A buried pipeline leakage protection structure
By designing a buried pipeline with a multi-layer structure and setting up a leak protection structure with collapse holes and collapse grooves on the support frame, the problems of damage and leakage of buried pipelines after impact are solved, and higher corrosion resistance, structural strength and sealing effects are achieved.
Patent Information
- Application Number
- CN202420895655.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-04-28
AI Technical Summary
Existing buried pipes are prone to damage after being impacted, resulting in internal liquid leakage and contaminating the surrounding environment.
A buried pipeline leakage protection structure is designed, using a multi-layer structure of the pipeline body, and a collapse hole and collapse groove are installed on the support frame to buffer and absorb impact forces when impacted to prevent pipeline damage.
It effectively avoids damage to buried pipes after impact, prevents liquid leakage and environmental pollution, and improves the corrosion resistance, structural strength, wear resistance and sealing effect of the pipes.
Smart Images

Figure CN222732270U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of buried pipelines, in particular to a buried pipeline leakage protection structure. Background Art
[0002] With the popularity of buried pipelines, ensuring the smooth, safe and efficient operation of buried pipelines has become a long-term and important task. Under normal conditions, the buried pipeline of decarbonization and desulfurization absorbent is a fully closed system. The decarbonization and desulfurization absorbent will not come into contact with the soil and groundwater, and the decarbonization and desulfurization absorbent will not affect the soil and groundwater environment. Only under accident conditions, the leakage of decarbonization and desulfurization absorbent may cause pollution to the soil and groundwater environment along the line. The amount of decarbonization and desulfurization absorbent leaked underground due to pipeline leakage accidents is limited. If it is handled promptly and properly, the impact on the surrounding environment can be effectively controlled.
[0003] However, existing buried pipelines will be damaged after being impacted, causing the liquid inside to leak and pollute the surrounding environment. Utility Model Content
[0004] The purpose of the utility model is to solve at least one of the technical problems existing in the prior art, and to provide a buried pipeline leakage protection structure, wherein the device is provided with a support frame, and the support frame can buffer the buried pipeline body after being impacted by the collapse hole and the collapse groove, and absorb the impact force, thereby effectively avoiding the damage of the buried pipeline after being impacted, and effectively preventing the pollution of the surrounding soil by pipeline leakage;
[0005] The device is provided with a buried pipeline body, which is made of a multi-layer structure, and can effectively improve the corrosion resistance, structural strength, wear resistance and sealing effect of the pipeline, thereby improving the performance of the device.
[0006] The utility model also provides a buried pipeline leakage protection structure as described above, comprising: a geomembrane base frame, the upper side wall of the geomembrane base frame is installed with a plurality of support base frames, the upper side wall of the support base frame is fixedly connected with a support plate, the upper end of the support plate is fixedly connected with a support bracket, and the upper side wall of the support bracket is movably connected with a buried pipeline body;
[0007] The innermost layer of the buried pipeline body is set as a corrosion-resistant inner layer, the outer wall of the corrosion-resistant inner layer is fixedly connected with a sealing layer, the outer wall of the sealing layer is fixedly connected with a reinforcement layer, the outer wall of the reinforcement layer is fixedly connected with a wear-resistant outer layer, the support plate is provided with a collapse hole inside, and the left wall and the right wall of the support plate are both provided with collapse grooves.
[0008] According to the buried pipeline leakage protection structure, the upper side wall of the geomembrane base frame is paved with a geomembrane, and the upper side wall of the geomembrane base frame is fixedly connected with a low frame extension end.
[0009] According to the buried pipeline leakage protection structure, the interior of the geomembrane base frame and near the lower side is filled with a lower sand cushion layer, and the interior of the geomembrane base frame and near the upper side is filled with an upper sand cushion layer. The upper sand cushion layer and the lower sand cushion layer can effectively alleviate the leakage of the buried pipeline body.
[0010] According to the buried pipeline leakage protection structure, the support bracket cooperates with the outer side wall of the buried pipeline body to improve the stability of the support bracket.
[0011] According to the buried pipeline leakage protection structure, the wear-resistant outer layer is made of ceramic composite material to improve the wear-resistant effect of the wear-resistant outer layer.
[0012] According to the buried pipeline leakage protection structure, the reinforcement layer is made of a steel-plastic composite material to improve the structural strength of the buried pipeline body.
[0013] According to the buried pipeline leakage protection structure, the sealing layer is made of high-density polyethylene material, which improves the sealing effect of the buried pipeline body and can effectively prevent pipeline leakage.
[0014] According to the buried pipeline leakage protection structure, the corrosion-resistant inner layer is made of glass fiber reinforced plastic material to improve the corrosion resistance of the corrosion-resistant inner layer.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0017] Figure 1 This is a structural schematic diagram of a buried pipeline leakage protection structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the buried pipeline main body of a buried pipeline leakage protection structure of the utility model;
[0019] Figure 3 It is a top view schematic diagram of a buried pipeline leakage protection structure of the utility model;
[0020] Figure 4 It is a schematic diagram of a buried pipeline leakage protection structure after filling according to the utility model.
[0021] Legend:
[0022] 1. Geomembrane base frame; 101. Base plate extension end; 2. Support base frame; 201. Support plate; 202. Collapse hole; 203. Collapse groove; 204. Support bracket; 3. Buried pipeline body; 301. Corrosion-resistant inner layer; 302. Sealing layer; 303. Reinforcement layer; 304. Wear-resistant outer layer; 4. Lower sand cushion layer; 5. Upper sand cushion layer. DETAILED DESCRIPTION
[0023] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0024] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0025] Reference Figure 1-4 The utility model embodiment is a buried pipeline leakage protection structure, which includes: a geomembrane frame 1, the upper side wall of the geomembrane frame 1 is paved with geomembrane, the upper side wall of the geomembrane frame 1 is fixedly connected with a low frame extension end 101, the interior of the geomembrane frame 1 and near the lower side is filled with a lower sand cushion layer 4, the interior of the geomembrane frame 1 and near the upper side is filled with an upper sand cushion layer 5, the upper sand cushion layer 5 and the lower sand cushion layer 4 can effectively alleviate the leakage of the buried pipeline body 3.
[0026] A plurality of support base frames 2 are installed on the upper side wall of the geomembrane base frame 1, and a support plate 201 is fixedly connected to the upper side wall of the support base frame 2. A support bracket 204 is fixedly connected to the upper end of the support plate 201, and a buried pipe body 3 is movably connected to the upper side wall of the support bracket 204. The support bracket 204 cooperates with the outer side wall of the buried pipe body 3 to improve the stability of the support of the support bracket 204.
[0027] The innermost layer of the buried pipeline body 3 is set as a corrosion-resistant inner layer 301, the outer wall of the corrosion-resistant inner layer 301 is fixedly connected with a sealing layer 302, the outer wall of the sealing layer 302 is fixedly connected with a reinforcement layer 303, the outer wall of the reinforcement layer 303 is fixedly connected with a wear-resistant outer layer 304, the wear-resistant outer layer 304 is made of a ceramic composite material to improve the wear resistance of the wear-resistant outer layer 304, the reinforcement layer 303 is made of a steel-plastic composite material to improve the structural strength of the buried pipeline body 3, the sealing layer 302 is made of a high-density polyethylene material to improve the sealing effect of the buried pipeline body 3, and can effectively prevent pipeline leakage, and the corrosion-resistant inner layer 301 is made of a glass fiber reinforced plastic material to improve the corrosion resistance of the corrosion-resistant inner layer 301.
[0028] A collapse hole 202 is disposed inside the support plate 201 , and collapse grooves 203 are disposed on the left side wall and the right side wall of the support plate 201 .
[0029] Working principle: When laying the pipeline, first, fix the support base 2 on the support frame 2, then place the buried pipeline body 3 on the support support 204, then lay the lower sand cushion layer 4 to the bottom of the geomembrane frame 1, and finally, lay the upper sand cushion layer 5 on the upper side wall of the lower sand cushion layer 4.
[0030] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A buried pipeline leakage protection structure, characterized in that: include: A geomembrane base frame (1), wherein a plurality of support base frames (2) are installed on the upper side wall of the geomembrane base frame (1), a support plate (201) is fixedly connected to the upper side wall of the support base frame (2), a support bracket (204) is fixedly connected to the upper end of the support plate (201), and a buried pipeline body (3) is movably connected to the upper side wall of the support bracket (204); The innermost layer of the buried pipeline body (3) is set as a corrosion-resistant inner layer (301), the outer wall of the corrosion-resistant inner layer (301) is fixedly connected with a sealing layer (302), the outer wall of the sealing layer (302) is fixedly connected with a reinforcement layer (303), and the outer wall of the reinforcement layer (303) is fixedly connected with a wear-resistant outer layer (304), the support plate (201) is provided with a collapse hole (202) inside, and the left side wall and the right side wall of the support plate (201) are both provided with a collapse groove (203).
2. A buried pipeline leakage protection structure according to claim 1, characterized in that: The upper side wall of the geomembrane base frame (1) is paved with a geomembrane, and the upper side wall of the geomembrane base frame (1) is fixedly connected to a low frame extension end (101).
3. The buried pipeline leakage protection structure according to claim 1, characterized in that: The interior of the geomembrane base frame (1) and close to the lower side is filled with a lower sand cushion layer (4), and the interior of the geomembrane base frame (1) and close to the upper side is filled with an upper sand cushion layer (5).
4. The buried pipeline leakage protection structure according to claim 1, characterized in that: The support bracket (204) cooperates with the outer side wall of the buried pipeline body (3).
5. The buried pipeline leakage protection structure according to claim 1, characterized in that: The wear-resistant outer layer (304) is made of ceramic composite material.
6. The buried pipeline leakage protection structure according to claim 1, characterized in that: The reinforcement layer (303) is made of a steel-plastic composite material.
7. The buried pipeline leakage protection structure according to claim 1, characterized in that: The sealing layer (302) is made of high-density polyethylene material.
8. The buried pipeline leakage protection structure according to claim 1, characterized in that: The corrosion-resistant inner layer (301) is made of glass fiber reinforced plastic material.