Scaffold facilitating high-rise building triangular system curtain wall installation
By designing a scaffolding that facilitates the installation of curtain walls of high-rise buildings, including concrete floors, support structures, auxiliary installation structures, external channel structures and fixed angle codes, the problems of insufficient operating space, chaotic installation sequence and poor construction safety during curtain wall installation are solved, and the stability and orderly construction of the curtain wall and the guarantee of construction quality and safety are achieved.
Patent Information
- Application Number
- CN202420855119.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-04-24
AI Technical Summary
In the prior art, the installation of the curtain wall of the triangular system of high-rise buildings faces problems such as insufficient operating space, inconvenient glass installation equipment, poor operational safety and chaotic construction sequence, which makes it difficult to ensure construction quality and safety.
A scaffolding is designed to facilitate the installation of curtain walls of the triangular system of high-rise buildings, including concrete floors, support structures, auxiliary installation structures, external channel structures and fixed angle codes. By setting up external channel structures and reframes, the operating space needs of glass hoisting installation are met, the installation sequence is avoided, and the stable installation of the curtain wall is ensured through the support structure and auxiliary installation structure.
Through the design of this scaffolding, the problems of insufficient operating space, chaotic installation sequence and poor construction safety during the curtain wall installation process are solved, and the stable and orderly construction of the curtain wall is achieved, ensuring construction quality and safety.
Smart Images

Figure CN222716449U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering, in particular to a scaffolding which is convenient for installing a triangular system curtain wall of a high-rise building. Background Art
[0002] The triangular system curtain wall is a system of vertical triangular glass curtain wall system plus horizontal aluminum plate lines and glass railings. The triangular system curtain wall keel aluminum alloy keel is wide and high; the curtain wall glass is wide and high, but the construction of this type of selected aluminum alloy keel and curtain wall glass needs to overcome various difficulties such as operating space on the external ground-mounted scaffolding, glass installation equipment, operation safety, and interlacing of construction processes, which brings great difficulties to the specific construction.
[0003] In the prior art, the curtain wall glass installation layer is high, the glass height is high, the width is large, and the glass installation is relatively difficult. At the same time, the traditional scaffolding will cover the entire exterior of the building when it is erected. At this time, installation on the traditional scaffolding will be difficult to identify the lifting position, resulting in a chaotic installation sequence, and the quality and safety of the curtain wall construction cannot be guaranteed. Utility Model Content
[0004] In view of the deficiencies in the prior art, the technical solution adopted by the utility model to solve the technical problems is: a scaffolding that is convenient for installing the triangular system curtain wall of a high-rise building, comprising: a concrete floor; a supporting structure, wherein both ends of the supporting structure are fixedly connected to the concrete floor; an auxiliary mounting structure, wherein the outer wall of the auxiliary mounting structure is connected to the outer wall of the supporting structure; an external channel structure, wherein the outer wall of the external channel structure is fixedly connected to the side wall of the concrete floor; a fixed angle code, wherein the outer wall of the fixed angle code is fixedly connected to the side wall of the concrete floor, the external channel structure comprises an embedded part, wherein the outer wall of the embedded part is fixedly connected to a wall connecting rod, wherein the outer wall of the wall connecting rod is slidably provided with a cross bar, an external channel structure is provided, and the curtain wall is installed outside the floor by adding the structure to meet the hoisting and installation operation space of the glass, a preventive structure is conveniently installed on the cross bar, and at the same time, by changing the frame to make a section of curtain wall and changing one layer to make one layer, the construction is orderly and the installation sequence is avoided to be chaotic.
[0005] Preferably, the supporting structure includes a first column, both ends of which are fixedly connected to a first embedded plate, the outer wall of the first embedded plate is fixedly connected to the outer wall of the concrete floor, the outer wall of the concrete floor is fixedly connected to a second embedded plate, the outer wall of the second embedded plate is fixedly connected to a second column, and the supporting structure helps to fix the auxiliary installation structure.
[0006] Preferably, the auxiliary mounting structure includes a first connecting plate, a second connecting plate is arranged on the outside of the first connecting plate, a curtain wall support plate is arranged below the second connecting plate, the bottom of the curtain wall support plate is fixedly connected to a support beam, the bottom of the support beam is fixedly connected to a support column, the bottom of the support column is fixedly connected to a support frame, the outer wall of the support column is fixedly connected to a square keel through a connecting angle code, the inner wall of the square keel is fixedly connected to a connecting square, and the auxiliary mounting structure is used to provide an auxiliary limiting effect on the installation of the triangular curtain wall.
[0007] Preferably, the outer wall of the first connecting plate is fixedly connected to the outer wall of the first column, the second connecting plate is fixedly connected to the outer wall of the second column, the outer walls of the first connecting plate and the second connecting plate are both fixedly connected to the outer wall of the connecting square tube, the outer wall of the support frame and the outer wall of the support beam are both fixedly connected to the side walls of the concrete floor, and the outer wall of the curtain wall support plate is fixedly connected to the top of the outer wall of the concrete floor. The auxiliary installation structure not only simplifies the processing of the triangular curtain wall, but also makes the triangular curtain wall more stable after installation.
[0008] The beneficial effects of the utility model are as follows:
[0009] 1. The utility model sets an external channel structure and adds a structure to the outside of the floor to install the curtain wall, so as to meet the space for hoisting and installing the glass. The preventive structure is conveniently installed on the cross bar. At the same time, the construction is orderly and the installation sequence is avoided by changing the frame section to make a curtain wall section and changing the layer to make a layer.
[0010] 2. The utility model sets a supporting structure and an auxiliary mounting structure. The auxiliary mounting structure limits the shape of the triangular curtain wall, and the supporting structure helps to fix the auxiliary mounting structure, which not only simplifies the processing of the triangular curtain wall, but also makes the triangular curtain wall more stable after installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is the front view of the utility model;
[0012] Figure 2 It is a side view of the utility model;
[0013] Figure 3 It is a schematic diagram of the local structure on the concrete floor of the utility model;
[0014] Figure 4 It is an enlarged schematic diagram of the structure of point A of the utility model.
[0015] In the figure: 1. Concrete floor; 2. Support structure; 3. Auxiliary installation structure; 4. External channel structure; 5. Fixed angle code; 21. First column; 22. Second column; 23. First embedded plate; 24. Second embedded plate; 31. First connecting plate; 32. Second connecting plate; 33. Connecting square tube; 34. Square tube keel; 35. Curtain wall support plate; 36. Support beam; 37. Support column; 38. Support frame; 41. Embedded parts; 42. Wall connecting rod; 43. Cross bar. DETAILED DESCRIPTION
[0016] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations are obvious to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and design various embodiments with various modifications suitable for specific purposes.
[0017] Example: See Figure 1 - Figure 4 The utility model provides a technical solution: a scaffolding for installing a triangular system curtain wall of a high-rise building, comprising: a concrete floor 1; a supporting structure 2, wherein both ends of the supporting structure 2 are fixedly connected to the concrete floor 1; an auxiliary mounting structure 3, wherein the outer wall of the auxiliary mounting structure 3 is connected to the outer wall of the supporting structure 2; an external channel structure 4, wherein the outer wall of the external channel structure 4 is fixedly connected to the side wall of the concrete floor 1; a fixed angle code 5, wherein the outer wall of the fixed angle code 5 is fixedly connected to the side wall of the concrete floor 1, the external channel structure 4 comprises an embedded part 41, wherein the outer wall of the embedded part 41 is fixedly connected to a wall connecting rod 42, wherein the outer wall of the wall connecting rod 42 is slidably provided with a cross bar 43, before use, a scaffolding in a traditional construction technology is erected outside the building, wherein a vertical pole is first assumed, and a small horizontal connecting rod is added to the position of the vertical pole to connect with the outer vertical pole fastener, and the inner vertical pole is pulled together with the outer vertical pole There is no vertical pole at the knot position, and external vertical poles need to be added for tensioning. This process is the initial reinforcement of the scaffolding. After the frame is reinforced, the vertical poles that affect the position of the triangular curtain wall are removed, and the large horizontal connecting rods connected to the vertical poles are separated to avoid affecting the construction and installation of the triangular curtain wall. Then, wall connecting parts are added to the original vertical pole positions, and the wall connecting parts are set according to two spans and three steps. The wall connecting parts are the embedded parts 41 and the wall connecting rods 42 in the external channel structure 4. A cross bar 43 is set outside the protruding position of the curtain wall of the curtain wall installation layer, and the cross bar 43 is placed on the wall connecting rod 42. Then the two are fixed by scaffolding buckles, and guardrails and diagonal rods are added to the cross bar 43 to tension the original scaffolding to complete the connection with the external scaffolding, and the curtain wall is installed. After the construction of this layer of curtain wall is completed, follow the above steps to remove one layer at a time from top to bottom, and so on.
[0018] The supporting structure 2 includes a first column 21, both ends of which are fixedly connected to a first embedded plate 23, the outer wall of the first embedded plate 23 is fixedly connected to the outer wall of the concrete floor 1, the outer wall of the concrete floor 1 is fixedly connected to a second embedded plate 24, the outer wall of the second embedded plate 24 is fixedly connected to a second column 22, the first column 21 and the second column 22 are erected between the concrete floors 1, the first column 21 and the second column 22 are connected to the concrete floor 1 through the first embedded plate 23 and the second embedded plate 24 respectively, thereby ensuring the stability of the erection of the first column 21 and the second column 22.
[0019] The auxiliary installation structure 3 includes a first connecting plate 31, a second connecting plate 32 is arranged outside the first connecting plate 31, a curtain wall support plate 35 is arranged below the second connecting plate 32, a supporting beam 36 is fixedly connected to the bottom of the curtain wall support plate 35, a supporting column 37 is fixedly connected to the bottom of the supporting beam 36, a supporting frame 38 is fixedly connected to the bottom of the supporting column 37, the outer wall of the supporting column 37 is fixedly connected to the square keel 34 through a connecting angle code, and the inner wall of the square keel 34 is fixedly connected to the connecting square tube 33, the first connecting plate 31 and the second connecting plate 32 are respectively fixed on the first column 21 and the second column 22, and are connected to the connecting square tube 33, so that the first connecting plate 31 and the second connecting plate 32 form a triangle, which provides positioning for the subsequent triangular curtain wall installation.
[0020] The outer wall of the first connecting plate 31 is fixedly connected to the outer wall of the first column 21, the second connecting plate 32 is fixedly connected to the outer wall of the second column 22, the outer walls of the first connecting plate 31 and the second connecting plate 32 are both fixedly connected to the outer wall of the connecting square tube 33, the outer wall of the support frame 38 and the outer wall of the support beam 36 are both fixedly connected to the side wall of the concrete floor 1, the outer wall of the curtain wall support plate 35 is fixedly connected to the top of the outer wall of the concrete floor 1, and the side wall of the concrete floor 1 is pre-embedded with a support beam 36 and a support frame 38, and the support beam 36 and the support frame 38 are connected by a support column 37 to form a bracket, at this time, a curtain wall support plate 35 is placed on the bracket, the curtain wall support plate 35 is not only connected to the concrete floor 1 to obtain a certain supporting effect, but also the bracket provides support for the curtain wall support plate 35, so that the curtain wall support plate 35 has the ability to hold up the curtain wall.
[0021] Working principle:
[0022] Before use, a scaffold is set up outside the curtain wall. Vertical poles are first added on both sides of the triangular curtain wall. The vertical poles are added so that they are all on the ground from top to bottom. Small horizontal connecting rods are added at the vertical pole positions to connect with the fasteners of the external vertical poles. If there are no vertical poles at the positions where the inner vertical poles are tied to the external vertical poles, external vertical poles need to be added for tying. This process is the initial reinforcement of the scaffold. After the reinforcement of the frame is completed, the vertical poles that affect the position of the triangular curtain wall are removed, and the large horizontal connecting rods connected to the vertical poles are separated to avoid affecting the construction and installation of the triangular curtain wall. After that, wall ties are added to the original vertical pole positions. The wall ties are set according to two spans and three steps. The wall ties are the embedded parts 41 and the wall connecting rods 42 in the external channel structure 4. A horizontal rod 43 is set outside the protruding position of the curtain wall of the curtain wall installation layer. The rod 43 is placed on the wall connecting rod 42, and then the two are fixed by the scaffolding buckle, and a protective railing and a diagonal rod are added to the cross bar 43 to tie it with the original scaffolding to complete the connection with the external scaffolding, and the curtain wall is installed. An operating platform is placed on the cross bar 43 and the external scaffolding uprights to facilitate the workers to install the curtain wall outside the floor. When installing the curtain wall, a horizontal safety net is installed between the two fixed angle codes 5 to make the construction process safer. After the construction of the curtain wall of this layer is completed, according to the above steps, one layer is removed from top to bottom, and so on. Through the external channel structure 4 and the external scaffolding erected in traditional construction operations, it is convenient to set up fences and passages on the outside of the concrete floor 1, making it easier for workers to adjust the construction position during installation.
[0023] An auxiliary installation structure 3 and a supporting structure 2 are provided to assist in the installation of the curtain wall. A first column 21 and a second column 22 are set up between the concrete floors 1. The first column 21 and the second column 22 are connected to the concrete floor 1 through a first buried plate 23 and a second buried plate 24, respectively, to ensure the stability of the installation of the first column 21 and the second column 22. At the same time, a first connecting plate 31 and a second connecting plate 32 are fixed to the first column 21 and the second column 22, respectively, and connected to the connecting square tube 33, so that the first connecting plate 31 and the second connecting plate 32 form a triangle, providing positioning for the subsequent triangular curtain wall installation. A supporting beam 36 and a supporting frame 38 are pre-buried at the side wall of the concrete floor 1. A supporting column 3 is provided between the supporting beam 36 and the supporting frame 38. 7 is connected to form a bracket, and the support column 37 is not only connected to the support beam 36 and the support frame 38 at the upper and lower ends respectively, but also contacts with the square keel 34 through the connecting angle code on its side wall and is fixed by the cooperation of bolts and the connecting angle code. At this time, a curtain wall support plate 35 is placed on the bracket. The curtain wall support plate 35 is not only connected to the concrete floor 1 to obtain a certain supporting effect, but also has a bracket to provide support for the curtain wall support plate 35, so that the curtain wall support plate 35 has the ability to hold up the curtain wall. At this time, the installation of the supporting structure 2 and the auxiliary installation structure 3 is completed, and the first connecting plate 31 and the second connecting plate 32 are used to provide positioning for the curtain wall during installation, and the curtain wall support plate 35 is used to provide support for the curtain wall during installation, so that it is easier for the staff to install the curtain wall.
[0024] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. Structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to conventional means in the field unless otherwise specified and limited.
Claims
1. A scaffolding for installing a triangular system curtain wall of a high-rise building, characterized in that: include: Concrete floor (1); A supporting structure (2), wherein both ends of the supporting structure (2) are fixedly connected to the concrete floor (1); An auxiliary mounting structure (3), wherein an outer wall of the auxiliary mounting structure (3) is connected to an outer wall of the supporting structure (2); An external channel structure (4), wherein an outer wall of the external channel structure (4) is fixedly connected to a side wall of the concrete floor (1); A fixed angle bracket (5), wherein the outer wall of the fixed angle bracket (5) is fixedly connected to the side wall of the concrete floor (1); The auxiliary mounting structure (3) comprises a first connecting plate (31), a second connecting plate (32) is arranged outside the first connecting plate (31), a curtain wall support plate (35) is arranged below the second connecting plate (32), a support beam (36) is fixedly connected to the bottom of the curtain wall support plate (35), a support column (37) is fixedly connected to the bottom of the support beam (36), a support frame (38) is fixedly connected to the bottom of the support column (37), an outer wall of the support column (37) is fixedly connected to a square keel (34) via a connecting angle code, and an inner wall of the square keel (34) is fixedly connected to a connecting square tube (33).
2. A scaffolding for facilitating the installation of a triangular system curtain wall of a high-rise building according to claim 1, characterized in that: The support structure (2) comprises a first column (21), both ends of the first column (21) being fixedly connected to a first embedded plate (23), an outer wall of the first embedded plate (23) being fixedly connected to an outer wall of a concrete floor (1), a second embedded plate (24) being fixedly connected to the outer wall of the concrete floor (1), and a second column (22) being fixedly connected to the outer wall of the second embedded plate (24).
3. A scaffolding for installing a triangular system curtain wall of a high-rise building according to claim 1, characterized in that: The outer wall of the first connecting plate (31) is fixedly connected to the outer wall of the first column (21), the second connecting plate (32) is fixedly connected to the outer wall of the second column (22), and the outer walls of the first connecting plate (31) and the second connecting plate (32) are both fixedly connected to the outer wall of the connecting square tube (33).
4. A scaffolding for facilitating installation of a triangular system curtain wall of a high-rise building according to claim 1, characterized in that: The outer wall of the support frame (38) and the outer wall of the support beam (36) are both fixedly connected to the side wall of the concrete floor (1), and the outer wall of the curtain wall support plate (35) is fixedly connected to the top of the outer wall of the concrete floor (1).
5. The scaffolding for installing a triangular system curtain wall of a high-rise building according to claim 1 is characterized in that: The external channel structure (4) comprises an embedded part (41), the outer wall of the embedded part (41) is fixedly connected to a wall connecting rod (42), and the outer wall of the wall connecting rod (42) is slidably provided with a cross bar (43).