A fire hydrant box installation structure

By using a combination of keel and sealing layer in the fire hydrant box installation structure, the problems of insufficient fire protection and sound insulation and uneven walls in the construction of fully concealed fire hydrants are solved, and higher fire resistance and installation flatness are achieved.

CN222708891UActive Publication Date: 2025-04-04XIDI (SUZHOU) SURVEY & DESIGN CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421163096.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-04-04
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

In the prior art, when fully concealed fire hydrant is constructed, the steel wire mesh and plastering cannot meet the fire protection and sound insulation requirements, and the rear of the box is uneven, which is prone to problems such as wall plastering falling off and cracking.

Method used

The keel is used to fix the walls on both sides of the installation groove, fix the sealing layer and the keel, and then the fire hydrant box is concealed in the opening, and the net and plaster are hung on the outside of the sealing layer to increase the sealing layer to improve flatness and fire resistance.

Benefits of technology

The surface of the installation groove is smoother, reducing the problem of plastering falling off and cracking, and improving the fire protection performance of the fire hydrant box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222708891U_ABST
    Figure CN222708891U_ABST
Patent Text Reader

Abstract

The utility model provides a fire hydrant box installation structure, including a fire hydrant box and a wall, wherein the wall is provided with a through-type installation groove, the fire hydrant box is installed in the installation groove of a cavity, a keel is fixed in the installation groove, the keel is fixed with a sealing layer through a fixing bolt, the sealing layer is used to seal the opening of the installation groove, the keel is fixed to the walls on both sides of the installation groove, and the sealing layer is fixed to the keel. Then the fire hydrant box is concealed in the hole, a net is hung and plastered on the outside of the sealing layer, and after the sealing layer is added, the surface of the installation groove is smoother, which is more conducive to wall plastering and reducing the problem of plaster shedding and cracking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of fire hydrants, in particular to an installation structure of a fire hydrant box. Background Art

[0002] For the wall where the fire hydrant box is installed, the general installation is divided into two ways: open installation or concealed installation. In order to keep the wall flat or to facilitate the passage of people in a limited space and save surface space, the fire hydrant box is usually installed in a concealed way.

[0003] When constructing a fully concealed fire hydrant, the wall is often penetrated. After the fire hydrant box is installed, wire mesh and plaster are added to the back of the box to seal the hole.

[0004] The wire mesh plus plastering method cannot meet the fire prevention and sound insulation requirements, and the rear of the box is uneven, which easily causes problems such as wall plaster falling off and cracking. Utility Model Content

[0005] The utility model aims to provide a fire hydrant box installation structure to overcome the deficiencies in the prior art.

[0006] In order to solve the above technical problems, the technical solution of the utility model is: a fire hydrant box installation structure, comprising a fire hydrant box and a wall, wherein the wall is provided with a through-type installation groove, the fire hydrant box is installed in the installation groove of the cavity, a keel is fixed in the installation groove, the keel is fixed with a sealing layer through a fixing bolt, and the sealing layer is used to seal the opening of the installation groove.

[0007] In the above scheme, the keel is fixed to the two side walls in the installation groove, and the sealing layer is fixed to the keel. Then the fire hydrant box is concealed in the hole, and the mesh and plaster are hung on the outside of the sealing layer. After adding the sealing layer, the surface of the installation groove is smoother, which is more conducive to wall plastering and reduces the problem of plaster shedding and cracking.

[0008] As an improvement of the installation structure of a fire hydrant box of the utility model, the sealing layer is made of a fireproof board.

[0009] In the above scheme, the sealing layer solves the problem of wall plastering and reduces the problem of plaster falling off and cracking. At the same time, the sealing layer made of fireproof board has a fireproof function, which improves the fire protection of the fire hydrant box.

[0010] As an improvement of the installation structure of a fire hydrant box of the utility model, the sealing layer can be provided with a single layer or multiple layers.

[0011] In the above scheme, the number of layers of the sealing layer can be selected according to the distance between the keel and the wall surface to ensure that the surface of the sealing layer is flush with the wall surface, which is convenient for solving the wall plastering and reducing the problem of plastering falling off and cracking.

[0012] As an improvement of the installation structure of a fire hydrant box of the utility model, a filling layer is arranged between the keels.

[0013] In the above scheme, since the keel between the sealing layer and the fire hydrant box is a blank space, in order to avoid the sealing layer from sinking inward when the sealing layer is plastered on the wall later, a filling layer is added to fill the blank space of the keel to reduce the phenomenon of the sealing layer sinking inward.

[0014] As an improvement to the installation structure of a fire hydrant box of the utility model, the filling layer is made of fireproof and sound-insulating cotton.

[0015] In the above scheme, the sealing layer made of fireproof and soundproof cotton further improves the fireproof function of the entire installation structure, and also improves the sound insulation function of the entire installation structure.

[0016] As an improvement of the installation structure of a fire hydrant box of the utility model, the thickness of the filling layer is consistent with the thickness of the keel.

[0017] In the above solution, in order to maintain the flushness of the overall installation of the sealing layer, it is necessary to keep the thickness of the filling layer consistent with the thickness of the keel.

[0018] Compared with the prior art, the utility model has the following beneficial effects: the keel is fixed to the walls on both sides of the installation groove, and the sealing layer is fixed to the keel. The fire hydrant box is then concealed in the hole, and a mesh is hung and plastered on the outside of the sealing layer. After the sealing layer is added, the surface of the installation groove is smoother, which is more conducive to wall plastering and reduces the problem of plaster shedding and cracking. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 The present invention is a structural schematic diagram of an installation structure of a fire hydrant box.

[0021] Among them, 1. Fire hydrant box; 2. Wall; 3. Installation groove; 4. Purlin; 5. Fixing bolt; 6. Sealing layer; 7. Filling layer. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] like Figure 1 As shown, a fire hydrant box installation structure includes a fire hydrant box 1 and a wall 2, wherein the wall 2 is provided with a through-type installation groove 3, the fire hydrant box 1 is installed in the installation groove 3 of the cavity, a keel 4 is fixed in the installation groove 3, the keel 4 is fixed with a sealing layer 6 through a fixing bolt 5, and the sealing layer 6 is used to seal the opening of the installation groove 3.

[0024] The keel 4 is fixed to the walls 2 on both sides of the installation groove 3, and the sealing layer 6 is fixed to the keel 4. Then the fire hydrant box 1 is concealed in the hole, and the mesh and plaster are hung on the outside of the sealing layer 6. After adding the sealing layer 6, the surface of the installation groove 3 is smoother, which is more conducive to plastering the wall 2 and reducing the problem of plaster shedding and cracking.

[0025] The sealing layer 6 is made of a fireproof board.

[0026] The sealing layer 6 solves the problem of plastering the wall 2 and reduces the problem of plaster falling off and cracking. At the same time, the sealing layer 6 made of fireproof board has a fireproof function, which improves the fire protection of the fire hydrant box 1.

[0027] The sealing layer 6 can be provided as a single layer or multiple layers.

[0028] The number of layers of the sealing layer 6 can be selected according to the distance between the keel 4 and the surface of the wall 2 to ensure that the surface of the sealing layer 6 is flush with the surface of the wall 2, which is convenient for solving the problem of wall 2 plastering and reducing plastering shedding and cracking.

[0029] A filling layer 7 is arranged between the keels 4 .

[0030] Since the keel 4 between the sealing layer 6 and the fire hydrant box 1 is a blank space, in order to prevent the sealing layer 6 from sinking inward when the wall 2 is plastered on the sealing layer 6 later, a filling layer 7 is added to fill the blank space of the keel 4 to reduce the phenomenon of the sealing layer 6 sinking inward.

[0031] The filling layer 7 is made of fireproof and soundproof cotton.

[0032] At the same time, the sealing layer 6 made of fireproof and soundproof cotton further improves the fireproof function of the entire installation structure, and also improves the soundproof function of the entire installation structure.

[0033] The thickness of the filling layer 7 is consistent with the thickness of the keel 4 .

[0034] In order to maintain the flushness of the overall installation of the sealing layer 6 , it is necessary to keep the thickness of the filling layer 7 consistent with the thickness of the keel 4 .

[0035] For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the utility model. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it should be understood that although this specification is described in accordance with the implementation mode, not each implementation mode contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A fire hydrant box installation structure, comprising a fire hydrant box and a wall, wherein: The wall is provided with a through-type installation groove, and the fire hydrant box is installed in the installation groove of the cavity. It is characterized in that a keel is fixed in the installation groove, and the keel is fixed with a sealing layer through a fixing bolt, and the sealing layer is used to seal the opening of the installation groove.

2. The installation structure of a fire hydrant box according to claim 1, characterized in that: The sealing layer is made of fireproof board.

3. The installation structure of a fire hydrant box according to claim 1, characterized in that: The sealing layer may be provided in a single layer or multiple layers.

4. The installation structure of a fire hydrant box according to claim 1, characterized in that: A filling layer is arranged between the keels.

5. The installation structure of a fire hydrant box according to claim 4, characterized in that: The filling layer is made of fireproof and sound-insulating cotton.

6. The installation structure of a fire hydrant box according to claim 4, characterized in that: The thickness of the filling layer is consistent with the thickness of the keel.