Prefabricated concrete temporary road
By designing splicable temporary road board components and related devices, the operation difficulties caused by excessive weight of traditional temporary road boards are solved, convenient transportation and installation are achieved, and operation convenience and safety of staff are improved.
Patent Information
- Application Number
- CN202421258585.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-03
AI Technical Summary
Due to the large weight of traditional temporary road boards, it makes it difficult to operate during transportation, installation and dismantling, which increases the difficulty of operation for staff.
By designing a prefabricated temporary concrete road, including multiple splicable road panel components and special splicing, drainage and cleaning devices, the batch transportation and flexible installation and disassembly of road panels are realized.
By decomposing the weight of the circuit board, this solution reduces transportation and operation difficulty, improves the operation convenience and safety of staff, and achieves rapid drainage and cleaning functions.
Smart Images

Figure CN222730268U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of roads, in particular to a prefabricated temporary concrete road. Background Art
[0002] The word "road" literally means the infrastructure for various trackless vehicles and pedestrians to pass through. According to its usage characteristics, it can be divided into highways, urban roads, rural roads, factory and mining roads, forestry roads, examination roads, competition roads, automobile test roads, workshop passages and school roads, etc. In ancient China, there were also post roads. In addition, it also refers to the way to achieve a certain goal, the way things develop and change.
[0003] When prefabricating temporary roads, workers select appropriate prefabricated templates according to the size requirements of the road, then pour concrete inside the templates. After the concrete solidifies, multiple road slabs can be transported to appropriate locations, and then arranged and placed in sequence to complete the paving of temporary roads.
[0004] Traditional temporary road slabs are produced as a whole, and because the concrete itself is heavy, the weight of the formed road slab is also heavy, which makes it difficult for workers to transport, arrange, install and dismantle them afterwards, making their operations more difficult and causing inconvenience to the workers. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a prefabricated concrete temporary road, which solves the problem that traditional temporary road slabs are produced as an integral road slab. Since the concrete itself is heavy, the weight of the formed road slab will also be heavy, which makes it difficult for workers to transport, arrange and install the road slabs and subsequently dismantle them due to the heavy weight of the road slabs, making their operations more difficult and causing inconvenience to the workers.
[0006] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a prefabricated concrete temporary road, including a first lower road plate, a second lower road plate is arranged on one side of the first lower road plate, a first upper road plate is installed above the first lower road plate, and a second upper road plate is arranged on one side of the first upper road plate to be in contact with the top of the second lower road plate. The prefabricated concrete temporary road also includes: a splicing device, which is arranged above the first lower road plate and the second lower road plate; a drainage device, which is arranged above the first lower road plate and the second lower road plate; a cleaning device, which is installed on the top of the first upper road plate and the second upper road plate; wherein the splicing device can splice a plurality of first lower road plates, second lower road plates, first upper road plates and second upper road plates together, the drainage device can discharge external rainwater, and the cleaning device can clean the surfaces of the first upper road plate and the second upper road plate through an external water supply device.
[0007] Preferably, the bottoms of the first lower road plate and the second lower road plate are cast with plug blocks, the inner walls of the first lower road plate and the second lower road plate are installed with multiple support plates, and the tops of the multiple support plates are respectively fitted with the inner walls of the first upper road plate and the second upper road plate.
[0008] Preferably, the splicing device includes: a connecting plate, installed in the top grooves of the first upper road plate and the second upper road plate; two clamping plates, which are respectively cast on one side of the first lower road plate and the second lower road plate; a plurality of first vertical plates, which are respectively cast on the bottom of the first upper road plate and the second upper road plate, and respectively plugged into the grooves of the first lower road plate and the second lower road plate; wherein the connecting plate, the clamping plate and the first vertical plate can splice and fix the first lower road plate, the second lower road plate, the first upper road plate and the second upper road plate.
[0009] Preferably, the drainage device includes: a plurality of drainage grooves, which are respectively processed on the top of the first upper road plate and the second upper road plate; a plurality of holes, which are respectively processed on the top of the first upper road plate and the second upper road plate; two water guide ports, which are respectively processed under the first lower road plate and the second lower road plate; wherein external rainwater can enter the interior of the first lower road plate and the second lower road plate through the drainage grooves and the holes, and then be discharged through the water guide ports.
[0010] Preferably, the cleaning device includes: a plurality of second vertical plates, which are respectively installed on the top of the first upper road plate and the second upper road plate; a plurality of water pipes, which are respectively arranged inside the plurality of second upper road plates; a plurality of nozzles, which are respectively connected to one side of the plurality of water pipes at equal distances; wherein external cleaning water can be sprayed onto the top of the first upper road plate and the second upper road plate through the water pipes and the nozzles for cleaning.
[0011] Beneficial Effects
[0012] The utility model provides a prefabricated concrete temporary road. It has the following beneficial effects: the prefabricated concrete temporary road can divide a single road plate into multiple components through the cooperation of the first lower road plate, the second lower road plate, the first upper road plate, the second upper road plate, the splicing device and the plug-in block, and then splice into a complete road plate, so that batch transportation can be achieved, which can greatly reduce the difficulty of transportation, and when the road is arranged and installed and disassembled afterwards, the installation and disassembly can be carried out in sequence, so that the weight of a single operation can be reduced, and the difficulty of the staff's work is reduced. Moreover, due to the reduction in weight, the danger during work is also reduced, which brings convenience to the staff's use;
[0013] The cooperation of the drainage device and the cleaning device can quickly discharge external rainwater, thereby preventing puddles from appearing on the road surface. When mud is generated on the road surface, the road surface can be washed using external water supply equipment, without the need for manpower to wash the road, making it convenient for staff to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 for Figure 1 A cross-sectional view of
[0016] Figure 3 for Figure 2 Schematic diagram of the structure of the first lower road plate, the second lower road plate and the support plate.
[0017] In the figure: 1. first lower road plate, 2. splicing device, 201. connecting plate, 202. card plate, 203. first vertical plate, 3. drainage device, 301. drainage groove, 302. hole, 303. water guide port, 4. cleaning device, 401. second vertical plate, 402. water pipe, 403. nozzle, 5. first upper road plate, 6. second upper road plate, 7. support plate, 8. plug-in block, 9. second lower road plate. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.
[0020] The traditional temporary road slab is produced as a whole road slab. Since the concrete itself is heavy, the weight of the formed road slab is also heavy, which makes it difficult for the workers to transport, arrange, install and dismantle it afterwards, making the operation difficult for the workers, which in turn brings inconvenience to the workers.
[0021] In view of this, the utility model provides a prefabricated concrete temporary road. Through the cooperation of a first lower road plate, a second lower road plate, a first upper road plate, a second upper road plate, a splicing device and an insert block, a single road plate can be divided into multiple components, which are then spliced into a complete road plate, so that batch transportation can be achieved, which can greatly reduce the difficulty of transportation. Moreover, when arranging and installing the road and disassembling it afterwards, the installation and disassembly can be carried out in sequence, so that the weight of a single operation can be reduced, thereby reducing the difficulty of work for the staff. Moreover, due to the reduction in weight, the danger during work is also reduced, which brings convenience to the staff.
[0022] Embodiment 1: Figure 1 , 2 As can be seen from 3, a prefabricated temporary concrete road comprises a first lower road plate 1, a second lower road plate 9 is arranged on one side of the first lower road plate 1, a first upper road plate 5 is installed above the first lower road plate 1, and a second upper road plate 6 which fits with the top of the second lower road plate 9 is arranged on one side of the first upper road plate 5. The prefabricated temporary concrete road also comprises: a splicing device 2, which is arranged above the first lower road plate 1 and the second lower road plate 9; a drainage device 3, which is arranged above the first lower road plate 1 and the second lower road plate 9; a cleaning device 4, which is installed on the top of the first upper road plate 5 and the second upper road plate 6; wherein the splicing device 2 can splice together a plurality of first lower road plates 1, second lower road plates 9, first upper road plates 5 and second upper road plates 6, the drainage device 3 can discharge external rainwater, and the cleaning device 4 can clean the surface of the first upper road plate 5 and the second upper road plate 6 through an external water supply device;
[0023] In the specific implementation process, it is worth pointing out that a plurality of first lower road plates 1, second lower road plates 9, first upper road plates 5 and second upper road plates 6 can be spliced into a complete temporary road surface, and the drainage device 3 can discharge the external water source and the water during cleaning by the cleaning device 4;
[0024] Furthermore, the bottoms of the first lower road plate 1 and the second lower road plate 9 are cast with plug blocks 8, and the inner walls of the first lower road plate 1 and the second lower road plate 9 are installed with multiple support plates 7, and the tops of the multiple support plates 7 are respectively fitted with the inner walls of the first upper road plate 5 and the second upper road plate 6;
[0025] In the specific implementation process, it is worth pointing out that the insert block 8 can improve the stability of the prefabricated temporary concrete road during paving, and the support plate 7 can improve the supporting load of the prefabricated temporary concrete road;
[0026] Specifically, when using the prefabricated temporary concrete road, the staff first installs an appropriate number of first lower road plates 1, second lower road plates 9, first upper road plates 5 and second upper road plates 6, and then uses the splicing device 2 to splice and install them. When it rains outside or the prefabricated temporary concrete road is cleaned using the cleaning device 4, the water can be discharged through the drainage device 3.
[0027] Embodiment 2: By Figure 1 , 2 As can be seen from Figures 3 and 4, the splicing device 2 includes: a connecting plate 201, which is installed in the top groove of the first upper road plate 5 and the second upper road plate 6; two clamping plates 202 are provided, and are cast on one side of the first lower road plate 1 and the second lower road plate 9 respectively; a plurality of first vertical plates 203 are provided, which are cast on the bottom of the first upper road plate 5 and the second upper road plate 6 respectively, and are plugged into the grooves of the first lower road plate 1 and the second lower road plate 9 respectively; wherein the connecting plate 201, the clamping plate 202 and the first vertical plate 203 can splice and fix the first lower road plate 1, the second lower road plate 9, the first upper road plate 5 and the second upper road plate 6;
[0028] In the specific implementation process, it is worth pointing out that the connecting plate 201, the card plate 202 and the first vertical plate 203 can be used to install and limit the plurality of first lower road plates 1, second lower road plates 9, first upper road plates 5 and second upper road plates 6;
[0029] Specifically, based on the above-mentioned embodiment one, when multiple first lower road plates 1, second lower road plates 9, first upper road plates 5 and second upper road plates 6 are spliced, they can be installed by clamping and limiting through connecting plates 201, clamping plates 202 and first vertical plates 203, thereby forming a complete temporary road surface.
[0030] Embodiment 3: By Figure 1 , 2As can be seen from Figures 3 and 4, the drainage device 3 includes: a plurality of drainage grooves 301, which are respectively processed on the top of the first upper road plate 5 and the second upper road plate 6; a plurality of holes 302, which are respectively processed on the top of the first upper road plate 5 and the second upper road plate 6; two water guide ports 303, which are respectively processed under the first lower road plate 1 and the second lower road plate 9; wherein external rainwater can enter the interior of the first lower road plate 1 and the second lower road plate 9 through the drainage grooves 301 and the holes 302, and then be discharged through the water guide ports 303;
[0031] In the specific implementation process, it is worth pointing out that external rainwater can enter the lower part of the first lower road plate 1 and the second lower road plate 9 through the drainage groove 301 and the hole 302, and can be discharged through the water guide port 303;
[0032] Specifically, based on the above-mentioned embodiments 1 and 2, when it rains outside, rainwater enters the lower part of the first lower road plate 1 and the second lower road plate 9 through the drainage groove 301 and the hole 302, and then due to the fluidity of the water flow, it can be discharged through the water guide port 303, thereby completing the drainage work.
[0033] Embodiment 4: By Figure 1 , 2 As can be seen from Figures 3 and 4, the cleaning device 4 includes: a plurality of second vertical plates 401, which are respectively installed on the top of the first upper plate 5 and the second upper plate 6; a plurality of water pipes 402, which are respectively arranged inside the plurality of second vertical plates 401; a plurality of nozzles 403, which are respectively connected to one side of the plurality of water pipes 402 at equal distances; wherein external cleaning water can be sprayed to the top of the first upper plate 5 and the second upper plate 6 for cleaning through the water pipes 402 and the nozzles 403;
[0034] In the specific implementation process, it is worth pointing out that the water pipe 402 is connected to the external water supply device, and then the external water source can be sprayed on the top of the prefabricated concrete temporary road through the water pipe 402 and the nozzle 403 to perform cleaning work;
[0035] Specifically, based on the above-mentioned embodiments 1 and 2, when the prefabricated temporary concrete road needs to be cleaned, the staff uses an external water supply device to introduce cleaning water into the interior of the water pipe 402, and then the cleaning water is sprayed from the nozzle 403 to the top of the prefabricated temporary concrete road, and then cleaning can be carried out.
[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0037] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A prefabricated concrete temporary road, comprising a first lower road slab (1), characterized in that: A second lower road plate (9) is arranged on one side of the first lower road plate (1), a first upper road plate (5) is installed above the first lower road plate (1), a second upper road plate (6) is arranged on one side of the first upper road plate (5) and is in contact with the top of the second lower road plate (9), and the prefabricated concrete temporary road further comprises: A splicing device (2) is arranged above the first lower road plate (1) and the second lower road plate (9); A drainage device (3) is arranged above the first lower road plate (1) and the second lower road plate (9); A cleaning device (4) is installed on the top of the first upper road plate (5) and the second upper road plate (6); The splicing device (2) can splice together a plurality of first lower road plates (1), second lower road plates (9), first upper road plates (5) and second upper road plates (6); the drainage device (3) can discharge external rainwater; and the cleaning device (4) can clean the surfaces of the first upper road plates (5) and the second upper road plates (6) through an external water supply device.
2. The prefabricated concrete temporary road according to claim 1 is characterized in that: Insert blocks (8) are cast at the bottom of the first lower road plate (1) and the second lower road plate (9), and a plurality of support plates (7) are installed on the inner walls of the first lower road plate (1) and the second lower road plate (9), and the tops of the plurality of support plates (7) are respectively fitted with the inner walls of the first upper road plate (5) and the second upper road plate (6).
3. The prefabricated concrete temporary road according to claim 1 is characterized in that: The splicing device (2) comprises: A connecting plate (201) mounted on the top grooves of the first upper plate (5) and the second upper plate (6); Two clamping plates (202) are provided and cast on one side of the first lower road plate (1) and the second lower road plate (9) respectively; A plurality of first vertical plates (203) are provided, cast respectively on the bottom of the first upper road plate (5) and the second upper road plate (6), and respectively plugged into the grooves of the first lower road plate (1) and the second lower road plate (9); The connecting plate (201), the clamping plate (202) and the first vertical plate (203) can splice and fix the first lower road plate (1), the second lower road plate (9), the first upper road plate (5) and the second upper road plate (6).
4. The prefabricated temporary concrete road according to claim 1 is characterized in that: The drainage device (3) comprises: A plurality of drainage grooves (301) are provided and are respectively processed on the top of the first upper road plate (5) and the second upper road plate (6); A plurality of holes (302) are provided and are respectively processed on the top of the first upper road plate (5) and the second upper road plate (6); Two water guide ports (303) are provided and are respectively processed below the first lower road plate (1) and the second lower road plate (9); Rainwater from the outside can enter the interior of the first lower road plate (1) and the second lower road plate (9) through the drainage groove (301) and the hole (302), and then be discharged through the water guide port (303).
5. The prefabricated concrete temporary road according to claim 1 is characterized in that: The cleaning device (4) comprises: A plurality of second vertical plates (401) are provided and are respectively installed on the top of the first upper road plate (5) and the second upper road plate (6); A plurality of water pipes (402) are provided, and are respectively arranged inside the plurality of second vertical plates (401); A plurality of nozzles (403) are provided and are connected to one side of the plurality of water pipes (402) at equal distances; The external cleaning water can be sprayed onto the top of the first upper plate (5) and the second upper plate (6) through the water pipe (402) and the nozzle (403) for cleaning.