A sewage treatment device with constant water level
By designing a sewage treatment device with constant water level, including a drainage mechanism and a defloating sludge mechanism set below the liquid level, the problem of floating sludge affecting the quality of effluent water and difficulty in operation and maintenance in sewage treatment is solved, and efficient floating sludge collection and cleaning is achieved, reducing operation and maintenance costs.
Patent Information
- Application Number
- CN202421356515.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-13
AI Technical Summary
When the existing sewage treatment device is drained, some anaerobic sludge will float on the water surface and flow into the next link through the water flow, affecting the quality of the effluent water. When anaerobic floating sludge accumulates a lot, it will be solidified, making it difficult to clean, and the operation and maintenance cleaning work is large.
A sewage treatment device with constant water level is designed, including a reaction box, a drainage mechanism and a defloating mud mechanism. The drainage mechanism is located below the liquid level of the sewage, and the clean water is discharged through the water collection pipe and the outlet pipe; the defloating sludge removal mechanism is located directly above the drainage mechanism, including a submersible sewage pump and a floating sludge collection head, which can collect and discharge floating sludge, and achieve height adjustment through the coordination of the screw and the bracket.
It is achieved to avoid floating mud discharge to the back-end equipment with the water flow, reduce the impact of floating mud on water quality, reduce the operation and maintenance cleaning workload, improve the quality of the effluent water quality, and can flexibly adapt to changes in liquid level height.
Smart Images

Figure CN222729599U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of sewage treatment, and in particular to a sewage treatment device with a constant water level. Background Art
[0002] At present, sewage tanks generally use a triangular weir structure when draining. For example, the supernatant in the reaction tank flows into the sedimentation tank through the triangular weir, and the supernatant in the sedimentation tank flows into the clear water tank through the triangular weir. When the equipment is running, some anaerobic sludge will float on the water surface and flow into the next link through the water flow, affecting the effluent quality. Sometimes when the anaerobic floating sludge accumulates too much, it will become compacted and difficult to clean, and the workload of operation and maintenance cleaning is large. Utility Model Content
[0003] The embodiment of the present application provides a sewage treatment device with a constant water level, which can prevent floating mud from flowing with clean water to the back-end process and can flexibly adapt to changes in the liquid level.
[0004] The embodiment of the present application provides a constant water level sewage treatment device, comprising a reaction box, a drainage mechanism and a floating mud removal mechanism; the reaction box is provided with a sewage inlet; the drainage mechanism is arranged in the reaction box, and the drainage mechanism is located below the liquid surface of the sewage; the drainage mechanism comprises a water collecting pipe and a water outlet pipe, a plurality of water collecting holes are arranged on the outer circumference of the water collecting pipe, one end of the water outlet pipe is connected to the water collecting pipe, and the other end is used to discharge clean water;
[0005] The floating mud removal mechanism is located directly above the drainage mechanism; the floating mud removal mechanism includes a first bracket, a screw, a first nut, a second bracket, a submersible sewage pump, a floating mud collection head and a mud discharge pipe; the first bracket is installed on the reaction box, and the first bracket is provided with a first sliding hole; the screw passes through the first sliding hole; two first nuts are both threadedly connected to the screw, and are respectively located on both sides of the first sliding hole; the second bracket is connected to the screw, and the height position of the second bracket is adjusted by axial sliding of the screw; the submersible sewage pump is arranged on the second bracket, the floating mud collection head is connected to the input end of the submersible sewage pump, and the floating mud collection head is used to collect floating mud; one end of the mud discharge pipe is connected to the output end of the submersible sewage pump, and the other end is used to discharge sludge.
[0006] The constant water level sewage treatment device of the present application has at least the following beneficial effects:
[0007] The sewage treatment device of the present application includes a reaction box, a drainage mechanism and a floating sludge removal mechanism; the drainage mechanism of the present application is arranged below the liquid surface of the sewage, so as to avoid the floating sludge from being discharged to the rear-end equipment with the water flow, and reduce the influence of the floating sludge on the water quality; the floating sludge removal mechanism is arranged just above the drainage mechanism, so as to realize the gathering of floating sludge with the water flow, and then the submersible sewage pump is turned on, and the floating sludge is immediately sucked into the sludge collecting head and discharged externally in a centralized manner; and the sludge collecting head can realize height adjustment through the cooperation of the first bracket, the second bracket and the screw, so as to adapt to the changes in liquid level height caused by the uneven foundation of the equipment and the changes in liquid level during the sewage treatment process, and has good flexibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0009] Figure 1 It is a structural schematic diagram of a sewage treatment device according to an embodiment of the present application;
[0010] Figure 2 It is a plan view of a sewage treatment device according to an embodiment of the present application;
[0011] Figure 3 yes Figure 1 Structural diagram of the middle drainage mechanism;
[0012] Figure 4 yes Figure 1 Structural schematic diagram of the floating mud removal mechanism;
[0013] Description of the reference numerals is as follows:
[0014] 10. Reaction box;
[0015] 20. Drainage mechanism; 21. Water collecting pipe; 21a. Water collecting hole; 22. Water outlet pipe; 23. Hoisting assembly; 231. Fixing frame; 232. Hanging bracket;
[0016] 30. Floating mud removal mechanism; 31. First bracket; 32. Screw rod; 33. First nut; 34. Second bracket; 35. Submersible sewage pump; 36. Floating mud collection head; 37. Mud discharge pipe; 38. Second nut; 40. Clean water tank; 41. Overflow weir;
[0017] 50. Sludge pool. DETAILED DESCRIPTION
[0018] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only intended to explain the present application, rather than to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.
[0019] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0020] This embodiment discloses a sewage treatment device with a constant water level, including a reaction box 10, a drainage mechanism 20, and a floating mud removal mechanism 30. Figure 1 and Figure 2 As shown, the details are as follows:
[0021] A sewage inlet is provided on the side wall of the reaction box 10 , and the sewage inlet is connected to a water inlet pump, and the sewage is pumped into the reaction box 10 through the water inlet pump.
[0022] like Figure 3 As shown, the drainage mechanism 20 is arranged in the reaction box 10, and the drainage mechanism 20 is located below the liquid surface of the sewage; the drainage mechanism 20 includes a water collecting pipe 21 and a water outlet pipe 22; the water collecting pipe 21 is located below the liquid surface of the sewage, and the water collecting pipe 21 is horizontally arranged, the axial ends of the water collecting pipe 21 are closed, and a plurality of water collecting holes 21a are distributed on the outer periphery of the water collecting pipe 21, and the clean water in the middle of the reaction box 10 enters the interior of the water collecting pipe 21 through the water collecting holes 21a, wherein the horizontally arranged water collecting holes 21a can make the water in the reaction box 10 flow evenly into the interior of the water collecting pipe 21 without generating vortex.
[0023] like Figure 3As shown, one end of the water outlet pipe 22 is connected to the middle position of the water collecting pipe 21, and the other end of the water outlet pipe 22 is used to discharge clean water. In this embodiment, a clean water tank 40 is provided on one side of the reaction box 10, and the other end of the water outlet pipe 22 is connected to the clean water tank 40, so that the water outlet pipe 22 can discharge the clean water in the reaction box 10 into the clean water tank 40, wherein an overflow weir 41 is provided at the upper position of the clean water tank 40, and the clean water overflowing to the overflow weir 41 can be discharged outward.
[0024] like Figure 3 As shown, in some preferred embodiments, the drainage mechanism 20 also includes a hanging assembly 23, which includes a fixing frame 231 and a hanger 232 (there are two hangers), the fixing frame 231 is fixedly mounted on the inner peripheral wall of the reaction box 10, and the fixing frame 231 is provided with a plurality of first connection holes at intervals along the height direction; one end of the hanger 232 is fixed to the water collecting pipe 21 by a clamp or a U-bolt, etc., wherein the hanger 232 is provided with a plurality of second connection holes for cooperating with the first connection holes along the height direction, and bolts, rivets and other connecting parts can be used to pass through the first connection holes and the second connection holes to achieve the fixation between the hanger 232 and the fixing frame 231. When the position of the water collecting pipe 21 needs to be adjusted, it is only necessary to select the connection position of the first connection hole and the second connection hole according to actual needs.
[0025] like Figure 4 As shown, the de-sludge mechanism 30 is disposed in the reaction box 10, and the de-sludge mechanism 30 is located directly above the drainage mechanism 20. The de-sludge mechanism 30 includes a first bracket 31, a screw 32, a first nut 33, a second bracket 34, a submersible sewage pump 35, a de-sludge collecting head 36, a de-sludge pipe 37 and a second nut 38.
[0026] like Figure 4 As shown, the first bracket 31 is fixed on the inner wall of the reaction box 10, and the first bracket 31 is located directly above the water collecting pipe 21; the first bracket 31 is provided with a first sliding hole, and the screw 32 is provided with the first sliding hole along the height direction, and the screw 32 can slide up and down in the first sliding hole; two first nuts 33 are both threadedly connected to the screw 32, and the two first nuts 33 are respectively located on the upper and lower sides of the first sliding hole, and the first nuts 33 and the first bracket 31 are in contact, so as to achieve the stability of the position between the screw 32 and the first bracket 31. When the position of the second bracket 34 needs to be adjusted, it is only necessary to screw the first nut 33 and pull the screw 32 up and down. In order to ensure stability, there are two screws 32 in this embodiment.
[0027] like Figure 4As shown, the second bracket 34 is connected to the screw rod 32, and the second bracket 34 is used to install the submersible sewage pump 35, wherein the de-floating mud mechanism 30 also includes two second nuts 38 threadedly connected to the screw rod 32, and a stable connection between the second bracket 34 and the screw rod 32 is achieved through the second nuts 38, specifically as follows: a second sliding hole is provided on the second bracket 34, and the lower end of the screw rod 32 is penetrated by the second sliding hole along the height direction, and the two second nuts 38 are respectively located on the upper and lower sides of the second sliding hole, and the second nuts 38 can be abutted against the second bracket 34, so that the second bracket 34 can be stably hung on the screw rod 32.
[0028] like Figure 4 As shown, the submersible sewage pump 35 is arranged on the upper surface of the second bracket 34, and the submersible sewage pump 35 is used to discharge the sludge in the reaction box 10 to the outside.
[0029] like Figure 4 As shown, the floating mud collecting head 36 is vertically arranged and is located directly above the water collecting pipe 21, and the upper plane of the floating mud collecting head is lower than the liquid surface of the sewage, and the collecting port of the floating mud collecting head 36 is lower than the liquid surface of the reaction tank, for example, the floating mud collecting head 36 is 1 cm to 5 cm below the liquid surface, and the lower end of the floating mud collecting head 36 is connected to the input end of the submersible sewage pump 35, and the floating mud collecting head 36 is used to collect the floating mud on the liquid surface. Among them, the submersible sewage pump 35 of this embodiment can be linked with the water inlet pump, and when the water inlet pump is turned on or turned on for a certain period of time, the submersible sewage pump 35 will run again to achieve the purpose of concentrated discharge of floating mud.
[0030] like Figure 2 As shown, one end of the sludge discharge pipe 37 is connected to the output end of the submersible sewage pump 35, and the other end of the sludge discharge pipe 37 is used to discharge sludge. In this embodiment, a sludge tank 50 is provided on one side of the reaction box 10, and the other end of the sludge discharge pipe 37 is connected to the sludge tank 50. The sludge tank 50 can temporarily store the discharged sludge for later centralized treatment.
[0031] In some preferred embodiments, a liquid level detection unit (not shown) is provided in the reaction box 10, and the liquid level height of the sewage is monitored in real time by the liquid level detection unit. In the reaction box 10, if the drainage mechanism 20 fails (for example, the water collection hole 21a of the water collection pipe 21 is blocked), the liquid level height in the reaction box 10 may exceed a predetermined value. In this embodiment, the liquid level detection unit is designed to monitor the liquid level height of the sewage in real time, which can reflect the working state of the drainage mechanism 20, such as the drainage efficiency of the drainage mechanism 20.
[0032] The working principle of the sewage treatment device in this embodiment is as follows:
[0033] When water enters the reaction box 10, the water flow will be squeezed into the water collecting pipe 21, that is, the sewage flows into the water collecting pipe 21 through the water collecting hole 21a, and then flows to the clean water tank 40 through the outlet pipe 22, while the floating mud floating on the water surface will not be brought into the water collecting pipe 21 with the water flow, nor will it flow into the clean water tank 40.
[0034] During the water flow, the floating mud on the water surface will drift with the water flow to the top of the water collecting pipe 21 and gather. At this time, the submersible sewage pump 35 is turned on, and the floating mud on the water surface will be sucked into the floating mud collecting head 36. The sucked floating mud flows into the sludge pool 50 through the submersible sewage pump 35 and the mud discharge pipe 37. After the submersible sewage pump 35 works for a certain period of time, the floating mud on the water surface is cleaned up.
[0035] The sewage treatment device of this embodiment has the following advantages:
[0036] 1. This embodiment achieves drainage at a constant liquid level and prevents floating mud from being discharged with the water flow, thereby improving the effluent water quality;
[0037] Second, this embodiment realizes the function of collecting and cleaning the floating mud in the reaction tank, reduces the workload of the operation and maintenance personnel, and reduces the operation and maintenance costs;
[0038] 3. This embodiment realizes the height adjustment function of the de-sludge mechanism 30, which can adapt to the change of the liquid level height caused by the unevenness of the equipment foundation.
[0039] The above is only a specific implementation of the present application. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. It should be understood that the protection scope of the present application is not limited to this. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in this application, and these modifications or replacements should be included in the protection scope of this application.
Claims
1. A sewage treatment device with a constant water level, characterized in that: It comprises a reaction box (10), a drainage mechanism (20) and a floating mud removal mechanism (30); The reaction box (10) is provided with a sewage inlet; The drainage mechanism (20) is arranged in the reaction box (10), and the drainage mechanism (20) is located below the liquid surface of the sewage; the drainage mechanism (20) comprises a water collecting pipe (21) and a water outlet pipe (22); a plurality of water collecting holes (21a) are arranged on the outer periphery of the water collecting pipe (21); one end of the water outlet pipe (22) is connected to the water collecting pipe (21), and the other end is used to discharge clean water; The desludging mechanism (30) is located directly above the drainage mechanism (20); the desludging mechanism (30) comprises a first bracket (31), a screw rod (32), a first nut (33), a second bracket (34), a submersible sewage pump (35), a desludging head (36) and a desludging pipe (37); the first bracket (31) is mounted on the reaction box (10), and the first bracket (31) is provided with a first sliding hole; the screw rod (32) passes through the first sliding hole; the two first nuts (33) are both threadedly connected to the first sliding hole; the .... The second bracket (34) is connected to the screw rod (32) and is respectively located on both sides of the first sliding hole; the second bracket (34) is connected to the screw rod (32), and the height position of the second bracket (34) is adjusted by axial sliding of the screw rod (32); the submersible sewage pump (35) is arranged on the second bracket (34), and the floating mud collecting head (36) is connected to the input end of the submersible sewage pump (35), and the floating mud collecting head (36) is used to collect floating mud; one end of the mud discharge pipe (37) is connected to the output end of the submersible sewage pump (35), and the other end is used to discharge mud.
2. The constant water level sewage treatment device according to claim 1, characterized in that: The drainage mechanism (20) further comprises a hanging assembly (23) for installing the water collecting pipe (21); the hanging assembly (23) comprises a fixing frame (231) and a hanging frame (232); the fixing frame (231) It is installed on the reaction box (10), and the fixing frame (231) is provided with a plurality of first connection holes along the height direction; one end of the hanger (232) is connected to the water collecting pipe (21), and the hanger (232) is provided with a plurality of second connection holes along the height direction for cooperating with the first connection holes.
3. The constant water level sewage treatment device according to claim 1 or 2, characterized in that: The floating mud collecting head (36) is located directly above the water collecting pipe (21), and the upper plane of the floating mud collecting head (36) is lower than the liquid surface of the sewage.
4. The constant water level sewage treatment device according to claim 1, characterized in that: The de-floating mud mechanism (30) further comprises two second nuts (38) threadedly connected to the screw rod (32); a second sliding hole is provided on the second bracket (34); the screw rod (32) passes through the second sliding hole; and the two second nuts (38) are respectively located on both sides of the second sliding hole.
5. The constant water level sewage treatment device according to claim 1, characterized in that: A clean water tank (40) is provided on one side of the reaction box (10), and an overflow weir (41) is provided in the clean water tank (40); the other end of the water outlet pipe (22) is connected to the clean water tank (40).
6. The constant water level sewage treatment device according to claim 1, characterized in that: A sludge pool (50) is provided on one side of the reaction box (10), and the other end of the sludge discharge pipe (37) is connected to the sludge pool (50).
7. The constant water level sewage treatment device according to claim 1, characterized in that: A liquid level detection unit is arranged in the reaction box (10).