plurality of reinforced gabions are respectively arranged on two sides of the road foundation, and a concrete pavement is paved on the road foundation. The material circulation performance is good, the trafficability of a toe board transportation road can be guaranteed, and meanwhile damage to the toe board structure in the construction process can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction roads, in particular to a toe-slab construction road structure. Background Art

[0002] Panel dams are usually designed with toe boards. During the construction of panel dams, most of the dam body filling materials come from upstream and need to be transported across the toe board to the dam surface. Therefore, it is necessary to build a transportation construction road across the toe board. The toe board has a steep slope and a large span. Traditional solutions such as steel frame bridges are difficult and expensive to construct, which is not conducive to promotion and application. Utility Model Content

[0003] The purpose of the utility model is to overcome the deficiencies of the above-mentioned prior art and provide a toe-slab construction road structure, which can solve the problems of great construction difficulty and high cost of traditional toe-slab transport roads.

[0004] To this end, the utility model adopts the following technical solutions:

[0005] A road structure constructed across a toe plate comprises a stepped base cast on the toe plate, the stepped base is as wide as the toe plate, a road foundation is built on the stepped base, a plurality of reinforced gabions are arranged on both sides of the road foundation, and a concrete pavement is paved on the road foundation.

[0006] On the basis of adopting the above technical solutions, the present invention can also adopt the following further technical solutions, or use these further technical solutions in combination:

[0007] The road foundation is composed of several layers of steel-plastic grids and slag foundations distributed at intervals. The upper surface of the stepped base is filled with the slag foundation. A layer of the steel-plastic grid is laid between two adjacent layers of the slag foundation, and the concrete pavement is laid on the top slag foundation.

[0008] A plurality of the reinforced gabions are respectively arranged in two rows on both sides of the road foundation, wherein the two rows of the reinforced gabions adjacent to the road foundation are at the same height as the road foundation, and the height of the other two rows of the reinforced gabions is higher than half of the road foundation.

[0009] The road foundation is composed of several layers of steel-plastic grids and slag foundations distributed at intervals. The height of each layer of the slag foundation is equal, and the upper surface of the adjacent reinforced gabions on one side of each layer of the slag foundation is flush with its upper surface. A layer of the steel-plastic grid is laid between two adjacent layers of the slag foundation, and the steel-plastic grid is laid to the upper surface of the adjacent reinforced gabions.

[0010] Compared with the prior art, the utility model has the following advantages and beneficial effects: low cost, convenient construction, good material recycling, and can not only ensure the passability of the cross-toe board transportation road, but also reduce the damage to the toe board structure during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a typical cross-sectional schematic diagram of the utility model.

[0012] Figure 2 For this utility model Figure 1 Schematic diagram of the cross section along the AA direction. DETAILED DESCRIPTION

[0013] In order to enable those skilled in the art to better understand the technical solution of the present utility model, the preferred implementation scheme of the present utility model is described below in conjunction with specific embodiments. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent elements with the same or similar functions. However, it should be understood that the accompanying drawings are only used for illustrative purposes and cannot be understood as limitations on the present utility model. In order to better illustrate the present embodiment, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted, and the positional relationship described in the accompanying drawings is only used for illustrative purposes and cannot be understood as limitations on the present utility model.

[0014] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0015] The utility model provides a cross-toe plate construction road structure, such as Figure 1 As shown, it includes a stepped base 1 cast on the toe plate 5, the stepped base 1 is as wide as the toe plate 5, a road foundation 3 is filled on the stepped base 1, a number of reinforced gabions 2 are respectively provided on both sides of the road foundation 3, a concrete pavement 4 is paved on the road foundation 3, and the concrete pavement 4 is flush with the dam surface of the panel dam, so as to facilitate the transportation of the required dam body filling materials from the upstream to the dam surface.

[0016] comprehensive Figure 1 and Figure 2 It can be seen that the toe board 5 extends upwardly at an angle, and correspondingly, the stepped base 1 extends upwardly, the height difference between two adjacent steps is equal, and the surface length of each step is 80 cm.

[0017] The road foundation 3 is composed of several layers of steel-plastic grids 31 and slag foundations 32 distributed at intervals. The upper surface of the stepped base 1 is filled with the slag foundation 32, and a layer of steel-plastic grid 31 is laid between the upper and lower adjacent layers of slag foundations 32. A concrete pavement 4 is laid on the top slag foundation 32.

[0018] A plurality of reinforced gabions 2 are respectively set up with two rows of reinforced gabions on both sides of the road foundation 3, wherein the two rows of reinforced gabions adjacent to the road foundation 3 are at the same height as the road foundation 3, and the height of the other two rows of reinforced gabions is higher than half of the road foundation 3. Figure 1 As shown, since there is a height difference between adjacent steps of the stepped base 1, the number of reinforced gabions 2 in the reinforced gabion group located on the lower side is relatively large. In this embodiment, the reinforced gabion group adjacent to the road foundation 3 and located on the lower side consists of four layers of reinforced gabions 2, while the reinforced gabion group adjacent to the road foundation 3 and located on the higher side consists of two and a half layers of reinforced gabions 2. Three layers of reinforced gabions 2 are arranged on the step one step lower than the four layers of reinforced gabions 2, and one layer of reinforced gabions 2 is arranged on the step one step higher than the two and a half layers of reinforced gabions 2.

[0019] The road foundation 3 is composed of several layers of steel-plastic grilles 31 and slag foundations 32 distributed at intervals. The height of each layer of slag foundation 32 is equal, and the upper surface of the adjacent reinforced gabion 2 on one side of each layer of slag foundation 32 is flush with its upper surface. A layer of steel-plastic grille 31 is laid between two adjacent layers of slag foundation 32, and the steel-plastic grille 31 is laid to the upper surface of the adjacent reinforced gabion 2.

[0020] When the dam body is filled to the elevation where the concrete pavement 4 is located, the concrete pavement 4, the road foundation 3 and the reinforced gabion 2 of the utility model need to be removed, and the stepped base 1 is retained for passage, which is more labor-saving.

[0021] According to the description and drawings of the utility model, those skilled in the art can easily manufacture or use a toe-slab construction road structure of the utility model, and can produce the positive effects recorded in the utility model.

[0022] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present utility model and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be an internal connection between two mechanisms, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.

[0023] In the description of the present invention, it should be understood that the terms "one end", "the other end", "outside", "inside", "horizontal", "end", "length", "outer end", "left", "right" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the mechanism or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present invention. The terms "first" and "second" are also used only for the simplicity of description, and do not indicate or imply relative importance.

[0024] Furthermore, in practicing the claims of the present invention, those skilled in the art may understand and affect variations to the disclosed embodiments by studying the drawings, disclosure, and appended claims. In addition, in the claims and the specification, words such as "comprises", "comprising", etc. do not exclude other elements or steps, and non-plural nouns do not exclude their plural forms.

[0025] The above is only a preferred embodiment of the present invention and is not intended to limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made according to the present invention are covered by the scope of the claims of the present invention and will not be listed one by one here.

Claims

1. A road structure constructed across a toe plate, comprising a stepped base (1) cast on a toe plate (5), characterized in that: The stepped base (1) is as wide as the toe plate (5), a road foundation (3) is built on the stepped base (1), a plurality of reinforced gabions (2) are respectively provided on both sides of the road foundation (3), a concrete pavement (4) is paved on the road foundation (3), the road foundation (3) is composed of a plurality of layers of steel-plastic grids (31) and slag foundations (32) distributed at intervals, the upper surface of the stepped base (1) is filled with the slag foundation (32), a layer of the steel-plastic grid (31) is laid between two adjacent layers of the slag foundation (32), and the concrete pavement (4) is laid on the top of the slag foundation (32).

2. A toe-slab construction road structure as claimed in claim 1, characterized in that: A plurality of the steel gabions (2) are respectively provided with two rows of steel gabion groups on both sides of the road foundation (3), wherein the two rows of the steel gabion groups adjacent to the road foundation (3) are at the same height as the road foundation (3), and the heights of the other two rows of the steel gabion groups are higher than one half of the road foundation (3).

3. A toe-slab construction road structure as claimed in claim 1, characterized in that: The height of each layer of the slag foundation (32) is equal, and the upper surface of the adjacent reinforced gabion (2) on one side of each layer of the slag foundation (32) is flush with its upper surface, and a layer of the steel-plastic grid (31) is laid between two adjacent layers of the slag foundation (32), and the steel-plastic grid (31) is laid to the upper surface of the adjacent reinforced gabion (2).