A building climbing frame for construction engineering
By designing a building climbing frame that does not require hole punching, and using components such as columns, floor slabs, limits and other components to achieve stable installation of wall brackets, the structural damage and installation complexity caused by hole punching in the prior art are solved, and the installation efficiency and building integrity and durability are improved.
Patent Information
- Application Number
- CN202421182855.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-05-28
AI Technical Summary
The existing building climbing frame needs to be drilled when installing the wall bracket, resulting in damage to the building structure, affecting integrity and durability, and increasing the installation time and subsequent repair work.
A building climbing frame that does not require hole punching is designed, and the stable installation and fixation of the attached wall bracket is achieved through the combination of columns, floor slabs, limiting parts, connecting parts and stops.
It avoids damage to the building structure, simplifies the installation process, reduces installation time and subsequent repair work, and improves installation efficiency and building integrity and durability.
Smart Images

Figure CN222731052U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, and in particular to a building climbing frame used in construction engineering. Background Art
[0002] With the continuous development of modern construction projects, the number of high-rise buildings is increasing, which puts higher requirements on the safety and efficiency of construction. The traditional scaffolding construction method has many limitations, such as complex erection and disassembly processes, consumption of manpower and material resources, and long construction period. Against this background, building climbing frames have emerged as an innovative construction equipment. Building climbing frames can provide a stable working platform, realize overall lifting, effectively ensure the safety of construction workers, and at the same time improve construction efficiency and reduce the impact on building structures. They have important application value in the field of construction.
[0003] The climbing frames in the prior art usually require drilling holes in the wall so as to install wall brackets to fix the climbing frames; however, this drilling method will inevitably cause a certain degree of damage to the building wall, affecting the integrity and durability of the building, and may also bring potential hazards to the subsequent use of the building. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a building climbing frame for use in construction projects, which solves the problem that when installing the wall-mounted bracket on the climbing frame, it is necessary to first punch holes in the wall, thereby affecting the integrity of the building. At the same time, the cumbersome punching and installation method will increase its installation time, and the drilled holes will also need to be repaired later.
[0005] Technical solution: To achieve the above objectives, the present invention is implemented through the following technical solution: a building climbing frame used in construction projects, comprising: a column, which is provided with multiple columns and the columns are the main supporting structure of the building; a floor slab, which is located on the columns and is a horizontal structural member that separates the upper and lower spaces of the building; a limiter, which is located on the floor slab and is on one side of the columns; a connector, which must be made of high-strength materials, such as steel; a connector, which is provided with multiple components and is located on one side of the floor slab, i.e., the other side of the columns, and the connector is connected to the other end of the connector; a baffle, which is located below the floor slab and is connected to the connector.
[0006] In a further embodiment, when selecting the wall-mounted bracket and the climbing frame body, the specifications and models thereof can be selected according to actual needs.
[0007] In a further embodiment, the main function of the fixing member is to prevent the connecting member from being separated from the connecting portion; and the main function of the bolt is to prevent the fixing member from being separated from the connecting member.
[0008] In a further embodiment, one side of the connecting member is in contact with the column, and the length of the connecting member is matched with the distance between the connecting portion and the limiting member.
[0009] In a further embodiment, the distance between the blocking member and the connecting member is adapted to the thickness of the floor slab.
[0010] In a further embodiment, the length of the limiting member exceeds the distance between two adjacent columns.
[0011] In a further embodiment, the height of the fixing member exceeds the thickness of the connecting member.
[0012] Beneficial effects: 1. The non-perforated design avoids damage to the columns and walls, maintaining the integrity of the main structure; this is of great significance to the long-term use and durability of the building. At the same time, reducing damage to the main structure of the building also reduces the safety hazards caused by structural damage, further ensuring the life safety of construction workers and the quality safety of the building.
[0013] 2. Compared with the traditional installation method that requires drilling holes on the wall, this design does not require complicated drilling operations, reducing the installation process and time; you only need to connect the crossbar to the wall bracket through the connector, and match the block with the floor to complete the installation. This not only improves the installation efficiency, but also reduces the difficulty of installation, making the installation process more convenient and conducive to speeding up the construction progress. At the same time, this design also reduces the subsequent repair work that may be caused by drilling, saving manpower and material resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0015] Figure 1 It is a structural schematic diagram of the utility model.
[0016] Figure 2 for Figure 1 Schematic diagram of the main cross-section structure.
[0017] Figure 3 for Figure 1 Schematic diagram of the side section structure.
[0018] Figure 4 for Figure 2 The structural block diagram at A.
[0019] The reference numerals in the figure are: 1. column; 2. floor; 3. limit piece; 4. connecting piece; 5. wall bracket; 6. climbing frame body; 7. connecting part; 8. stopper; 9. fixing piece; 10. bolt. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the practical embodiment clearer, the technical solution in the practical embodiment is clearly and completely described. Obviously, the described embodiment is a part of the practical embodiment, not all of the embodiments. Based on the embodiments in this practical, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this practical.
[0021] The embodiment of the present application provides a building climbing frame for construction engineering, which solves the problem that when installing a wall-mounted bracket, it is necessary to punch holes in the wall, thereby affecting the integrity of the building, and the cumbersome hole-punching installation method will increase the time cost, and the holes need to be repaired later. In actual use, the wall-mounted bracket can be installed without punching holes, and the installation method without punching holes not only saves installation time, but also saves manpower and material resources for subsequent hole repair.
[0022] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0023] Reference Figure 1-4 A building climbing frame for construction engineering, comprising: a column 1, which is provided in plurality and the column 1 is the main supporting structure of the building; a floor 2, which is located on the column 1 and is a horizontal structural member that separates the upper and lower spaces of the building; a limiter 3, which is located on the floor 2 and is on one side of the column 1; a plurality of connectors 4, and one end of the connector 4 is connected to the limiter 3; a plurality of connectors 7, which are provided and are located on one side of the floor 2, i.e., the other side of the column 1, and the connector 7 is connected to the other end of the connector 4; a stopper 8, which is located below the floor 2 and is connected to the connector 7.
[0024] Through the cooperation among the limiting member 3, the connecting member 4, the connecting portion 7 and the blocking member 8, the building climbing frame can be installed and fixed without drilling holes in the building.
[0025] There are multiple wall-mounted brackets 5 , and the wall-mounted brackets 5 are located on the connecting portion 7 ; the climbing frame body 6 is located on the wall-mounted brackets 5 .
[0026] By cooperating with the wall-mounted bracket 5 and the climbing frame, the lifting and moving of high-rise building construction can be realized, a safe and stable working platform can be provided, construction safety can be ensured, complex building structures can be adapted, construction efficiency can be improved, and material transportation can be facilitated.
[0027] The fixing member 9 is located at the other end of the connecting member 4 and is used to connect the connecting member 4 and the connecting portion 7 . A plurality of bolts 10 are provided and the bolts 10 are located on the connecting member 4 and are used to fix the fixing member 9 .
[0028] Through the cooperation between the fixing member 9 and the bolt 10 , the connecting member 4 can be connected to the connecting portion 7 , and the provision of the fixing member 9 can prevent the bolt 10 from being directly subjected to force.
[0029] One side of the connecting member 4 is in contact with the column 1 , and the length of the connecting member 4 is adapted to the distance between the connecting portion 7 and the limiting member 3 .
[0030] The length of the connecting member 4 is matched to the distance between the connecting portion 7 and the limiting member 3 , so as to ensure the connection strength and stability of the connecting member 4 .
[0031] The distance between the stopper 8 and the connecting member 4 is adapted to the thickness of the floor slab 2 .
[0032] It can ensure that the connection part 7 can be stuck between the floor slabs 2 to avoid displacement of the connection part 7 when the climbing frame moves upward.
[0033] The length of the limiting member 3 exceeds the distance between two adjacent columns 1 .
[0034] The limiting function of the limiting member 3 on the connecting member 4 can be ensured.
[0035] The height of the fixing member 9 exceeds the thickness of the connecting member 4 .
[0036] The connection strength and stability of the fixing member 9 can be ensured, and the connecting member 4 can be prevented from being separated from the connecting portion 7 .
[0037] During use, first, place the limit piece 3 on the floor 2 and make it located on one side of the adjacent column 1, then select a suitable connecting piece 4, and connect one end of the connecting piece 4 to the limit piece 3, and one side of the connecting piece 4 needs to be in contact with the column 1; then, place the connecting part 7 on the other side of the floor 2, and connect the other end of the connecting piece 4 to the connecting part 7; then place the stopper 8 under the floor 2 and connect it to the connecting part 7, use the fixing piece 9 and the bolt 10 to fix the connecting piece 4 to the connecting part 7, and the distance between the stopper 8 and the connecting piece 4 should be adapted to the thickness of the floor 2; then, install the wall-mounted bracket 5 on the connecting part 7, and finally connect the climbing frame body 6 to the wall-mounted bracket 5.
[0038] Among them, the structures such as the lifting equipment and anti-falling devices required on the building climbing frame are all existing technologies and are non-essential technical features in this application, so they are not described or drawn in this document and the drawings.
[0039] In summary, compared with the prior art, the present invention has the following beneficial effects: it effectively avoids many problems caused by drilling holes in the wall, such as damage to the wall structure and increased construction difficulty; at the same time, through the ingenious connection of the cross bar, the connector and the wall-mounted bracket, and the cooperation of the connector and the block, the stability and firmness of the wall-mounted bracket are greatly enhanced, making it less likely to move and shake, thereby ensuring the safety of construction; in addition, this design also simplifies the installation process, improves installation efficiency, and reduces the consumption of manpower and material resources; and it plays a better protective role on the main structure, maintaining the integrity and durability of the building.
[0040] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0041] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A building climbing frame for construction engineering, characterized in that: include: A plurality of columns (1) are provided, and the columns (1) are the main supporting structure of the building; The floor slab (2), located on the column (1), is a horizontal structural member that separates the upper and lower floors of the building; A limiting member (3) is located on the floor slab (2) and on one side of the column (1); A plurality of connecting members (4) are provided, and one end of the connecting member (4) is connected to the limiting member (3); A plurality of connecting parts (7) are provided, and are located on one side of the floor slab (2), i.e., the other side of the column (1), and the connecting part (7) is connected to the other end of the connecting member (4); The blocking member (8) is located below the floor slab (2), and the blocking member (8) is connected to the connecting portion (7).
2. A construction climbing frame for construction engineering according to claim 1, characterized in that: Also includes: A plurality of wall-mounted brackets (5) are provided, and the wall-mounted brackets (5) are located on the connecting portion (7); The climbing frame body (6) is located on the wall-mounted bracket (5).
3. The construction climbing frame for construction engineering according to claim 1, characterized in that: Also includes: A fixing member (9), located at the other end of the connecting member (4), and used to connect the connecting member (4) and the connecting portion (7); A plurality of bolts (10) are provided, and the bolts (10) are located on the connecting member (4) and are used to fix the fixing member (9).
4. The construction climbing frame for construction engineering according to claim 1, characterized in that: One side of the connecting member (4) is in contact with the column (1), and the length of the connecting member (4) is adapted to the distance between the connecting portion (7) and the limiting member (3).
5. The construction climbing frame for construction engineering according to claim 1, characterized in that: The distance between the stopper (8) and the connecting member (4) is adapted to the thickness of the floor slab (2).
6. The construction climbing frame for construction engineering according to claim 1, characterized in that: The length of the limiting member (3) exceeds the distance between two adjacent columns (1).
7. The construction climbing frame for construction engineering according to claim 3, characterized in that: The height of the fixing member (9) exceeds the thickness of the connecting member (4).