A top tooling connection device for a standard section support tower
By designing a mechanical connection device for the tower crane standard section, the problem of the inability to weld the rental tower crane standard section is solved, and the safe, fast and high-quality connection between the top tooling and the tower crane standard section is achieved, and the construction speed and safety are improved.
Patent Information
- Application Number
- CN202421512699.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-28
AI Technical Summary
The rental standard section of the tower crane cannot be welded on it, resulting in difficulty in effectively connecting the top tooling and the standard section support tower.
A standard section support tower top tooling connection device is designed, using top steel plates, bolt sleeves, steel pipes, nuts and screws with nuts. It is connected mechanically without welding, ensuring a stable connection between the top tooling and the tower crane standard section.
The top tooling and standard section support tower are connected safely, fast and high-quality, avoiding welding costs and construction periods, and improving construction speed and safety.
Smart Images

Figure CN222745308U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a top tooling connection device of a standard section supporting tower. Background Art
[0002] When installing existing high-rise and large-span steel structures, it is often necessary to set up a temporary support system with high stress and height. If the support system is entirely produced on-site, the cost is high and the construction period is long. In order to save costs and speed up the construction period, renting a tower crane standard section as a supporting tower frame becomes one of the solutions. However, the rented tower crane standard section cannot be welded on it, so how to connect the top tooling with the standard section supporting tower frame becomes an urgent problem to be solved. Utility Model Content
[0003] The utility model provides a tooling connection device for the top of a standard section supporting tower frame, which has the advantages of simple structure, convenient processing, convenient installation and disassembly, reusability, and mechanical connection with the tower crane standard section without welding throughout the whole process, thereby increasing the installation safety, speed and quality of the standard section supporting tower frame.
[0004] The technical problem to be solved is that the standard section of the rented tower crane cannot be welded on it, and the top tooling needs to be effectively connected to the standard section supporting tower frame.
[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0006] The utility model discloses a top tooling connection device for a standard section supporting tower, comprising a top tooling, a tooling connection device and a tower crane standard section;
[0007] The tooling connection device comprises a top steel plate, a bolt sleeve, a steel pipe, a nut and a screw with a nut, the top steel plate is connected to the top tooling, the steel pipe is fixed on the bottom surface of the top steel plate, and the bolt sleeve is fixed to the steel pipe;
[0008] The tower crane standard section includes a tower crane standard section bolt sleeve and a tower crane standard section column, wherein the tower crane standard section bolt sleeve is welded to the tower crane standard section column;
[0009] The steel pipe is aligned with the tower crane standard section column, the screw rod with the nut passes through the bolt sleeve, and the tower crane standard section bolt sleeve is fixed by the nut.
[0010] The utility model discloses a top tooling connection device for a standard section support tower. Further, the top steel plate and the top tooling are connected by welding, bolting or connecting plates.
[0011] The utility model provides a top tooling connection device for a standard section supporting tower frame. Further, the outer dimensions of the steel pipe are consistent with those of a tower crane standard section column.
[0012] The utility model discloses a tooling connection device for the top of a standard section supporting tower frame. Furthermore, the cross-sectional shapes of the steel pipe and the tower crane standard section column are rectangular, square, trapezoid, parallelogram, triangle, polygon with more than four sides, circle or ellipse.
[0013] The utility model provides a top tooling connection device for a standard section supporting tower frame. Further, at least two bolt sleeves and screw rods with nuts are provided.
[0014] The utility model provides a tooling connection device for the top of a standard section supporting tower frame. Further, the screw rod with a nut passes through a bolt sleeve, and the tower crane standard section bolt sleeve is fixed by a double nut.
[0015] The utility model provides a top tooling connection device for a standard section support tower, and further, the projection area of the top steel plate is greater than the sum of the projection areas of the steel pipe and the bolt sleeve.
[0016] The utility model discloses a top tooling connection device for a standard section supporting tower. Further, the cross-sectional shape of the top steel plate is a rectangle, a square, a trapezoid, a parallelogram, a triangle, a polygon with more than four sides, a circle or an ellipse.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] The present application sets up a detachable connecting device, which has a simple structure, is easy to process, convenient to install and disassemble, is reusable, and is mechanically connected to the standard section of the tower crane without welding. It solves the problem of connecting the top tooling with the standard section support frame, speeds up construction, and reduces construction costs.
[0019] The utility model will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the structure of the utility model;
[0021] Figure 2 It is an enlarged view of part 2;
[0022] Figure 3 A diagram showing only the connected devices;
[0023] Figure 4 for Figure 3 Top view of the .
[0024] Reference numerals:
[0025] 1. Top tooling; 2. Tooling connection device; 21. Top steel plate; 22. Bolt sleeve; 23. Steel pipe; 24. Nut; 25. Screw with nut; 3. Standard section of tower crane; 31. Bolt sleeve of standard section of tower crane; 32. Standard section column of tower crane. DETAILED DESCRIPTION
[0026] like Figure 1-Figure 4 As shown, the utility model discloses a top tooling connection device for a standard section supporting tower, including a top tooling 1, a tooling connection device 2 and a tower crane standard section 3. The top tooling 1 is a frame structure at the top of a temporary support system. The tooling connection device 2 is used to connect the top tooling 1 with the tower crane standard section 3, and includes a top steel plate 21, a bolt sleeve 22, a steel pipe 23, a nut 24 and a screw 25 with a nut. The top steel plate 21 is used to connect with the top tooling 1, and its connection form can be but not limited to welding, bolting, connection plate connection and the like. The steel pipe 23 is welded to the bottom surface of the top steel plate 21, and the bolt sleeve 22 is connected to the steel pipe 23.
[0027] The tower crane standard section 3 comprises a tower crane standard section bolt sleeve 31 and a tower crane standard section column 32 . The tower crane standard section bolt sleeve 31 and the tower crane standard section column 32 are already welded and connected when the tower crane standard section 3 leaves the factory.
[0028] The steel pipe 23 needs to be aligned with the tower crane standard section column 32, and there should be no misalignment. The bolt sleeve 22 needs to be aligned with the tower crane standard section bolt sleeve 31, otherwise the screw rod 25 with the nut cannot be inserted smoothly. Before installation, the steel pipe 23 needs to be welded to the bolt sleeve 22, and the steel pipe 23 is welded to the top steel plate 21. The screw rod 25 with the nut has been installed in the bolt sleeve 22, and the nut 24 and the top tooling 1 have not been installed. During installation, the screw rod 25 with the nut needs to be inserted into the tower crane standard section bolt sleeve 31 and the steel pipe 23 needs to be aligned with the tower crane standard section column 32. After the bolt sleeve 22 is aligned with the tower crane standard section bolt sleeve 31, the nut 24 is tightened, and then the top tooling 1 is connected and fixed to the top steel plate 21.
[0029] Among them, the steel pipe 23 and the tower crane standard section column 32 need to have the same outer dimensions, and the cross-sectional shapes of the steel pipe 23 and the tower crane standard section column 32 may include but are not limited to rectangle, square, trapezoid, parallelogram, triangle, polygon with more than four sides, circle, ellipse, etc.
[0030] To ensure safety, the number of the bolt sleeve 22, the nut 24, and the screw rod 25 with a nut is at least two, which can be increased or decreased according to the situation. The number of the steel pipe 23 and the top steel plate 21 is one.
[0031] The projection area of the top steel plate 21 needs to be larger than the sum of the projection areas of the steel pipe 23 and the bolt sleeve 22. The projection area of the top steel plate 21 needs to be larger than the projection area of the connection of the top tooling 1. The cross-sectional shape of the top steel plate 21 may include but is not limited to a rectangle, square, trapezoid, parallelogram, triangle, polygon with more than four sides, circle, ellipse, etc.
[0032] The bolt sleeve 22 has a suitable opening, and the diameter of the hole is slightly larger than the diameter of the screw rod 25 with the nut.
[0033] The installation method is as follows:
[0034] Step 1: First, weld the steel pipe 23 to the bolt sleeve 22, and then weld the steel pipe 23 to the top steel plate 21. The screw rod 25 with the nut has been installed in the bolt sleeve 22, and the nut 24 and the top tooling 1 have not been installed.
[0035] Step 2: Insert the screw rod 25 with the nut into the tower crane standard section bolt sleeve 31.
[0036] Step 3: Set the nut 24 on the end of the screw rod 25 with a nut and tighten it.
[0037] Step 4: Install the top tooling 1 on the top steel plate 21 . The top tooling 1 can be welded and fixed to the top steel plate 21 .
[0038] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A top tooling connection device for a standard section support tower, characterized in that: It comprises a top tooling (1), a tooling connection device (2) and a tower crane standard section (3); The tooling connection device (2) comprises a top steel plate (21), a bolt sleeve (22), a steel pipe (23), a nut (24) and a screw rod (25) with a nut, wherein the top steel plate (21) is connected to the top tooling (1), the steel pipe (23) is fixed to the bottom surface of the top steel plate (21), and the bolt sleeve (22) is fixed to the steel pipe (23); The tower crane standard section (3) comprises a tower crane standard section bolt sleeve (31) and a tower crane standard section column (32), wherein the tower crane standard section bolt sleeve (31) and the tower crane standard section column (32) are welded and connected; The steel pipe (23) is aligned with the tower crane standard section column (32), and the screw rod (25) with a nut passes through the bolt sleeve (22), and the tower crane standard section bolt sleeve (31) is fixed by a nut (24).
2. A standard section support tower top tooling connection device according to claim 1, characterized in that: The top steel plate (21) is connected to the top tooling (1) by welding, bolting or connecting plates.
3. The top tooling connection device of a standard section support tower according to claim 1, characterized in that: The steel pipe (23) has the same external dimensions as the tower crane standard section column (32).
4. A standard section support tower top tooling connection device according to claim 3, characterized in that: The cross-sectional shapes of the steel pipe (23) and the tower crane standard section column (32) are rectangular, square, trapezoid, parallelogram, triangle, polygon with more than four sides, circle or ellipse.
5. The top tooling connection device of a standard section support tower according to claim 1, characterized in that: At least two of the bolt sleeves (22) and the screw rods (25) with nuts are provided.
6. The top tooling connection device of a standard section support tower according to claim 1, characterized in that: The screw rod (25) with a nut passes through a bolt sleeve (22) and a tower crane standard section bolt sleeve (31) and is fixed by a double nut (24).
7. The top tooling connection device of a standard section support tower according to claim 1, characterized in that: The projection area of the top steel plate (21) is greater than the sum of the projection areas of the steel pipe (23) and the bolt sleeve (22).
8. The top tooling connection device of a standard section support tower according to claim 7, characterized in that: The cross-sectional shape of the top steel plate (21) is a rectangle, a square, a trapezoid, a parallelogram, a triangle, a polygon with more than four sides, a circle or an ellipse.