A pull rod assembly for built-in thermal insulation shear wall
By designing a built-in pull rod assembly for insulation shear walls, the problem of the displacement of insulation materials during construction is solved, the stable fixation of the insulation layer and the effective installation of the wire mesh are achieved, and the construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202421332953.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-12
AI Technical Summary
During the construction of thermal insulation shear walls, the lack of effective support structure causes thermal insulation materials to easily displace, resulting in uneven coverage, delay construction speed and reduce quality.
A built-in duct rod assembly for insulation shear walls is designed, including long cylindrical inner duct rods, plastic positioning disks, inner columns, outer columns, plastic limit disks and wire mesh grooves. Through the synergy of these components, the insulation layer is fixed and the wire mesh is installed stably to avoid displacement.
Through the fixing of the inner pull rod and other components, the insulation layer is prevented from being offset during the construction process, the stability of the pull rod assembly is improved, and the construction quality and efficiency of the insulation wall are ensured.
Smart Images

Figure CN222701205U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of thermal insulation walls, in particular to a pull rod assembly for a built-in thermal insulation shear wall. Background Art
[0002] Shear wall insulation is a common building insulation material. Its main function is to improve the thermal insulation performance of buildings, reduce energy consumption, and improve indoor comfort. Shear wall insulation is usually filled with materials such as polystyrene, polyurethane foam or rock wool inside the building wall. These materials have good thermal insulation performance and durability, can effectively insulate and preserve heat, reduce energy loss, and improve the energy efficiency of buildings.
[0003] As a common building insulation technology, shear wall insulation plays an important role in improving building energy efficiency, improving indoor comfort, saving energy and protecting the environment. With the improvement of people's awareness of energy conservation and environmental protection and the support of relevant policies, shear wall insulation will have broader application prospects in the future.
[0004] During the construction of the insulation shear wall, a supporting structure is required to fix the insulation material. Otherwise, the insulation material is prone to displacement, resulting in uneven coverage, which not only delays the construction speed but also reduces the construction quality. Therefore, a tensioning support device is needed to fix the insulation material to improve the construction quality. Utility Model Content
[0005] The utility model aims to provide a pull rod assembly for a built-in thermal insulation shear wall to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A tie rod assembly for a built-in thermal insulation shear wall comprises an inner tie rod, which is in the shape of a long cylindrical strip. A plastic positioning disk is provided at one end of the inner tie rod, an inner cylinder is fixedly provided on the right side of the plastic positioning disk, an inner thread is fixedly provided on the inner side of the inner cylinder and the inner thread is engaged with the outer thread, an outer cylinder is fixedly provided on the left side of the plastic positioning disk, an inner thread is fixedly provided on the inner side of the outer cylinder and the inner thread is engaged with the outer thread, a plastic limiting disk is provided at the other end of the inner tie rod, a plastic nut is fixedly provided on the right side of the plastic limiting disk, an inner thread is provided on the inner side of the plastic nut and the inner thread is engaged with the outer thread, a steel wire mesh groove is provided on the end of the outer cylinder away from the plastic positioning disk, a steel wire mesh is provided in the steel wire mesh groove, and a rod cap is fixedly provided on the outside of the outer cylinder at the end of the inner tie rod.
[0008] As a further solution of the utility model: the inner pull rod is made of glass fiber material.
[0009] As a further solution of the utility model: external threads are evenly arranged on the inner pull rod.
[0010] As a further solution of the utility model: the central axes of the plastic positioning plate, the inner cylinder and the outer cylinder are the same.
[0011] As a further solution of the utility model: the side wall of the wire mesh groove is provided with a guiding portion, and the side wall of the wire mesh groove is provided with a limiting portion outside the guiding portion.
[0012] As a further solution of the utility model: the rod cap is replaced by a plastic limiting disk, and a plastic nut is fixedly arranged on the outer side of the plastic limiting disk.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0014] 1. The inner tie rod is used as a connector to pass through the insulation layer to facilitate the installation of subsequent components. The inner tie rod has good thermal insulation and will not rust, and plays a good role in thermal insulation. The plastic positioning plate, inner column, outer column, plastic limit plate and plastic nut fix the inner tie rod and insulation layer to prevent the displacement of the insulation layer during pouring, thereby improving the stability of the tie rod assembly;
[0015] 2. The guide part guides the steel mesh to facilitate the placement of the steel mesh into the steel mesh slot. The limit part limits the steel mesh, and the rod cap limits the steel mesh for a second time. There is no need to use wire ties to fix the steel mesh, which improves the construction quality of the insulation wall.
[0016] 3. Use the plastic limit plate to limit the wire mesh to prevent it from slipping out of the wire mesh groove and improve the stability of the wire mesh. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of Example 1 of the utility model.
[0018] Figure 2 This is a schematic diagram of the main structure of Example 1 of the utility model.
[0019] Figure 3 This is a schematic diagram of the cross-sectional structure at AA in Example 1 of the utility model.
[0020] Figure 4 It is a schematic diagram of the local enlarged structure of point C in Example 1 of the utility model.
[0021] Figure 5 This is a schematic diagram of the cross-sectional structure at BB in Example 1 of the utility model.
[0022] Figure 6It is a schematic diagram of the local three-dimensional structure of the plastic positioning plate in Example 1 of the utility model.
[0023] Figure 7 This is a schematic diagram of the three-dimensional structure of Example 2 of the utility model.
[0024] Figure 8 It is a schematic diagram of the local three-dimensional structure of the plastic limiting plate in Example 2 of the utility model.
[0025] Notes on the figure numbers: 1. Inner pull rod; 2. External thread; 3. Plastic positioning plate; 4. Inner cylinder; 5. Outer cylinder; 6. Wire mesh groove; 7. Guide part; 8. Limit part; 9. Wire mesh; 10. Rod cap; 11. Plastic limiting plate; 12. Plastic nut. DETAILED DESCRIPTION
[0026] The following embodiments will be combined with the accompanying drawings to describe the utility model in detail. In the drawings or descriptions, similar or identical parts use the same reference numerals, and in actual applications, the shape, thickness or height of each component can be enlarged or reduced. The various embodiments listed in the utility model are only used to illustrate the utility model, and are not used to limit the scope of the utility model. Any obvious modifications or changes made to the utility model do not depart from the spirit and scope of the utility model.
[0027] Example 1
[0028] See also Figures 1 to 6 In the embodiment of the utility model, a tie rod assembly for a built-in thermal insulation shear wall includes an inner tie rod 1, which is in the shape of a long cylindrical strip, and is made of glass fiber material. The inner tie rod 1 is evenly provided with outer threads 2, and a plastic positioning disk 3 is provided at one end of the inner tie rod 1. An inner cylinder 4 is fixedly provided on the right side of the plastic positioning disk 3, and an inner thread is fixedly provided on the inner side of the inner cylinder 4 and the inner thread is engaged with the outer thread 2. An outer cylinder 5 is fixedly provided on the left side of the plastic positioning disk 3, and an inner thread is fixedly provided on the inner side of the outer cylinder 5 and the inner thread is engaged with the outer thread 2. The central axes of the plastic positioning disk 3, the inner cylinder 4 and the outer cylinder 5 are parallel to each other. At the same time, a plastic limit plate 11 is provided at the other end of the inner pull rod 1, and a plastic nut 12 is fixedly provided on the right side of the plastic limit plate 11. An inner thread is provided on the inner side of the plastic nut 12 and the inner thread is engaged with the outer thread 2. The inner pull rod 1 is used as a connecting piece to pass through the insulation layer to facilitate the installation of subsequent components. The inner pull rod 1 has good thermal insulation and will not rust, and plays a good role in thermal insulation. The plastic positioning plate 3, inner cylinder 4, outer cylinder 5, plastic limit plate 11 and plastic nut 12 fix the inner pull rod 1 and the insulation layer to prevent the insulation layer and the inner pull rod 1 from shifting during pouring, thereby improving the stability of the pull rod assembly.
[0029] A wire mesh groove 6 is provided on the end of the outer column 5 away from the plastic positioning plate 3, and a guide portion 7 is provided on the side wall of the wire mesh groove 6. A limiting portion 8 is provided on the side wall of the wire mesh groove 6 outside the guide portion 7, and a wire mesh 9 is provided in the wire mesh groove 6. A rod cap 10 is fixedly provided on the end of the inner pull rod 1 outside the outer column 5. The wire mesh 9 is guided by the guide portion 7 to facilitate the placement of the wire mesh 9 into the wire mesh groove 6. The limiting portion 8 limits the wire mesh 9, and the rod cap 10 limits the wire mesh 9 for a second time. There is no need to use wire to fix the wire mesh 9, thereby improving the construction quality of the insulation wall.
[0030] When the device is used, first open a circular hole on the insulation layer, insert the inner pull rod 1 into the circular hole, slide the plastic positioning plate 3 and the outer cylinder 5 from one end of the inner pull rod 1, and then slide the plastic limiting plate 11 and the plastic nut 12 from the other end, and then the plastic positioning plate 3, the inner cylinder 4, the outer cylinder 5, the plastic limiting plate 11 and the plastic nut 12 are used to fix the insulation layer and the inner pull rod 1, and then the wire mesh 9 is installed from the guide part 7 to the wire mesh groove 6, and then the limiting part 8 limits the wire mesh 9, and the rod cap 10 is fixedly installed on the side of the inner pull rod 1 located on the outer cylinder 5, thereby realizing the installation of the pull rod assembly.
[0031] Example 2
[0032] See also Figures 7-8 On the basis of Example 1, the rod cap 10 is replaced by a plastic limiting plate 11, and a plastic nut 12 is fixedly provided on the outside of the plastic limiting plate 11. The plastic limiting plate 11 is used to limit the insulation layer to prevent the insulation layer from displacement, thereby enhancing the stability of the insulation layer during concrete pouring.
[0033] When the device is used, first open a circular hole on the insulation wall, insert the inner pull rod 1 into the circular hole, slide the plastic positioning plate 3, inner cylinder 4 and outer cylinder 5 from one end of the inner pull rod 1, and then slide the plastic limit plate 11 and plastic nut 12 from the other end, and then the plastic positioning plate 3, inner cylinder 4, outer cylinder 5, plastic limit plate 11 and plastic nut 12 are used to fix the insulation layer and the inner pull rod 1, and then the wire mesh 9 is installed from the guide part 7 to the wire mesh groove 6, and then the limiting part 8 limits the wire mesh 9, and the plastic limit plate 11 and plastic nut 12 are installed on the side of the inner pull rod 1 located on the outer cylinder 5, thereby realizing the installation of the pull rod assembly.
[0034] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0035] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A tie rod assembly for an internal thermal insulation shear wall, comprising an inner tie rod (1), characterized in that: The inner pull rod (1) is in the shape of an elongated cylinder. A plastic positioning plate (3) is provided at one end of the inner pull rod (1). An inner cylinder (4) is fixedly provided on the right side of the plastic positioning plate (3). An inner thread is fixedly provided on the inner side of the inner cylinder (4) and the inner thread engages with the outer thread (2). An outer cylinder (5) is fixedly provided on the left side of the plastic positioning plate (3). An inner thread is fixedly provided on the inner side of the outer cylinder (5) and the inner thread engages with the outer thread (2). The other end of the inner pull rod (1) A plastic limiting plate (11) is provided, and a plastic nut (12) is fixedly provided on the right side of the plastic limiting plate (11), an inner thread is provided on the inner side of the plastic nut (12), and the inner thread is engaged with the outer thread (2), a steel wire mesh groove (6) is provided on the end of the outer column (5) away from the plastic positioning plate (3), a steel wire mesh (9) is provided in the steel wire mesh groove (6), and a rod cap (10) is fixedly provided on the outer side of the outer column (5) at the end of the inner pull rod (1).
2. The tie rod assembly for the built-in thermal insulation shear wall according to claim 1, characterized in that: The inner pull rod (1) is made of glass fiber material.
3. The tie rod assembly for the built-in thermal insulation shear wall according to claim 1, characterized in that: External threads (2) are evenly arranged on the inner pull rod (1).
4. The tie rod assembly for the built-in thermal insulation shear wall according to claim 3, characterized in that: The central axes of the plastic positioning plate (3), the inner cylinder (4) and the outer cylinder (5) are the same.
5. The tie rod assembly for the built-in thermal insulation shear wall according to any one of claims 1 to 4, characterized in that: The side wall of the wire mesh groove (6) is provided with a guide portion (7), and a limiting portion (8) is provided on the side wall of the wire mesh groove (6) outside the guide portion (7).
6. The tie rod assembly for the built-in thermal insulation shear wall according to claim 5, characterized in that: The rod cap (10) is replaced with a plastic limiting plate (11), and a plastic nut (12) is fixedly arranged on the outer side of the plastic limiting plate (11).