A building structure for achieving same-floor drainage of integrated bathrooms
By designing a building structure that includes an integral bathroom base and a shared drainage pipe, the problem of difficulty in implementing the existing drainage structure on the same floor is solved, the demand for drainage on the same floor is achieved, and the construction process is simplified.
Patent Information
- Application Number
- CN202421176666.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-05-28
AI Technical Summary
The existing drainage building structure on the same floor needs to significantly change the local structure of the floor during the construction process, which makes it difficult to construct and cannot effectively resolve disputes between adjacent floors.
Design a building structure with the same drainage on the same floor of the bathroom, including a floor slab and a pipe well. The floor slab consists of the original structural layer, a mortar covering layer and a surface material layer. A shared drainage pipe is provided in the pipe well. The overall bathroom base is directly installed on the original structural layer. The drainage components are connected to the base and the drainage pipe to achieve the same layer drainage.
The integrated bathroom drainage on the same floor is realized, the construction process is simplified, the construction process is avoided, the significant changes in the local structure of the floor slabs are solved, the existing drainage structures are implemented on the same floor, and a flat bathroom space is provided.
Smart Images

Figure CN222745205U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to same-floor drainage buildings, in particular to a building structure that realizes same-floor drainage of integral bathrooms. Background Art
[0002] Same-floor drainage is designed to solve the problem that the drainage design of existing building structures is prone to cause disputes between adjacent floors. The so-called same-floor drainage means that the drainage design is not implemented across floors, but the drainage design required for the floor is completed within the same floor space.
[0003] There are two main types of drainage on the same floor: the lowering type and the raising type. The lowering type is to make the floor slab concave to form a space where the bathroom space is expected to be formed, and provide drainage pipes to be set in it. The raising type is just the opposite of the lowering type. The raising type is to directly lay pipes at the location where the bathroom space is expected to be formed, and then cover it with mud to form a convex platform.
[0004] Regardless of the difficulty of the aforementioned lowering or raising floor type, both require a significant change in the local structure of the floor slab, and there is room for improvement. Utility Model Content
[0005] The main purpose of the utility model is to solve the problems derived from the existing same-floor drainage building structure.
[0006] In order to achieve the above object, the utility model is implemented through the following technical solutions:
[0007] A building structure for achieving same-floor drainage of an integrated bathroom, the building structure comprising a floor slab and a pipe well, the floor slab comprising an original structural layer, a mortar covering layer located above the original structural layer, and a surface material layer located above the mortar covering layer, at least one common drainage pipe is arranged in the pipe well. The building structure comprises an integrated bathroom base and the bathroom wall panels arranged on the integrated bathroom base, the integrated bathroom base is directly arranged on the original structural layer, the integrated bathroom base is roughly flush with the surface material layer, the floor slab has a drainage component buried in the original structural layer and connected to the integrated bathroom base and the common drainage pipe respectively, the bathroom wall panels facing the pipe well have a wall outlet, the wall outlet provides a wall drainage pipe connected to the common drainage pipe for passing.
[0008] In one embodiment, the floor slab comprises at least one functional layer between the mortar cover layer and the surface material layer.
[0009] In one embodiment, the drainage component includes a water drop head and a drainage pipe connected to the water drop head.
[0010] In one embodiment, the wall drain pipe is connected to a toilet, and the toilet is disposed on one of the integral bathroom base or the bathroom wall panels on which the wall drain ports are opened.
[0011] According to the above utility model, compared with the prior art, the utility model has the following characteristics: the utility model building structure realizes same-floor drainage with an integrated bathroom, solving the problems of the existing same-floor drainage structure. In addition, the integrated bathroom base of the utility model is roughly flush with the surface material layer of the floor, so that the residents will not feel uneven when entering the bathroom space. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a structural schematic diagram of an embodiment of the building structure of the utility model;
[0013] Figure 2 It is a structural schematic diagram of another embodiment of the building structure of the utility model.
[0014] Explanation of diagrammatic symbols: 100, building structure; 10, floor slab; 101, original structural layer; 102, mortar covering layer; 103, surface material layer; 104, drainage assembly; 105, downspout; 106, drainage pipe; 107, sound insulation layer; 11, pipe well; 111, common drainage pipe; 112, wall drainage pipe; 12, integrated bathroom base; 13, bathroom wall panel; 131, wall outlet; 14, toilet. DETAILED DESCRIPTION
[0015] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with embodiments and drawings.
[0016] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element; when an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.
[0017] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0018] See also Figure 1The utility model provides a building structure for achieving same-floor drainage of an integrated bathroom. The building structure 100 comprises a floor 10 and a pipe well 11. The floor 10 comprises an original structural layer 101, a mortar covering layer 102 located above the original structural layer 101, and a surface material layer 103 located above the mortar covering layer 102. The original structural layer 101 is a rough draft of the floor 10, that is, the original structural layer 101 is formed of reinforced concrete, and the mortar covering layer 102 and the surface material layer 103 are stacked one by one. On the other hand, the pipe well 11 is also called a pipeline room, and at least one common drainage pipe 111 is arranged in the space inside the pipe well 11.
[0019] Furthermore, the building structure 10 of the utility model further has an integral bathroom base 12 and the bathroom wall panels 13 arranged on the integral bathroom base 12. The integral bathroom base 12 and the bathroom wall panels 13 can form a bathroom space when they are built. The integral bathroom base 12 and the bathroom wall panels 13 can be built at the construction site. In addition, the integral bathroom base 12 is directly arranged on the original structural layer 101, that is, the mortar covering layer 102 and the surface material layer 103 are not laid at the location where the integral bathroom base 12 is located. Furthermore, the integral bathroom base 12 is roughly flush with the surface material layer 103. The flushness referred to herein means that there is no obvious drop between stepping on the surface of the main use area of the integral bathroom base 12 and the surface material layer 103 adjacent to the integral bathroom base 12. Furthermore, the thickness of the edge of the integrated bathroom base 12 is substantially equal to that of the mortar covering layer 102 and the surface material layer 103 .
[0020] Please refer to Figure 1 , the floor 10 has a drainage component 104, the drainage component 104 is buried in the original structural layer 101, and the drainage component 104 is respectively connected to the integrated bathroom base 12 and the common drainage pipe 111. In one embodiment, the drainage component 111 includes a downspout 105 and a drainage pipe 106 connected to the downspout 105. On the other hand, the bathroom wall panels 13 facing the pipe well 11 have a wall outlet 131, and the wall outlet 131 provides a wall outlet pipe 112 connected to the common drainage pipe 111 for passing through. The wall outlet pipe 112 can be connected to a toilet 14, and the toilet 14 is arranged on one of the integrated bathroom base 12 or the bathroom wall panels 13 on which the wall outlet 131 is opened.
[0021] As can be seen from the above, the drainage design associated with the integrated bathroom is completed within the range of the floor, meeting the same-floor drainage requirements. In addition, when the building structure of the utility model realizes the same-floor drainage, the floor 10 does not need to have a lowering or raising design, which can simplify the construction.
[0022] Please refer to Figure 2 In one embodiment, the floor 10 includes at least one sound insulation layer 107, and the sound insulation layer 107 is located between the mortar covering layer 101 and the surface material layer 103. The specific implementation method of the sound insulation layer 107 has been notified by technicians in the field and will not be repeated here.
[0023] The above description is only a preferred embodiment of the utility model and does not constitute any form of limitation to the utility model. Any ordinary technician in the industry can smoothly implement the utility model as shown in the drawings of the specification and described above. However, any technician familiar with the profession can make some changes, modifications and equivalent changes made by using the technical content disclosed above without departing from the scope of the technical solution of the utility model, which are all equivalent embodiments of the utility model. At the same time, any changes, modifications and evolutions of any equivalent changes made to the above embodiments based on the essential technology of the utility model still belong to the technical solution of the utility model.
Claims
1. A building structure for achieving same-floor drainage of integrated bathrooms, characterized by: The building structure comprises a floor slab and a pipe well, wherein the floor slab comprises an original structural layer, a mortar covering layer located on the original structural layer, and a surface material layer located above the mortar covering layer, and at least one common drainage pipe is arranged in the pipe well, and the building structure is characterized in that: The building structure has an integrated bathroom base and bathroom wall panels arranged on the integrated bathroom base. The integrated bathroom base is directly arranged on the original structural layer. The integrated bathroom base is roughly flush with the surface material layer. The floor slab has a drainage component buried in the original structural layer and connected to the integrated bathroom base and the common drainage pipe respectively. The bathroom wall panels facing the pipe well have a wall outlet, and the wall outlet provides a wall drainage pipe connected to the common drainage pipe.
2. The architectural structure for achieving same-floor drainage of integrated bathrooms according to claim 1, characterized in that: The floor slab comprises at least one functional layer between the mortar covering layer and the surface material layer.
3. The architectural structure for achieving same-floor drainage of integrated bathrooms according to claim 1 or 2, characterized in that: The drainage component includes a water drop head and a drainage pipe connected to the water drop head.
4. The architectural structure for achieving same-floor drainage of integrated bathrooms according to claim 3, characterized in that: The wall drain pipe is connected to a toilet, and the toilet is arranged on the integral bathroom base or one of the bathroom wall panels on which the wall drain ports are opened.