A pressure top structure for staggered connection between masonry wall top and steel beam
By using a press-down structure with the masonry wall roof and the steel beam staggered in high-rise buildings, and using embedded pendants, wire ropes and triangular stiffening plates to connect the steel beams and concrete columns, the construction difficulty and safety hazards caused by the narrow distance between the structural columns and the roof steel beams are solved, and efficient support of the structure and simplified construction process is achieved.
Patent Information
- Application Number
- CN202420720303.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-04-09
AI Technical Summary
In high-rise buildings and complex structural systems, during secondary structure masonry, the distance between the structural columns and the steel beams on the roof is small, which leads to difficulties in installing and fixing the formwork, increasing the construction difficulty and safety hazards of concrete pouring.
The top pressing structure is adopted that connects the masonry wall top and the steel beam in a staggered stage. By embedding hanging parts on the steel beams and connecting the steel beams to the concrete columns with wire ropes and triangular stiffening plates, the precise positioning and effective support of concrete casting are ensured.
The precise positioning and effective support of the structural column is achieved, the mechanical transmission and connection strength of the structure is enhanced, the integrity, bending and shear resistance are improved, and the construction steps are simplified, reducing costs and space requirements.
Smart Images

Figure CN222745286U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a top-pressing structure in which a masonry wall top is staggeredly connected with a steel beam. Background Art
[0002] In modern construction projects, especially in high-rise buildings and complex structural systems, secondary structure masonry is a vital link, and the setting of structural columns is particularly critical to enhancing the integrity and earthquake resistance of buildings. Traditional construction techniques usually require the layout of formwork around the structural columns and fixation through a formwork system to ensure the accurate shape and size of the concrete when pouring. However, in specific design scenarios, the position of the secondary structure column may be very close to the steel beam structure of the top plate. Due to the narrow distance between the two and the lack of support points, conventional formwork means will make the installation and fixation of the formwork extremely difficult, which greatly increases the construction difficulty and safety hazards of concrete pouring. Utility Model Content
[0003] The utility model aims to provide a top-pressing structure in which a masonry wall top is staggeredly connected to a steel beam, so as to solve the problems raised in the above-mentioned background technology.
[0004] The technical solution of the utility model is: a top pressure structure in which a masonry wall top is staggeredly connected with a steel beam, comprising a steel beam and a concrete column, wherein the steel beam is arranged at the upper end of the concrete column, and the steel beam and the concrete column are fixedly connected through a flange plate assembly and a web plate;
[0005] The flange plate assembly includes an upper flange plate and a lower flange plate, wherein the upper flange plate is arranged at the upper end of the lower flange plate, and the upper flange plate is arranged at the lower end of the steel beam, and the lower flange plate is arranged at the upper end of the concrete column, and the upper flange plate and the lower flange plate are fixedly connected by a web plate;
[0006] A triangular stiffening plate is arranged on the side of the web, and the triangular stiffening plate is arranged on the upper end of the lower flange plate. At the same time, the upper end of the triangular stiffening plate is fixedly connected to the steel beam through a steel wire rope, and the lower end of the triangular stiffening plate is fixedly connected to the concrete column through a steel bar.
[0007] Furthermore, an embedded hanger is provided at the lower end of the steel beam, and the lower end of the embedded hanger passes through the lower end of the steel beam. At the same time, a fixing hole is opened at the lower end of the embedded hanger, and the fixing hole is fixedly connected to the upper end of the steel wire rope.
[0008] Furthermore, the lower end of the steel wire rope is connected to a fixing assembly, and the fixing assembly is arranged on the oblique side of the triangular stiffening plate;
[0009] The fixing assembly includes a connecting hole and a clamping piece, wherein the clamping piece is arranged inside the connecting hole, and the lower end of the steel wire rope is wound around the connecting hole, and the clamping piece is arranged on the side of the lower end of the steel wire rope.
[0010] Furthermore, there are multiple fixing components, and the multiple fixing components are evenly arranged on the oblique side of the triangular stiffening plate. At the same time, a triangular fixing hole is arranged in the middle of the multiple fixing components. The triangular fixing hole is fixed on the oblique side of the triangular stiffening plate, and the triangular fixing hole and the connecting hole are fixedly connected by a steel wire rope.
[0011] Furthermore, through holes are provided at both ends of the triangular fixing hole, and the through holes penetrate the triangular stiffening plate, and the triangular stiffening plate and the concrete column are fixedly connected by inserting steel bars into the through holes.
[0012] Furthermore, a plurality of connection blocks are evenly arranged on one side of the triangular stiffening plate close to the web, and a clamping block is arranged on the outward end of each connection block, and the connection block and the web are fixedly connected by screws and nuts.
[0013] The utility model provides a top pressure structure in which the top of a masonry wall is staggeredly connected with a steel beam through improvement, which has the following improvements and advantages compared with the prior art:
[0014] Firstly, the utility model provides a connection point between the steel beam and the structural column by setting the embedded hanger, and connects the two by steel wire rope, thereby realizing accurate positioning and effective support of the structural column during the pouring process. At the same time, the design and arrangement of the triangular stiffening plate can not only increase the mechanical transmission between the web and the structural column, but also enhance the connection strength between the two, thereby improving the integrity and bending and shearing resistance of the device;
[0015] Second: The utility model connects the triangular stiffening plate and the web plate by means of screws and nuts, which is not only convenient for installation and disassembly, but also can ensure the stability of the connection, thereby simplifying the on-site construction steps and improving construction efficiency. At the same time, the setting of pre-embedded steel bars not only reduces the construction of temporary support structures on site and reduces construction costs, but also saves space resources on the construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:
[0017] Figure 1 It is a structural schematic diagram of the top pressing structure of the utility model;
[0018] Figure 2 It is a structural schematic diagram of the triangular stiffening plate of the utility model;
[0019] Description of reference numerals:
[0020] 1. Upper flange plate; 2. Steel beam; 3. Embedded hanger; 4. Web plate; 5. Triangular stiffening plate; 501. Triangular fixing hole; 502. Through hole; 503. Connecting block; 504. Clamping block; 6. Lower flange plate; 7. Steel wire rope; 8. Rebar; 9. Fixing assembly; 901. Connecting hole; 902. Clamping piece; 10. Concrete column. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] It should be noted that, in the description of the present invention, the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0023] It should be noted that like reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined or described in one drawing, it will not require further detailed discussion and description in the description of the subsequent drawings.
[0024] refer to Figure 1 and Figure 2 This embodiment provides a capping structure in which the top of a masonry wall is staggeredly connected to a steel beam, and the capping structure is arranged between a steel beam 2 and a concrete column 10. The steel beam 2 is arranged at the upper end of the concrete column 10, and the steel beam 2 and the concrete column 10 are fixedly connected through a flange plate assembly and a web 4. Further, the flange plate assembly includes an upper flange plate 1 and a lower flange plate 6, the upper flange plate 1 is arranged at the upper end of the lower flange plate 6, and the upper flange plate 1 is arranged at the lower end of the steel beam 2, and the lower flange plate 6 is arranged at the upper end of the concrete column 10, and the upper flange plate 1 and the lower flange plate 6 are fixedly connected through the web 4.
[0025] In this embodiment, the capping structure includes a triangular stiffening plate 5, a steel wire rope 7, a steel bar 8 and a fixing assembly 9. The triangular stiffening plate 5 is arranged on the side of the web 4 and on the upper end of the lower flange plate 6. Specifically, the upper end of the triangular stiffening plate 5 is fixedly connected to the steel beam 2 through the steel wire rope 7, the lower end of the triangular stiffening plate 5 is fixedly connected to the concrete column 10 through the steel bar 8, and the side of the triangular stiffening plate 5 is fixedly connected to the web 4 through the connecting block 503 and the clamping block 504.
[0026] Furthermore, a plurality of connection blocks 503 are evenly arranged on one side of the triangular stiffening plate 5 close to the web 4, and two clamping blocks 504 are symmetrically arranged on one end of each connection block 503 facing outward, and a long threaded hole is opened on each clamping block 504. In other words, the side edge of the triangular stiffening plate 5 and the web 4 are fixedly connected by screws passing through the long threaded holes in the two symmetrically arranged clamping blocks 504 and then matching with nuts.
[0027] In this embodiment, at least one embedded hanger 3 is provided at the lower end of the steel beam 2, wherein the lower end of the embedded hanger 3 penetrates the lower end of the steel beam 2, and a fixing hole is provided at the lower end of the embedded hanger 3. At the same time, a fixing assembly 9 is provided on the oblique side of the triangular stiffening plate 5, specifically, the upper end of the steel wire rope 7 is fixedly connected to the fixing hole, and the lower end of the steel wire rope 7 is connected to the fixing assembly 9.
[0028] Furthermore, a plurality of fixing components 9 are provided, wherein each fixing component 9 includes a connecting hole 901 and a clamping member 902. Specifically, the clamping member 902 is arranged inside the connecting hole 901, and the lower end of the steel wire rope 7 is wound around the connecting hole 901, and the clamping member 902 is arranged on the side of the lower end of the steel wire rope 7.
[0029] Further, a plurality of fixing components 9 are evenly arranged on the oblique side of the triangular stiffening plate 5, and a triangular fixing hole 501 is arranged in the middle of the plurality of fixing components 9, the triangular fixing hole 501 is fixed on the oblique side of the triangular stiffening plate 5, and the triangular fixing hole 501 and the connecting hole 901 are fixedly connected by a steel wire rope 7. Specifically, through holes 502 are arranged at both ends of the triangular fixing hole 501, and the through holes 502 penetrate the triangular stiffening plate 5, and the triangular stiffening plate 5 and the concrete column 10 are fixedly connected by inserting a steel bar 8 into the through hole 502.
[0030] Specifically, the specific implementation process of the capping structure in this embodiment is as follows:
[0031] Step 1: During the construction of the steel beam 2, the embedded hanger 3 is embedded in the lower end of the steel beam 2, and the lower end of the embedded hanger 3 is set at the lower end of the steel beam 2. The number of embedded hangers 3 is not limited. In this embodiment, the embedded hanger 3 can be provided with embedded hooks, and the number can be set to three.
[0032] Step 2: Place the right-angled side of the triangular stiffening plate 5 close to one side of the web 4, pass the screw through the long threaded hole in the clamp 504, and connect one end of the screw to the nut, so that the two symmetrically arranged clamps 504 are fixedly connected.
[0033] Step 3: The upper end of the steel wire rope 7 is fixedly connected to the lower end of the embedded hanger 3, and the lower end of the steel wire rope 7 is first passed through the connection hole 901, and then the lower end is gathered in the triangular fixing hole 501 for centralized fixing. Then the clamping piece 902 is inserted into the connection hole 901 to compress the steel wire rope 7.
[0034] Step 4: During the pouring of the concrete column 10, the steel bar 8 is pre-buried at the upper end of the concrete column 10, and the upper end of the steel bar 8 is set at the upper end of the concrete column 10. The upper end of the steel bar 8 is passed through the through hole 502, and a bent steel bar 8 is welded to the upper end of the steel bar 8, and the bent steel bar 8 is set on the oblique side of the triangular stiffening plate 5.
[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A top-pressing structure in which a masonry wall top is staggeredly connected to a steel beam, comprising a steel beam (2) and a concrete column (10), wherein the steel beam (2) is arranged at the upper end of the concrete column (10), and characterized in that: The steel beam (2) and the concrete column (10) are fixedly connected via a flange plate assembly and a web plate (4); The flange plate assembly comprises an upper flange plate (1) and a lower flange plate (6), wherein the upper flange plate (1) is arranged at the upper end of the lower flange plate (6), and the upper flange plate (1) is arranged at the lower end of the steel beam (2), and the lower flange plate (6) is arranged at the upper end of the concrete column (10), and the upper flange plate (1) and the lower flange plate (6) are fixedly connected via a web plate (4); A triangular stiffening plate (5) is provided on the side of the web (4), and the triangular stiffening plate (5) is provided on the upper end of the lower flange plate (6). At the same time, the upper end of the triangular stiffening plate (5) is fixedly connected to the steel beam (2) through a steel wire rope (7), and the lower end of the triangular stiffening plate (5) is fixedly connected to the concrete column (10) through a steel bar (8).
2. The top-pressing structure of the masonry wall top and the steel beam staggered connection according to claim 1 is characterized in that: The lower end of the steel beam (2) is provided with an embedded hanger (3), and the lower end of the embedded hanger (3) passes through the lower end of the steel beam (2). At the same time, a fixing hole is opened at the lower end of the embedded hanger (3), and the fixing hole is fixedly connected to the upper end of the steel wire rope (7).
3. A top-pressing structure in which the top of a masonry wall is staggeredly connected to a steel beam according to claim 1 or 2, characterized in that: The lower end of the steel wire rope (7) is connected to a fixing assembly (9), and the fixing assembly (9) is arranged on the oblique side of the triangular stiffening plate (5); The fixing assembly (9) comprises a connecting hole (901) and a clamping member (902), wherein the clamping member (902) is arranged inside the connecting hole (901), and the lower end of the steel wire rope (7) is wound around the connecting hole (901), and the clamping member (902) is arranged on the side of the lower end of the steel wire rope (7).
4. The top-pressing structure of the masonry wall top and the steel beam staggered connection according to claim 3 is characterized in that: A plurality of the fixing components (9) are provided, and the plurality of the fixing components (9) are evenly arranged on the oblique side of the triangular stiffening plate (5). A triangular fixing hole (501) is provided in the middle of the plurality of the fixing components (9), and the triangular fixing hole (501) is fixed on the oblique side of the triangular stiffening plate (5). The triangular fixing hole (501) and the connecting hole (901) are fixedly connected by a steel wire rope (7).
5. The top-pressing structure of the masonry wall top and the steel beam staggered connection according to claim 4 is characterized in that: Both ends of the triangular fixing hole (501) are provided with through holes (502), and the through holes (502) penetrate the triangular stiffening plate (5), and the triangular stiffening plate (5) and the concrete column (10) are fixedly connected by inserting steel bars (8) into the through holes (502).
6. The top-pressing structure of the masonry wall top and the steel beam staggered connection according to claim 3 is characterized in that: A plurality of connection blocks (503) are evenly arranged on one side of the triangular stiffening plate (5) close to the web (4), and a clamping block (504) is arranged on the outward end of each connection block (503). The connection blocks (503) and the web (4) are fixedly connected by screws and nuts.