A bridge pier reinforcement structure
By using multiple arc-shaped hoops and bent frames to form an annular structure to reinforce the bridge pier column, the existing reinforcement methods are solved, and the problems of high resource, time and cost consumption are achieved, and the rapid and effective reinforcement effect is achieved.
Patent Information
- Application Number
- CN202421527354.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-07-01
AI Technical Summary
The existing bridge pier column reinforcement methods have high resources, time and cost consumption, and are complex in construction, making it difficult to quickly and effectively reinforce aged or cracked pier columns.
Multiple arc hoops and bending frames are used to form an annular structure, which strengthens the pier column by bolt fixation and clamping, and increases the overall strength through grouting grooves and wire mesh.
The rapid reinforcement of bridge pier columns has been achieved, the construction cost and time has been reduced, and the reinforcement effect is significant and the overall construction efficiency is high.
Smart Images

Figure CN222730381U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge reinforcement, in particular to a bridge pier reinforcement structure. Background Art
[0002] Bridge piers are important components that support bridge structures and are usually made of concrete or steel. They bear the weight of the bridge superstructure (such as the bridge deck, beams, etc.) and transfer the gravity to the foundation or piers, and finally disperse it to the ground or pier foundations; during the construction process, piers are usually cast or assembled according to the design drawings to ensure that they have sufficient strength and stability to support the entire bridge structure.
[0003] Since bridge piers bear huge loads from the road surface, bridges and vehicles, they will age or crack after a certain number of years of use. The existing construction method is usually to directly demolish and rebuild or to use molds to surround and pour reinforced concrete for reinforcement. However, direct demolition and reconstruction will cause huge consumption of resources, time and costs for piers that can still be used, while pouring reinforced concrete for reinforcement requires more manual participation and more precise construction technology and equipment, resulting in high overall construction costs and long construction time. Utility Model Content
[0004] The utility model aims to provide a bridge pier reinforcement structure, which can facilitate the reinforcement of the bridge pier, accelerate the overall construction progress, and save construction costs.
[0005] The embodiment of the utility model is realized by the following technical scheme: A bridge pier reinforcement structure, comprising:
[0006] Hoop plates, which are multiple and arc-shaped, are hingedly arranged in pairs to form a long strip, and the ends of the multiple hoop plates are fixed together by bolts and used to circumferentially tighten to the pier column;
[0007] A bending frame is hingedly arranged at the upper and lower ends of each hoop piece;
[0008] The clamping plate is in the form of an arc-shaped sheet and is fixedly arranged at one end of each bending frame away from its own hinge point and is used to tighten against the pier column;
[0009] A fixing member is used to lock the position of all the clamps when all the clamps are pressed against the pier.
[0010] Furthermore, each hoop plate and clamp plate is provided with a grouting groove on one side close to the pier column, a wire mesh is fixedly arranged in the grouting groove, and each hoop plate and clamp plate is provided with a grouting hole interconnected with the grouting groove near the upper end.
[0011] Furthermore, a plurality of thorn rods are fixedly arranged on the bottom wall of the grouting groove, and the thorn rods extend out of the grouting groove toward one side of the pier column, and the thorn rods are provided with a plurality of bending notches along their length direction.
[0012] Furthermore, connecting openings for connecting the grouting grooves between adjacent hoop pieces are provided between adjacent hoop pieces, and the number of the connecting openings is multiple, and the multiple connecting openings are all opened toward the side of the pier. Meanwhile, connecting openings for connecting the grouting grooves between adjacent splints are also provided between adjacent splints, and the connecting openings of the splints are also opened toward the side of the pier, and rubber pads are provided in the gaps between adjacent hoop pieces and the gaps between adjacent splints.
[0013] Furthermore, U-shaped clamp rods are vertically penetrated on the upper adjacent clamp plates, and the U-shaped clamp rods pass through the lower adjacent hoop plates and the adjacent clamp plates at the same time, and the U-shaped clamp rods pass through the connecting openings between the adjacent hoop plates and the adjacent clamp plates.
[0014] Furthermore, the fixing member includes a clamp, which is used to surround the outer sides of all bending frames arranged on the same side above and below the hoop plate, and the outer side surface of each bending frame is correspondingly provided with a bayonet for accommodating the clamp.
[0015] Furthermore, each of the bending frames is fixedly provided with a positioning rod, and the positioning rod is in an 'L' shape. The upper and lower end surfaces of the hoop are respectively provided with positioning slots for inserting the positioning rod. When the positioning rod is inserted into the positioning slot, the clamp is in a position pressed against the side wall of the pier, and the positioning rod is provided with a positioning stud threadedly connected to the bottom wall of the positioning slot.
[0016] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:
[0017] 1. The utility model uses a plurality of hoop plates to clamp the parts of the bridge piers that need to be processed, and uses bolts to tighten and fix them. During this period, the number of hoop plates can be adjusted according to the diameter of the pier to improve applicability, and then the clamps are rotated to make all the clamps press against the piers, thereby increasing the reinforcement range and reinforcement strength. Finally, the position of the clamps is fixed by fixing parts, thereby realizing the reinforcement of the piers. The overall operation is simple, and the fixing effect is good and the construction efficiency is high. Since the hoop plates, clamps and other structures are prefabricated in advance using metal materials such as stainless steel, the investment in labor costs during construction is reduced, and the construction cost is saved.
[0018] 2. The utility model pours cement mortar into the grouting groove through the grouting hole, so that the cement mortar, the hoop plate and the clamping plate become a whole, and the steel wire mesh, the barbed rod and the cement mortar can effectively improve the overall strength. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 A schematic diagram of the overall structure of the bridge pier reinforcement structure provided by the utility model;
[0021] Figure 2 This is a schematic diagram of the internal structure of the utility model for displaying the bridge pier reinforcement structure;
[0022] Figure 3 This is a schematic diagram of the structure of the utility model for separately displaying the hoop piece, the clamping plate and the grouting groove;
[0023] Figure 4 For this utility model Figure 3 Enlarged view of part A.
[0024] Icons: 1-hoop, 11-grouting groove, 12-thorn rod, 121-bending notch, 13-rubber pad, 14-ear plate, 2-bending frame, 21-bayonet, 3-splint, 31-grouting hole, 32-connecting port, 4-fixing part, 41-hoop, 5-wire mesh, 6-U-shaped clamp rod, 7-positioning rod, 71-positioning slot, 72-positioning stud, 8-bolt. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0026] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example
[0027] The following is further described in conjunction with specific embodiments. Figure 1-Figure 4As shown, the utility model is a bridge pier reinforcement structure, including hoop plates 1, which are multiple and arc-shaped, hingedly installed between two to form a long strip, and the hinge shafts between adjacent hoop plates 1 are pin-shaped to achieve detachable connection, so as to adjust the number of hoop plates 1, and ear plates 14 are welded at both ends of the multiple hoop plates 1, and the hoop plates 1 at both ends are fixed by bolts 8 passing through the ear plates 14; the bending frame 2 is hingedly installed at the upper and lower ends of each hoop plate 1. The hinge axis is tangent to the outer circumference of the pier; the plywood 3 is in the shape of an arc sheet, and is fixedly welded to one end of each bending frame 2 away from its own hinge point, and is used to press against the pier, and after the multiple plywood 3 is rotated and fitted on the pier, the whole forms a circular ring, so as to better reinforce the pier;
[0028] Reference Figure 2 , Figure 3 A grouting groove 11 is provided on one side of each hoop piece 1 and the splint 3 near the pier column, and a steel mesh 5 is fixedly welded in the grouting groove 11. The steel mesh 5 is laid in the grouting groove 11 and is located in the middle position of the grouting groove 11. A grouting hole 31 connected with the grouting groove 11 is provided near the upper end of each hoop piece 1 and the splint 3, so as to inject cement mortar into the grouting groove 11, and a plurality of thorn rods 12 are fixedly welded on the bottom wall of the grouting groove 11. The thorn rod 12 is made of stainless steel metal material, and the thorn rod 12 extends out of the grouting groove 11 toward one side of the pier column. At the same time, the thorn rod 12 is provided with a plurality of bending notches 121 along its length direction. After the hoop piece 1 and the splint 3 are tightly fixed on the pier column, a part of the thorn rod 12 will pierce the pier column, or bend along the bending notch 121. After the cement mortar is injected into the grouting groove 11, the cement mortar can be better combined and fixed with the pier column.
[0029] A connecting opening 32 is provided between adjacent hoop pieces 1 to connect the grouting grooves 11 between adjacent hoop pieces 1. There are multiple connecting openings 32, and the multiple connecting openings 32 are all opened toward the side of the pier. At the same time, a connecting opening 32 is also provided between adjacent plywood 3 to connect the grouting grooves 11 between adjacent plywood 3. The connecting opening 32 of the plywood 3 is also opened toward the side of the pier. The connecting opening 32 allows cement mortar to flow in, thereby improving the strength of the entire plywood 3 and hoop piece 1. Rubber pads 13 are provided in the gaps between adjacent hoop pieces 1 and the gaps between adjacent plywood 3. The rubber pads 13 can prevent cement mortar from flowing out, thereby reducing the overall strength.
[0030] Reference Figure 2 , Figure 3In order to improve the connection strength between the upper and lower clamping plates 3 and the hoop pieces 1, U-shaped clamping rods 6 are vertically penetrated on the upper adjacent clamping plates 3, and the U-shaped clamping rods 6 pass through the lower adjacent hoop pieces 1 and the adjacent clamping plates 3 at the same time. At the same time, the U-shaped clamping rods 6 pass through the connecting openings 32 between the adjacent hoop pieces 1 and the adjacent clamping plates 3. When the cement mortar is poured in, the cement mortar will be poured together with the U-shaped clamping rods 6, thereby improving the overall strength and being able to improve the connection strength between the adjacent hoop pieces 1 and the adjacent clamping plates 3.
[0031] Reference Figure 1 , Figure 2 The fixing part 4 includes a hoop 41, which is divided into two halves, which are hingedly installed with each other and are made of high-strength stainless steel. At the same time, it is fixed into a ring shape by bolts 8. The hoop 41 is surrounded by the outer sides of all the bending frames 2 on the same side of the upper and lower sides of the hoop piece 1 to achieve the fixation of all the splints 3. The operation is simple and convenient. In this embodiment, the number of hoops 41 on the upper and lower sides of the hoop piece 1 is one. In actual installation and use, in order to improve the reinforcement effect, multiple hoops 41 can be used, and the outer side surface of each bending frame 2 is correspondingly provided with a bayonet 21 for accommodating the hoop 41. The bayonet 21 can limit the position of the hoop 41 to prevent the hoop 41 from sliding.
[0032] Reference Figure 3 , Figure 4 A positioning rod 7 is fixedly welded on each bending frame 2, and the positioning rod 7 is in an 'L' shape. Positioning slots 71 for inserting the positioning rod 7 are correspondingly opened on the upper and lower end surfaces of the hoop 1. When the positioning rod 7 is inserted into the positioning slot 71, the clamp 3 is in a position close to the side wall of the pier, and the positioning rod 7 is threaded with a positioning stud 72 connected to the bottom wall of the positioning slot 71. When the clamp 3 is abutted and fixed on the pier, the positioning rod 7 is tightened by the positioning stud 72, so as to further fix the position of the clamp 3, thereby preventing the clamp 3 from rotating and opening and failing when subjected to excessive external force.
[0033] The working process of this embodiment is: first, adjust the number of appropriate hoop plates 1 according to the diameter of the pier, and then tighten the multiple hoop plates 1 to the parts of the bridge pier that need to be processed, use bolts 8 to pass through the ear plates 14 to tighten and fix all hoop plates 1, and then rotate the clamps 3 to make all the clamps 3 press against the pier, and then use the clamps 41 to fix the positions of all the clamps 3 on the upper and lower sides of the hoop plates 1 respectively, and insert the U-shaped clamp rod 6 vertically corresponding to the adjacent clamps 3 along the top, tighten the positioning studs 72 to fix the positioning rods 7 to further fix the clamps 3, and finally pour cement mortar through the grouting holes 31 of each hoop plate 1 and clamp 3. After the cement mortar solidifies, the pier is reinforced. The overall operation is simple, the fixing effect is good, the construction efficiency is high, and the construction cost is saved.
[0034] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A bridge pier reinforcement structure, characterized in that: include: The hoop plates (1) are multiple in number and are in the form of arc-shaped plates, and are hingedly arranged in pairs to form a long strip. The head and tail ends of the multiple hoop plates (1) are fixedly connected together by bolts (8) and are used to circumferentially clamp onto the pier column; A bending frame (2) is hingedly arranged at the upper and lower ends of each hoop sheet (1); The clamping plate (3) is in the form of an arc-shaped sheet and is fixedly arranged at one end of each bending frame (2) away from its hinge point and is used to be pressed against the pier column; The fixing member (4) is used to lock the positions of all the clamping plates (3) when all the clamping plates (3) are pressed against the pier.
2. The bridge pier reinforcement structure according to claim 1, characterized in that: Each hoop plate (1) and each clamp plate (3) is provided with a grouting groove (11) on one side close to the pier column, a steel wire mesh (5) is fixedly arranged in the grouting groove (11), and each hoop plate (1) and each clamp plate (3) is provided with a grouting hole (31) in communication with the grouting groove (11) at a position close to the upper end.
3. The bridge pier reinforcement structure according to claim 2, characterized in that: A plurality of thorn rods (12) are fixedly arranged on the bottom wall of the grouting groove (11), and the thorn rods (12) extend out of the grouting groove (11) toward one side of the pier column. The thorn rods (12) are provided with a plurality of bending notches (121) along their length direction.
4. The bridge pier reinforcement structure according to claim 2, characterized in that: A connecting opening (32) for connecting the grouting grooves (11) between the adjacent hoop pieces (1) is provided between the adjacent hoop pieces (1). The number of the connecting openings (32) is plural, and the plural connecting openings (32) are all opened toward the side of the pier column. Meanwhile, a connecting opening (32) for connecting the grouting grooves (11) between the adjacent clamping plates (3) is also provided between the adjacent clamping plates (3), and the connecting opening (32) of the clamping plates (3) is also opened toward the side of the pier column. Rubber pads (13) are provided in the gaps between the adjacent hoop pieces (1) and the gaps between the adjacent clamping plates (3).
5. The bridge pier reinforcement structure according to claim 4, characterized in that: A U-shaped clamp rod (6) is vertically penetrated on each of the adjacent clamp plates (3) above, and the U-shaped clamp rod (6) simultaneously and correspondingly penetrates the adjacent hoop plate (1) and the adjacent clamp plate (3) below, and the U-shaped clamp rod (6) passes through the connecting opening (32) between the adjacent hoop plate (1) and the adjacent clamp plate (3).
6. The bridge pier reinforcement structure according to claim 1, characterized in that: The fixing member (4) comprises a clamp (41) which is used to surround the outer side surfaces of all bending frames (2) arranged on the same side above and below the clamping plate (1), and the outer side surface of each bending frame (2) is correspondingly provided with a clamping socket (21) for accommodating the clamp (41).
7. The bridge pier reinforcement structure according to claim 1, characterized in that: A positioning rod (7) is fixedly provided on each of the bending frames (2), and the positioning rod (7) is in an "L" shape. The upper and lower end surfaces of the hoop plate (1) are provided with corresponding positioning slots (71) for inserting the positioning rod (7). When the positioning rod (7) is inserted into the positioning slot (71), the clamping plate (3) is in a position pressed against the side wall of the pier column, and the positioning rod (7) is provided with a positioning stud (72) threadedly connected to the bottom wall of the positioning slot (71).