A piling device for construction engineering

By designing a pile driving device including base, support plate, motor, transfer plate and placement box, the problems of difficulty in replacing and adjusting pile hammers and inconvenient equipment transportation in the prior art are solved, and the pile hammers are quickly replaced and adjusted, adapted to the construction of pile holes of different diameters, and improved the pile driving efficiency and effect.

CN222745027UActive Publication Date: 2025-04-11GUANGXI POLYTECHNIC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421556898.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2025-04-11
Estimated Expiration
2034-07-03

AI Technical Summary

Technical Problem

The existing pile driving devices cannot quickly replace pile hammers, especially when constructing pile holes with larger diameters, and the equipment is large in size and inconvenient to transport.

Method used

A pile driving device including a base, support plate, motor, transfer plate, connecting block and placing box is designed. The base is fixed and transported by driving screws and grounding rods. The motor drives the rotation of the rotating plate and connecting blocks, and the reciprocating movement of the sliding rod and the placing box, so as to realize the reciprocating hammer and replacement of the pile hammer.

Benefits of technology

It realizes rapid replacement and adjustment of pile hammers, adapts to pile hole construction of different diameters, and the equipment can be lifted and transported, solving the problem of transportation inconvenience and improving pile driving efficiency and effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222745027U_ABST
    Figure CN222745027U_ABST
Patent Text Reader

Abstract

The utility model discloses a piling device for construction engineering, comprising a base, the bottom of the base is fixedly connected with two support plates, the top of the base is fixedly connected with a mounting plate, one side of the mounting plate is penetrated and fixedly embedded with a motor, a first rotating plate is fixedly sleeved on the output shaft of the motor, the first rotating plate is rotatably connected to the second rotating plate on the side away from the motor, the second rotating plate is rotatably connected to the side away from the first rotating plate with a connecting block, and the connecting block is fixedly connected to a placement box on the side away from the second rotating plate. The utility model is simple to use, and rotating a driving screw can drive multiple grounding rods to descend and penetrate into the soil to fix the support plates, and the base can be lifted for transportation by two hanging rings, and starting the motor can drive the sliding rod and the pile hammer body to reciprocate and hammer the soil to drive piles, and the pile hammer body can be removed by rotating the pile hammer body for replacement, and heavy objects can be put into the placement box to increase the pressure on the pile hammer body to achieve a better pile driving effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of pile driving devices, in particular to a pile driving device for construction engineering. Background Art

[0002] A pile driver consists of a pile hammer, a pile frame and ancillary equipment.

[0003] The utility model with the authorization announcement number: CN217811002U discloses a construction engineering piling device, including a mobile warehouse, a hoisting mechanism, a cable, a second support roller, a first support roller, an adjustment component, a pile body and a vertical plate, wherein the vertical plate is arranged on the top of the mobile warehouse, the hoisting mechanism is arranged on the top of the mobile warehouse, the second support roller is arranged on the upper end of the side of the vertical plate close to the hoisting mechanism, the first support roller is arranged on the upper end of the side of the vertical plate away from the hoisting mechanism, one end of the cable is wound around the hoisting mechanism, the other end of the cable bypasses the second support roller and is arranged below the support roller, the pile body is arranged under the cable, and the adjustment component passes through the middle of the vertical plate and is arranged on the side of the cable. The utility model belongs to the technical field of construction machinery, and specifically refers to a construction engineering piling device.

[0004] The above-mentioned utility model device cannot replace the pile hammer, and cannot make adjustments when constructing pile holes with larger diameters. Moreover, the equipment must be replaced when making adjustments. Also, since the pile driver is large in size, it is also inconvenient to transport. Therefore, those skilled in the art provide a construction engineering piling device to solve the problems raised in the above-mentioned background technology. Utility Model Content

[0005] The purpose of the utility model is to provide a construction engineering piling device to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering piling device comprises a base, the bottom of the base is fixedly connected to two support plates, the top of the base is fixedly connected to a mounting plate, one side of the mounting plate is penetrated and fixedly embedded with a motor, a first rotating plate is fixedly sleeved on the output shaft of the motor, the first rotating plate is rotatably connected to a second rotating plate on a side away from the motor, the second rotating plate is rotatably connected to a connecting block on a side away from the first rotating plate, a placement box is fixedly connected to a side of the connecting block away from the second rotating plate, a sliding rod that penetrates the base is fixedly connected to the bottom of the placement box, a pile hammer body is threadedly installed on the bottom of the sliding rod, and a fixing component for stabilizing the support plate is provided at the bottom of the base.

[0007] As a further solution of the utility model: the fixing assembly includes a driving screw rotatably connected to the bottom of the base, a connecting frame is threadedly sleeved on the outer wall of the driving screw, a plurality of sliding holes are arranged in a transverse array on one side of the two support plates, and a plurality of sliding holes are respectively penetrated on two sides of the connecting frame away from each other, two rows of grounding rods are arranged in a transverse array at the bottom of the connecting frame, and a plurality of reserved holes are arranged in a transverse array on the top of the two support plates, and each grounding rod corresponds to each reserved hole.

[0008] As a further solution of the utility model: a mounting screw hole is provided at the bottom end of the sliding rod, a fixing screw is fixedly connected to the top of the pile hammer body, and the fixing screw is threadedly connected to the mounting screw hole.

[0009] As a further solution of the utility model: a sealing cover is sealed on the top of the storage box, and the sealing cover is located on one side of the second rotating plate.

[0010] As a further solution of the utility model: both sides of the base are fixedly connected with hanging rings, and the hanging rings are located just above the supporting plate.

[0011] As a further solution of the utility model: a mounting hole is opened on one side of the mounting plate, and the motor is fixedly embedded in the mounting hole.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. Place the base in the construction area, and rotate the driving screw to drive the connecting frame to descend. After the connecting frame descends, it will drive multiple grounding rods to descend. After the multiple grounding rods descend, they can pass through the reserved holes to reach the bottom of the support plate and penetrate into the soil. After the multiple reserved holes penetrate into the soil, the two support plates can be fixed. After the two hanging rings are inserted into the hooks, the base can be lifted for transportation. When the motor is started, the first rotating plate can be driven to rotate. After the first rotating plate rotates, the second rotating plate can be driven to rotate. When the second rotating plate rotates, the connecting block and the placement box can be pulled up for reciprocating movement. The reciprocating movement of the placement box can drive the sliding rod to reciprocate at the same time. The reciprocating movement of the sliding rod can drive the pile hammer body to reciprocate and hammer the soil for piling. Rotating the pile hammer body can drive the fixed screw to rotate and move out of the installation screw hole for disassembly and replacement. Pick up the sealing cover to open the opening of the placement box. Heavy objects can be put into the placement box to increase the weight of the sliding rod. After the weight of the sliding rod is increased, the pressure of the pile hammer body will be increased to make the piling effect better.

[0014] The utility model is easy to use. By rotating the driving screw rod, multiple grounding rods can be driven to descend and penetrate into the soil to fix the support plate. The base can be lifted for transportation through two hanging rings. Starting the motor can drive the sliding rod and the pile hammer body to reciprocate and hammer the soil to drive the pile. The pile hammer body can be removed and replaced by rotating it. Heavy objects can be placed in the placement box to increase the pressure on the pile hammer body to achieve a better pile driving effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a first explosion three-dimensional schematic diagram of the utility model;

[0016] Figure 2 It is a second explosion three-dimensional schematic diagram of the utility model;

[0017] Figure 3 It is a three-dimensional schematic diagram of the utility model.

[0018] In the figure: 1. base; 2. support plate; 3. connecting frame; 4. sliding hole; 5. pile hammer body; 6. grounding rod; 7. reserved hole; 8. hanging ring; 9. sliding rod; 10. placement box; 11. connecting block; 12. sealing cover; 13. first rotating plate; 14. second rotating plate; 15. motor; 16. mounting plate; 17. fixing screw; 18. mounting screw hole; 19. driving screw. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0020] See also Figures 1 to 3In the embodiment of the utility model, a construction engineering piling device includes a base 1, the bottom of the base 1 is fixedly connected to two support plates 2, the top of the base 1 is fixedly connected to a mounting plate 16, a motor 15 is fixedly embedded through one side of the mounting plate 16, a first rotating plate 13 is fixedly sleeved on the output shaft of the motor 15, a side of the first rotating plate 13 away from the motor 15 is rotatably connected to a second rotating plate 14, a side of the second rotating plate 14 away from the first rotating plate 13 is rotatably connected to a connecting block 11, and a side of the connecting block 11 away from the second rotating plate 14 is fixedly connected to a placement box 10, The bottom of the placement box 10 is fixedly connected with a sliding rod 9 that passes through the base 1. The bottom of the sliding rod 9 is threadedly installed with a pile hammer body 5. The bottom of the base 1 is provided with a fixing component for stabilizing the support plate 2. When the motor 15 is started, the first rotating plate 13 can be driven to rotate. After the first rotating plate 13 rotates, the second rotating plate 14 can be driven to rotate. When the second rotating plate 14 rotates, the connecting block 11 and the placement box 10 can be pulled up to reciprocate. The reciprocating movement of the placement box 10 can drive the sliding rod 9 to reciprocate at the same time. The reciprocating movement of the sliding rod 9 can drive the pile hammer body 5 to reciprocate and hammer the soil for piling.

[0021] In this embodiment, the fixing assembly includes a driving screw 19 rotatably connected to the bottom of the base 1, and a connecting frame 3 is threadedly sleeved on the outer wall of the driving screw 19. A plurality of sliding holes 4 are arranged in a transverse array on one side of the two support plates 2, and a plurality of sliding holes 4 are respectively penetrated on both sides of the connecting frame 3 away from each other. Two rows of grounding rods 6 are arranged in a transverse array at the bottom of the connecting frame 3, and a plurality of reserved holes 7 are arranged in a transverse array on the tops of the two support plates 2, and each grounding rod 6 corresponds to each reserved hole 7. The base 1 is placed in the construction area, and the driving screw 19 can be rotated to drive the connecting frame 3 to descend. After the connecting frame 3 descends, it will drive the plurality of grounding rods 6 to descend. After the plurality of grounding rods 6 descend, they can pass through the reserved holes 7 to reach the bottom of the support plate 2 and penetrate into the soil. After the plurality of reserved holes 7 penetrate into the soil, the two support plates 2 can be fixed.

[0022] In this embodiment, a mounting screw hole 18 is provided at the bottom end of the sliding rod 9, and a fixing screw 17 is fixedly connected to the top of the pile hammer body 5, and the fixing screw 17 is threadedly connected to the mounting screw hole 18. Rotating the pile hammer body 5 can drive the fixing screw 17 to rotate and move out of the mounting screw hole 18 for disassembly and replacement.

[0023] In this embodiment, a sealing cover 12 is sealed on the top of the placement box 10, and the sealing cover 12 is located on one side of the second rotating plate 14. The sealing cover 12 can be lifted to open the opening of the placement box 10, and heavy objects can be placed in the placement box 10 to increase the weight of the sliding rod 9. After the sliding rod 9 is increased in weight, the pressure on the pile hammer body 5 will be increased to achieve a better piling effect.

[0024] In this embodiment, both sides of the base 1 are fixedly connected with hanging rings 8, and the hanging rings 8 are located directly above the support plate 2. After the two hanging rings 8 are inserted into the hooks, the base 1 can be lifted for transportation.

[0025] In this embodiment, a mounting hole is formed on one side of the mounting plate 16, and the motor 15 is fixedly embedded in the mounting hole.

[0026] The working principle of the utility model is as follows: the base 1 is placed in the construction area, and the driving screw 19 is rotated to drive the connecting frame 3 to descend. After the connecting frame 3 descends, it will drive multiple grounding rods 6 to descend. After the multiple grounding rods 6 descend, they can pass through the reserved holes 7 to reach the bottom of the support plate 2 and penetrate into the soil. After the multiple reserved holes 7 penetrate into the soil, the two support plates 2 can be fixed. After the two hanging rings 8 are inserted into the hooks, the base 1 can be lifted for transportation. When the motor 15 is started, the first rotating plate 13 can be driven to rotate. After the first rotating plate 13 rotates, the second rotating plate 14 can be driven to rotate. When the rotating plate 14 rotates, the connecting block 11 and the placement box 10 can be pulled up to reciprocate. The reciprocating movement of the placement box 10 can drive the sliding rod 9 to reciprocate at the same time. The reciprocating movement of the sliding rod 9 can drive the pile hammer body 5 to reciprocate and hammer the soil to perform piling. Rotating the pile hammer body 5 can drive the fixing screw 17 to rotate and move out of the mounting screw hole 18 for disassembly and replacement. The sealing cover 12 can be picked up to open the opening of the placement box 10. Heavy objects can be placed in the placement box 10 to increase the weight of the sliding rod 9. After the weight of the sliding rod 9 is increased, the pressure of the pile hammer body 5 will be increased to achieve a better piling effect.

[0027] However, as is well known to those skilled in the art, the working principle and wiring method of the motor 15 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art may make any selections according to their needs or convenience.

[0028] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction engineering piling device, comprising a base (1), characterized in that: The bottom of the base (1) is fixedly connected to two support plates (2), the top of the base (1) is fixedly connected to a mounting plate (16), one side of the mounting plate (16) is penetrated and fixedly embedded with a motor (15), a first rotating plate (13) is fixedly sleeved on the output shaft of the motor (15), a side of the first rotating plate (13) away from the motor (15) is rotatably connected to a second rotating plate (14), a side of the second rotating plate (14) away from the first rotating plate (13) is rotatably connected to a connecting block (11), a side of the connecting block (11) away from the second rotating plate (14) is fixedly connected to a placement box (10), a sliding rod (9) penetrating the base (1) is fixedly connected to the bottom of the placement box (10), a pile hammer body (5) is threadedly installed on the bottom of the sliding rod (9), and a fixing component for stabilizing the support plate (2) is provided at the bottom of the base (1).

2. A construction engineering piling device according to claim 1, characterized in that: The fixing assembly comprises a driving screw (19) rotatably connected to the bottom of the base (1); a connecting frame (3) is threadedly sleeved on the outer wall of the driving screw (19); a plurality of sliding holes (4) are arranged in a transverse array on one side of the two support plates (2); the plurality of sliding holes (4) are respectively penetrated on two sides of the connecting frame (3) away from each other; two rows of grounding rods (6) are arranged in a transverse array at the bottom of the connecting frame (3); a plurality of reserved holes (7) are arranged in a transverse array on the tops of the two support plates (2), and each grounding rod (6) corresponds to each reserved hole (7).

3. A construction engineering piling device according to claim 1, characterized in that: A mounting screw hole (18) is provided at the bottom end of the sliding rod (9), a fixing screw rod (17) is fixedly connected to the top of the pile hammer body (5), and the fixing screw rod (17) is threadedly connected to the mounting screw hole (18).

4. A construction engineering piling device according to claim 1, characterized in that: The top of the placement box (10) is sealed with a sealing cover (12), and the sealing cover (12) is located on one side of the second rotating plate (14).

5. A construction engineering piling device according to claim 1, characterized in that: Both sides of the base (1) are fixedly connected with hanging rings (8), and the hanging rings (8) are located directly above the support plate (2).

6. A construction engineering piling device according to claim 1, characterized in that: A mounting hole is provided on one side of the mounting plate (16), and the motor (15) is fixedly embedded in the mounting hole.

Citation Information

Patent Citations

  • Piling device for constructional engineering

    CN217811002U