A mobile pavement for gantry cranes on construction sites

By setting up reinforcement grooves and cable troughs in the mobile pavement section of the gantry crane, and pouring concrete into the reinforcement grooves into the integration of the steel structure, the problems of easy cable damage and inconvenient maintenance of the road surface are solved, and a more reliable pavement structure and a convenient maintenance process are achieved.

CN222730267UActive Publication Date: 2025-04-08SEPCOIII ELECTRIC POWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421006134.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2025-04-08
Estimated Expiration
2034-05-10

AI Technical Summary

Technical Problem

In the prior art, the cables passing through the gantry crane are easily crushed, and the road surface is inconvenient to repair after sinking.

Method used

A mobile pavement is designed, including reinforcement grooves and cable troughs. By pouring concrete into the reinforcement grooves and integrating the steel structure, the reliability of the pavement is enhanced, and the maintenance is facilitated by reserved hanging lugs that are reserved in advance on the road.

Benefits of technology

It effectively protects the cables in the cable duct, avoids cable damage, and simplifies the maintenance process after the road surface sinks, improving the operation convenience and safety of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222730267U_ABST
    Figure CN222730267U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of mobile pavement, and relates to a mobile pavement for gantry crane crossing sections used in construction sites. It includes: a bottom steel plate, a first side steel plate, a second side steel plate, a first partition, a second partition and a third partition; the bottom steel plate is in the shape of a rectangle, and the first side steel plate and the second side steel plate are respectively arranged on two opposite sides of the bottom steel plate; the first partition, the second partition and the third partition are arranged parallel to each other between the first side steel plate and the second side steel plate; a plurality of groups of reinforcing steel bars are arranged between the first side steel plate and the first partition to form a first reinforcement groove; a plurality of groups of reinforcing steel bars are arranged between the second partition and the third partition to form a second reinforcement groove; concrete is poured in the first reinforcement groove and the second reinforcement groove. The utility model adopts a steel structure reinforcement groove, and concrete is poured in the reinforcement groove, which is more solid and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of mobile pavement, and in particular relates to a mobile pavement for a gantry crane crossing a road section used at a construction site. Background Art

[0002] In order to save space, two gantry cranes are required for one combined yard track line, and a cement road is arranged longitudinally in the center of the yard to realize unloading and loading. For the gantry crane crossing section, in order to prevent the cables from being crushed when the truck passes by, it is necessary to arrange cable troughs in the crossing section to protect the cables.

[0003] Due to the different models of gantry cranes, the distance between the center of the track and the center line of the cable drum varies to a certain extent. It is necessary to arrange two cable troughs within a distance of 800mm and the road surface should be strong and durable to ensure that trucks are not affected when passing through. There are two problems in the cement crossing section where the track sinks and the gantry crane cable is pressed:

[0004] (1) In order to prevent the cables from being crushed, the existing technology places the cables in channel steels and lays concrete on the edges of the channel steels. However, long-term rolling will crush the concrete on the edges of the channel steels. Without the protection of concrete, the channel steels will affect the normal traffic on the road section.

[0005] (2) When a gantry crane passes through a road section, the track may sink due to the rolling of heavy trucks passing by, and the sunken road surface needs to be repaired. However, in the existing technology, the road surface is cast as a whole, which is not convenient for repairing the sunken track. Summary of the invention

[0006] In view of the above technical problems, the present invention provides a mobile pavement for gantry crane-crossed road sections used in construction sites; the mobile pavement is provided with a reinforcement groove, and concrete is poured in the reinforcement groove, so that the concrete and steel structure are integrated to be more solid and reliable.

[0007] The utility model is realized by the following technical solutions:

[0008] A gantry crane-crossing section movable pavement applied to a construction site, comprising: a bottom steel plate, a first side steel plate, a second side steel plate, a first partition, a second partition and a third partition;

[0009] The bottom steel plate is in a rectangular shape, and the first side steel plate and the second side steel plate are respectively arranged on two opposite sides of the bottom steel plate; the first partition plate, the second partition plate and the third partition plate are arranged parallel to each other and are arranged in sequence between the first side steel plate and the second side steel plate;

[0010] Several groups of reinforcing steel bars are arranged between the first side steel plate and the first partition plate to form a first reinforcement groove; several groups of reinforcing steel bars are arranged between the second partition plate and the third partition plate to form a second reinforcement groove;

[0011] pouring concrete in the first reinforcement groove and the second reinforcement groove;

[0012] The bottom steel plate, the first partition plate and the second partition plate define a first cable trough; the bottom steel plate, the third partition plate and the second side steel plate define a second cable trough.

[0013] Furthermore, two lifting ear openings are provided on the first partition plate, and two lifting ear openings are provided on the third partition plate; the diameter of each lifting ear is in the range of 30-40 mm.

[0014] Furthermore, the bottom steel plate, the first side steel plate, the second side steel plate, the first partition plate, the second partition plate and the third partition plate are all made of Q235 steel with a thickness of 8-16 mm;

[0015] Further, each group of reinforcing steel bars includes two reinforcing steel bars crossing each other;

[0016] Furthermore, the reinforcing steel bars are made of φ14-18 mm steel bars.

[0017] Furthermore, the first side steel plate, the second side steel plate, the first partition plate, the second partition plate, and the third partition plate are all connected to the bottom steel plate by welding.

[0018] Furthermore, the first side steel plate, the second side steel plate, the first partition plate, the second partition plate and the third partition plate have the same height, and the height range is 100-200 mm.

[0019] Furthermore, the width of the first cable trough and the second cable trough is 150-200 mm.

[0020] Furthermore, the distance between the first side steel plate and the first partition is 150-200 mm; the distance between the second partition and the third partition is 200-300 mm.

[0021] Furthermore, C30 concrete is poured in the first reinforcement groove and the second reinforcement groove.

[0022] Beneficial technical effects of the utility model:

[0023] In order to facilitate the maintenance of the sunken road surface, the utility model adopts a mobile road surface, which is used as the road surface of the passing section around the track; when the track sinks and needs to be repaired, the road surface of the passing section is lifted open through the pre-reserved lifting lugs, and the road surface of the passing section is lifted back to its original position after the maintenance is completed, which solves the maintenance problem after the track sinks;

[0024] In order to solve the problem that the edge concrete of the cable trough is easily crushed and damaged when it is close to the edge of the track, the utility model adopts a first reinforcement groove and a second reinforcement groove in the mobile pavement. The reinforcement groove contains reinforcing steel bars, and concrete is poured in the first reinforcement groove and the second reinforcement groove to integrate the concrete with the steel structure, thereby protecting the edge of the mobile pavement from damage, making it stronger and more reliable, and thus being able to better protect the cables in the cable trough. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a top view of a mobile pavement of a gantry crane passing through a road section used at a construction site in an embodiment of the utility model;

[0026] Figure 2 It is a cross-sectional view of a mobile pavement of a gantry crane passing through a road section used in a construction site in an embodiment of the utility model;

[0027] The accompanying drawings are marked as follows: 1. bottom steel plate; 2. first side steel plate; 3. second side steel plate; 4. first partition; 5. second partition; 6. third partition; 7. first cable trough; 8. second cable trough; 9. lifting ear setting position; 10. reinforcing steel bar. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0029] On the contrary, the present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention as defined by the claims. Further, in order to make the public have a better understanding of the present invention, some specific details are described in detail in the following detailed description of the present invention. Those skilled in the art can fully understand the present invention without the description of these details.

[0030] The utility model provides a mobile pavement embodiment for a gantry crane passing through a road section applied to a construction site, such as Figure 1-2 As shown, it includes: a bottom steel plate 1, a first side steel plate 2, a second side steel plate 3, a first partition plate 4, a second partition plate 5 and a third partition plate 6;

[0031] The bottom steel plate 1 is in a rectangular shape, the first side steel plate 2 and the second side steel plate 3 are respectively arranged on two opposite sides of the bottom steel plate 1; the first partition plate 4, the second partition plate 5 and the third partition plate 6 are arranged parallel to each other and are arranged in sequence between the first side steel plate 2 and the second side steel plate 3;

[0032] Several groups of reinforcing steel bars are arranged between the first side steel plate 2 and the first partition plate 4 to form a first reinforcement groove; several groups of reinforcing steel bars are arranged between the second partition plate 5 and the third partition plate 6 to form a second reinforcement groove;

[0033] pouring concrete in the first reinforcement groove and the second reinforcement groove;

[0034] The bottom steel plate 1 , the first partition plate 4 and the second partition plate 5 define a first cable trough 7 ; the bottom steel plate 1 , the third partition plate 6 and the second side steel plate 3 define a second cable trough 8 .

[0035] In this embodiment, two lifting ear openings are provided on the first partition plate 4, and two lifting ear openings are provided on the third partition plate 6; the diameter of each lifting ear is in the range of 30-40 mm.

[0036] Specifically, the two lifting ear openings provided on the first partition plate 4 and the two lifting ear openings provided on the third partition plate 6 are symmetrically arranged. Figure 1 The position of the lifting lug is marked in the figure 9; when pouring concrete, holes are left in the corresponding part of the lifting lug to facilitate subsequent lifting.

[0037] In this embodiment, the bottom steel plate 1, the first side steel plate 2, the second side steel plate 3, the first partition plate 4, the second partition plate 5 and the third partition plate 6 are all made of Q235 steel with a thickness of 8-16 mm (preferably 10 mm).

[0038] In this embodiment, each group of reinforcing steel bars includes two mutually intersecting reinforcing steel bars 10;

[0039] Specifically, for the reinforcing steel bar between the first side steel plate 2 and the first partition plate 4, one end is welded to the first side steel plate 2, and the other end is welded to the first partition plate 4; for the reinforcing steel bar between the second partition plate 5 and the third partition plate 6, one end is welded to the second partition plate 5, and the other end is welded to the third partition plate 6;

[0040] In this embodiment, the reinforcing steel bars are made of φ14-18 mm steel bars (preferably φ16 mm hot-rolled ribbed steel bars).

[0041] In this embodiment, the first side steel plate 2, the second side steel plate 3, the first partition plate 4, the second partition plate 5, the third partition plate 6 are all connected to the bottom steel plate 1 by welding. Specifically, a low-alloy high-strength welding rod, J507RH with a diameter of 4 mm, is used for welding.

[0042] In this embodiment, the first side steel plate 2, the second side steel plate 3, the first partition plate 4, the second partition plate 5 and the third partition plate 6 have the same height, and the height range is 100-200 mm.

[0043] In this embodiment, the width of the first cable trough 7 and the second cable trough 8 is 150-200 mm.

[0044] Furthermore, the distance between the first side steel plate 2 and the first partition plate 4 is 150-200 mm; the distance between the second partition plate 5 and the third partition plate 6 is 200-300 mm.

[0045] In this embodiment, C30 concrete is poured in the first reinforcement groove and the second reinforcement groove.

[0046] In order to facilitate the maintenance of the track that has sunk in the road section, the utility model provides a movable pavement. When maintenance is needed, a crane is used to lift the movable pavement of the road section through the gantry crane using the lifting ears reserved in advance. After the maintenance is completed, the movable pavement of the road section is lifted back to its original position, solving the maintenance problem after the track sinks.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A mobile pavement for gantry cranes across road sections used at construction sites, characterized in that: include: A bottom steel plate, a first side steel plate, a second side steel plate, a first partition plate, a second partition plate and a third partition plate; The bottom steel plate is in a rectangular shape, and the first side steel plate and the second side steel plate are respectively arranged on two opposite sides of the bottom steel plate; the first partition plate, the second partition plate and the third partition plate are arranged parallel to each other and are arranged in sequence between the first side steel plate and the second side steel plate; Several groups of reinforcing steel bars are arranged between the first side steel plate and the first partition plate to form a first reinforcement groove; several groups of reinforcing steel bars are arranged between the second partition plate and the third partition plate to form a second reinforcement groove; pouring concrete in the first reinforcement groove and the second reinforcement groove; The bottom steel plate, the first partition plate and the second partition plate define a first cable trough; the bottom steel plate, the third partition plate and the second side steel plate define a second cable trough.

2. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: Two lifting ear openings are arranged on the first partition plate, and two lifting ear openings are arranged on the third partition plate; the diameter of each lifting ear is in the range of 30-40 mm.

3. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: The bottom steel plate, the first side steel plate, the second side steel plate, the first partition plate, the second partition plate and the third partition plate are all made of Q235 steel with a thickness of 8-16 mm.

4. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: Each set of reinforcing steel bars includes two reinforcing steel bars that cross each other.

5. According to claim 4, a gantry crane mobile pavement used in a construction site is characterized in that: The reinforcing steel bars are made of φ14-18 mm steel bars.

6. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: The first side steel plate, the second side steel plate, the first partition plate, the second partition plate, and the third partition plate are all connected to the bottom steel plate by welding.

7. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: The first side steel plate, the second side steel plate, the first partition plate, the second partition plate and the third partition plate have the same height, and the height range is 100-200 mm.

8. According to claim 1, a gantry crane mobile pavement used in a construction site is characterized in that: The width of the first cable trough and the second cable trough is 150-200 mm.

9. The mobile pavement for gantry crane crossing road section used in construction sites according to claim 1, characterized in that: The distance between the first side steel plate and the first partition is 150-200 mm; the distance between the second partition and the third partition is 200-300 mm.

10. The mobile pavement for gantry crane crossing road section used in construction sites according to claim 1, characterized in that: Pour C30 concrete in the first reinforcement groove and the second reinforcement groove.