A municipal public multi-layer integrated pipe gallery
By adopting the design of slide rails and frame structures in the multi-layer integrated pipe corridor, the rapid adjustment of the rack and the shrinkable function of the ladder are realized, which solves the problem of rack adjustment in the prior art and improves construction efficiency and space utilization efficiency.
Patent Information
- Application Number
- CN202421517175.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-29
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-29
AI Technical Summary
The shelf height and position adjustment of the existing multi-layer comprehensive pipeline corridor is troublesome, and it cannot quickly adapt to the laying requirements of pipelines of different specifications, affecting construction efficiency.
A municipal public multi-layer integrated pipe gallery was designed, adopting a slide rail and a frame structure. The frame can adjust its position left and right, and the limit columns and sliding holes are engaged to realize the height adjustment of the installation strips. A shrinking mechanism is set up in the middle of the lower floor of the main body of the pipe gallery to realize the shrinkable function of the ladder.
Through the sliding adjustment position of the frame on the slide rail, the engagement of the limit column and the sliding hole adjust the height, the rapid adjustment of the frame is achieved, the construction efficiency is improved, and space is saved through the retractable ladder, which is convenient for construction or inspection personnel to pass.
Smart Images

Figure CN222730606U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of integrated pipe corridors, in particular to a municipal public multi-layer integrated pipe corridor. Background Art
[0002] A comprehensive pipeline corridor is an intensive tunnel space built underground in the city. It lays various municipal pipelines such as electricity, communications, gas, heating, water supply and drainage in the tunnel, and implements unified planning, design, construction and maintenance.
[0003] Modern integrated pipeline corridors have developed into multi-layer structures, which can not only accommodate more pipelines, but also realize real-time monitoring and management of pipelines through intelligent management systems, greatly improving the operation and maintenance efficiency and safety of pipelines.
[0004] In the prior art, racks are set on both sides of the multi-story integrated pipe gallery for laying small pipes, wherein the racks are mostly fixed with bolts, so it is difficult to adjust the height and position, and cannot quickly adapt to the laying requirements of pipes of different specifications, affecting the construction efficiency of the staff. Utility Model Content
[0005] In order to make up for the above shortcomings, the utility model provides a municipal public multi-story integrated pipe gallery, aiming to improve the problem that the height and position adjustment of the shelves on both sides inside the multi-story integrated pipe gallery are difficult, which affects the construction efficiency.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a municipal public multi-story integrated pipe gallery, including a pipe gallery main body, two sliding rails are fixedly connected to both sides of the lower layer of the pipe gallery main body, and multiple frames are slidably connected between the opposite sides of the two sliding rails on one side, and multiple sliding holes are opened on both sides of the frames. Multiple support blocks are arranged on both sides of the outside of the frames, and two limit columns are fixedly connected to the inner sides of the support blocks, and the outsides of the limit columns are slidably connected to the inside of the sliding holes. The support blocks are fixedly connected to the outsides away from the limit columns with mounting strips, and a retraction mechanism is arranged in the middle of the lower layer of the pipe gallery main body.
[0007] As a further description of the above technical solution:
[0008] The retraction mechanism includes a storage box, the top of which is fixedly connected to the middle of the lower layer of the pipe gallery body, slide grooves are provided on both sides of the storage box, a slide block is slidably connected between the two slide grooves, and limit strips are fixedly connected on both sides of the slide block, both ends of the slide block on the side away from the storage box are rotatably connected to front pillars, both sides of the middle of the slide block are rotatably connected to rear pillars, a plurality of pedals are rotatably connected between opposite sides of the two front pillars, and the other end of the pedals is rotatably connected between opposite sides of the two rear pillars, and an entrance is provided in the middle of the lower layer of the pipe gallery body.
[0009] As a further description of the above technical solution:
[0010] A support column is fixedly connected between the mounting bar and the support block, and the outer portion of the limit column is engaged with the bottom of the sliding hole.
[0011] As a further description of the above technical solution:
[0012] A plurality of limiting pieces are fixedly connected to the top of the mounting bar.
[0013] As a further description of the above technical solution:
[0014] The two limit strips are located outside the two sides of the storage box, and the entrance is located at the rear side of the storage box.
[0015] As a further description of the above technical solution:
[0016] A plurality of lighting lamps are arranged inside the pipe gallery body, and a plurality of load-bearing columns are fixedly connected inside the two sides of the pipe gallery body.
[0017] As a further description of the above technical solution:
[0018] The bottom of the front support is in contact with the bottom of the lower layer of the pipe gallery body, and the bottom of the rear support is in contact with the bottom of the lower layer of the pipe gallery body.
[0019] As a further description of the above technical solution:
[0020] The pedal is parallel to the lower bottom of the pipe gallery body.
[0021] The utility model has the following beneficial effects:
[0022] 1. In the utility model, the frame slides on the slide rail to achieve the function of adjusting the position of the frame to the left and right, and the limit column is locked with the sliding hole to achieve the height adjustment of the mounting strip. Therefore, the entire frame can be quickly adjusted according to the laying requirements of the pipeline, thereby improving the construction efficiency.
[0023] 2. In the utility model, the ladder can be retracted by lifting the rear support parallel to the sliding block and then pushing it into the storage box through the slide groove. When not in use, it can be folded up without taking up space, which is convenient for construction or inspection personnel to pass through the corridor. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A three-dimensional diagram of a municipal public multi-storey integrated pipe gallery proposed by the utility model;
[0025] Figure 2 This is an internal structural diagram of a municipal public multi-layer integrated pipe gallery proposed by the utility model;
[0026] Figure 3 This is a schematic diagram of the structure of a limit column in a municipal public multi-story integrated pipe gallery proposed by the utility model;
[0027] Figure 4 The utility model is a schematic structural diagram of a contraction mechanism in a municipal public multi-layer integrated pipe gallery.
[0028] Legend:
[0029] 1. Pipe gallery body; 2. Slide rail; 3. Frame; 4. Sliding hole; 5. Support block; 6. Limit column; 7. Mounting strip; 8. Support column; 9. Limit plate; 10. Retraction mechanism; 1001. Storage box; 1002. Slide groove; 1003. Sliding block; 1004. Limit bar; 1005. Front support; 1006. Rear support; 1007. Pedal; 1008. Entrance; 11. Lighting; 12. Load-bearing column. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0031] Reference Figure 1 - Figure 3The utility model provides an embodiment: a municipal public multi-layer integrated pipe gallery, including a pipe gallery main body 1, two slide rails 2 are fixedly connected on both sides of the lower layer of the pipe gallery main body 1, providing sliding space for the frame 3, and multiple frames 3 are slidably connected between the opposite sides of the two slide rails 2 on one side, providing installation positions for other structures, multiple sliding holes 4 are opened on both sides of the frame 3, which are engaged with the limit columns 6 to adjust the height of the installation strip 7, and multiple support blocks 5 are arranged on both sides of the outside of the frame 3 to provide installation positions for the installation strip 7, and two limit columns 6 are fixedly connected to the inner side of the support block 5, which are engaged with the sliding hole 4, and the outer side of the limit column 6 is slidably connected to the inside of the sliding hole 4, and the outer side of the support block 5 away from the limit column 6 is fixedly connected with the installation strip 7 to provide pipeline laying space, and a contraction mechanism 10 is arranged in the middle of the lower layer of the pipe gallery main body 1, connecting the channel of the multi-layer integrated pipe gallery.
[0032] Reference Figure 1 and Figure 4 The retracting mechanism 10 includes a storage box 1001, the top of which is fixedly connected to the middle of the lower layer of the pipe gallery body 1, and both sides of the storage box 1001 are provided with slide grooves 1002 to provide a sliding space for a slide block 1003. A slide block 1003 is slidably connected between the two slide grooves 1002 to provide an installation space for a front support 1005 and a rear support 1006. Both sides of the slide block 1003 are fixedly connected with a limit strip 1004 to limit the position of the slide block 1003, so that the slide block 1003 is away from the storage box 100 Both ends of one side of 1 are rotatably connected with front pillars 1005 to provide installation positions for pedals 1007, and both sides of the middle part of the sliding block 1003 are rotatably connected with rear pillars 1006 to provide installation positions for pedals 1007. Multiple pedals 1007 are rotatably connected between the opposite sides of the two front pillars 1005, so that workers can go up and down in the multi-story integrated pipe gallery. The other end of the pedal 1007 is rotatably connected between the opposite sides of the two rear pillars 1006. An entrance 1008 is opened in the middle of the lower layer of the pipe gallery body 1.
[0033] Reference Figure 1 , Figure 3 and Figure 4A support column 8 is fixedly connected between the mounting bar 7 and the support block 5 to increase the load-bearing capacity of the mounting bar 7. The outer portion of the limiting column 6 is engaged with the bottom of the sliding hole 4 to fix the position of the support block 5. A plurality of limiting plates 9 are fixedly connected to the top of the mounting bar 7 to make the position of the pipeline more stable. Two limiting bars 1004 are located on the outside of both sides of the storage box 1001, and the entrance 1008 is located on the rear side of the storage box 1001. A plurality of lighting lamps 11 are arranged inside the pipe gallery body 1 to provide lighting for the interior of the pipe gallery. A plurality of load-bearing columns 12 are fixedly connected inside both sides of the pipe gallery body 1 to make the pipe gallery stronger and improve its service life. The bottom of the front support 1005 is in contact with the bottom of the lower layer of the pipe gallery body 1, and the bottom of the rear support 1006 is in contact with the bottom of the lower layer of the pipe gallery body 1. The pedal 1007 is parallel to the bottom of the lower layer of the pipe gallery body 1.
[0034] Working principle: Pulling the frame 3 to slide on the slide rail 2 can adjust the position of the frame 3, lifting the support block 5 drives the limit column 6 to slide inside the sliding hole 4 until the limit column 6 can be separated from the sliding hole 4, take out the support block 5, select a sliding hole 4 of appropriate height to insert the limit column 6, put down the support block 5, the limit column 6 slides to the bottom of the sliding hole 4, fix the support block 5, and now the pipeline can be laid on the limit plate 9; when the maintenance personnel enter the pipe gallery for maintenance, if they need to enter the upper layer, they pull out the front support column (1005) from the inside of the storage box 1001, and drive the sliding block 1003 to slide inside the slide groove 1002, Until the sliding block 1003 stops sliding, the front support 1005 is lowered to the bottom of the corridor, and the rear support 1006 also rotates, and its bottom falls to the bottom of the corridor, and the pedal 1007 between the front support 1005 and the rear support 1006 is unfolded. The staff follows the pedal 1007 and enters the upper layer through the entrance 1008. If it needs to be folded, lift the rear support 1006, which drives the pedal 1007 to rotate, and drives the front support 1005 to rotate until it is parallel to the storage box 1001. At this time, the rear support 1006 can be pushed to drive the sliding block 1003 to slide into the storage box 1001.
[0035] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A municipal multi-storey integrated pipe gallery, comprising a pipe gallery main body (1), characterized in that: Two slide rails (2) are fixedly connected to both sides of the lower layer of the pipe gallery body (1); a plurality of frames (3) are slidably connected between the opposite sides of the two slide rails (2) on one side; a plurality of sliding holes (4) are provided on both sides of the frames (3); a plurality of support blocks (5) are provided on both sides of the outside of the frames (3); two limiting columns (6) are fixedly connected to the inner side of the support blocks (5); the outside of the limiting columns (6) is slidably connected to the inside of the sliding holes (4); a mounting strip (7) is fixedly connected to the outer side of the support blocks (5) away from the limiting columns (6); and a retracting mechanism (10) is provided in the middle of the lower layer of the pipe gallery body (1).
2. A municipal public multi-storey integrated pipe gallery according to claim 1, characterized in that: The retracting mechanism (10) comprises a storage box (1001), the top of the storage box (1001) is fixedly connected to the middle of the lower layer of the pipe gallery body (1), both sides of the storage box (1001) are provided with slide grooves (1002), a slide block (1003) is slidably connected between the two slide grooves (1002), both sides of the slide block (1003) are fixedly connected to limit bars (1004), and the slide block (1003) is away from the storage box (1 The two ends of one side of the pipe gallery (1001) are rotatably connected to front pillars (1005), the two sides of the middle part of the sliding block (1003) are rotatably connected to rear pillars (1006), a plurality of pedals (1007) are rotatably connected between the opposite sides of the two front pillars (1005), the other end of the pedal (1007) is rotatably connected between the opposite sides of the two rear pillars (1006), and an entrance (1008) is opened in the middle of the lower layer of the pipe gallery body (1).
3. A municipal public multi-storey integrated pipe gallery according to claim 1, characterized in that: A support column (8) is fixedly connected between the mounting strip (7) and the support block (5), and the outside of the limiting column (6) is engaged with the bottom of the sliding hole (4).
4. A municipal multi-storey integrated pipe gallery according to claim 1, characterized in that: A plurality of limiting plates (9) are fixedly connected to the top of the installation strip (7).
5. A municipal multi-storey integrated pipe gallery according to claim 2, characterized in that: The two limit strips (1004) are located outside the two sides of the storage box (1001), and the entrance (1008) is located at the rear side of the storage box (1001).
6. A municipal multi-storey integrated pipe gallery according to claim 1, characterized in that: A plurality of lighting lamps (11) are arranged inside the pipe gallery body (1), and a plurality of load-bearing columns (12) are fixedly connected inside two sides of the pipe gallery body (1).
7. A municipal multi-storey integrated pipe gallery according to claim 2, characterized in that: The bottom of the front support (1005) contacts the bottom of the lower layer of the pipe gallery body (1), and the bottom of the rear support (1006) contacts the bottom of the lower layer of the pipe gallery body (1).
8. The municipal multi-storey integrated pipe gallery according to claim 2 is characterized by: The pedal (1007) is parallel to the bottom of the lower layer of the pipe gallery body (1).