Underground pipeline fixing device

By designing a downhole pipeline fixing device including a mounting frame, clamping mechanism and adjusting support feet, the problem of the fixing device falling off due to the weight and vibration of the pipeline is solved, and the stable clamping and shock absorption of the pipeline is achieved, and the stability and safety of the fixing device are improved.

CN222746760UActive Publication Date: 2025-04-11DAZHONG MINING CO LTD INNER MONGOLIA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421582449.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2025-04-11
Estimated Expiration
2034-07-05

AI Technical Summary

Technical Problem

In the mining industry, large pipelines in the shaft become heavier due to long-term liquid transport, causing the fixture to vibrate, which may cause the fixture to fall off from the inner wall of the shaft.

Method used

A downhole pipeline fixing device is designed, including a mounting frame, a clamping mechanism and an adjusting support foot. The mounting frame is installed on the well wall by bolts. The clamping mechanism is composed of a fixing plate, clamping plate, clamping plate and spring, used to clamp and shock-absorbing pipes, and the adjustment support foot is used for ground support.

Benefits of technology

The device stabilizes the pipes through the clamping mechanism to prevent vibration from falling off the fixing device, improving the stability and safety of the fixing device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222746760U_ABST
    Figure CN222746760U_ABST
Patent Text Reader

Abstract

The underground pipeline fixing device comprises a mounting frame and clamping mechanisms, a first supporting plate is fixedly arranged at the middle end of the outer side of the mounting frame, a second supporting plate is fixedly arranged at the position, located above a mounting hole, of the lower end of the mounting frame, the number of the clamping mechanisms is two, the clamping mechanisms are arranged above the first supporting plate and the second supporting plate respectively, and the clamping mechanisms are arranged on the mounting frame. The clamping mechanism is composed of a fixing plate, a clamping hoop and two clamping plates, a semicircular arc-shaped groove matched with the clamping hoop and coaxial with the clamping hoop is formed in the outer side face of the fixing plate, the clamping hoop is in a semicircular arc shape and is installed on the outer side face of the fixing plate through matching bolts at the two ends, and the clamping plates are in two symmetrical semicircular arcs. A plurality of guide rods are arranged on the outer side faces of the clamping plates at equal intervals, the two clamping plates are slidably connected into the fixing plate and the hoop through the guide rods respectively, and springs are arranged in the guide rods in a sleeved mode. The fixing device has the advantages of being good in fixing effect, strong in supporting effect, capable of preventing the pipeline from falling off from the well wall and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline fixing, in particular to a pipeline fixing device used underground. Background Art

[0002] In the mining industry, a large number of pipes are needed in mines to transport gas, liquid or fluid with solid particles, etc. Among them, large pipes are installed on the concrete wall of the shaft through fixing devices. The setting of the concrete wall improves the stability of the connection between the shaft and the fixing device, so that the large pipes can be more stably connected to the inner wall of the shaft. However, when large pipes transport liquid for a long time, the pipes will become heavier. At the same time, the vibration generated by the transportation of liquid in the pipe is easy to drive the fixing device to vibrate through the pipe, and then the fixing device is easy to shake on the concrete wall, causing the concrete wall to crack. There is a risk of causing the pipe and the fixing device to fall off from the inner wall of the shaft.

[0003] For this purpose, we propose an underground pipe fixing device with good supporting effect and stable structure. Utility Model Content

[0004] The utility model provides a pipeline fixing device for underground wells to solve the background technology

[0005] The questions raised in .

[0006] In order to solve the above problems, the utility model provides a pipe fixing device for underground use, including a mounting frame and a clamping mechanism. The mounting frame is installed on the wall of the mine through mounting holes opened at the upper and lower ends and matched with bolts. A first support plate is fixedly arranged at the middle end of the outer side of the mounting frame, and a second support plate is fixedly arranged at the lower end above the mounting hole. There are two clamping mechanisms, one of which is arranged above the first support plate and the other above the second support plate. The clamping mechanism is composed of a fixing plate, a clamping hoop and a clamping plate. A matching clamping hoop is opened in the outer side surface of the fixing plate and is coaxial with the clamping hoop. The semicircular arc groove is semicircular, and the clamp is semicircular and is installed on the outer side of the fixed plate by matching bolts at both ends. The clamping plate is two symmetrical semicircular arcs, and a plurality of guide rods are equidistantly arranged on the outer side of the clamping plate. One of the clamping plates is slidably connected to the fixed plate through the guide rod, and the other clamping plate is slidably connected to the clamp through the guide rod. A spring is sleeved in the guide rod, and the spring slidably connected to the guide rod in the fixed plate is located between the fixed plate and the clamping plate, and the spring slidably connected to the guide rod in the clamp is located between the clamp and the clamping plate.

[0007] Preferably: the bottom end of the fixed plate in the clamping mechanism above the first support plate is fixedly connected to the first support plate, and the side is fixedly connected to the mounting frame, the top and bottom ends of the fixed plate in the clamping mechanism above the second support plate are respectively fixedly connected to the lower side of the first support plate and the upper side of the second support plate, and the side is fixedly connected to the mounting frame.

[0008] Preferably: an adjustment support foot supported on the ground is provided on the lower side of the second support plate, the adjustment support foot is composed of a threaded base and an adjustment foot, and the threaded base is fixedly installed under the second support plate, and the adjustment foot is threadedly connected to the threaded base.

[0009] The beneficial effects of adopting the above technical solution are:

[0010] By means of the mounting frame cooperating with the first support plate, the second support plate and the clamping mechanism arranged above the first support plate and the second support plate, two pipes can be clamped and installed at the same time, thereby improving work efficiency.

[0011] The coordination of the arc groove, clamp, clamping plate, spring and guide rod in the fixing plate makes it easy to clamp the pipe. At the same time, the clamped pipe is shock-absorbed by the clamping plate, spring and guide rod, thereby avoiding the risk of the mounting frame falling off from the well wall concrete due to vibration.

[0012] By adjusting the setting of the support feet, the installed pipe can be supported by the ground, further improving the stability after installation, avoiding the risk of the mounting frame falling off the concrete well wall due to excessive weight of the pipe and vibration during transportation, and improving work stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.

[0014] Figure 2 It is a schematic diagram of the analytical structure after the utility model is installed.

[0015] Figure 3 For this utility model Figure 2 Schematic diagram of the enlarged structure of part A.

[0016] Among them: 1-mounting frame; 11-mounting hole; 2-clamping mechanism; 21-fixing plate; 22-clamp; 23-clamping plate; 24-guide rod; 25-spring; 3-well wall; 4-first support plate; 5-second support plate; 6-adjusting support foot; 61-threaded base; 62-adjusting foot. DETAILED DESCRIPTION

[0017] The embodiments of the present utility model are described in detail below with reference to the accompanying drawings.

[0018] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0019] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, a movable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0020] like Figure 1-3 In this embodiment, a pipe fixing device for underground use includes a mounting frame 1 and a clamping mechanism 2. The mounting frame 1 is mounted on the shaft wall 3 of the mine through mounting holes 11 opened at the upper and lower ends and bolts. A first support plate 4 is fixedly arranged at the middle end of the outer side of the mounting frame 1, and a second support plate 5 is fixedly arranged at the lower end above the mounting hole 11. There are two clamping mechanisms 2, one of which is respectively arranged above the first support plate 4 and the second support plate 5. The clamping mechanism 2 is composed of a fixing plate 21, a clamping hoop 22, and a clamping plate 23. A matching clamping hoop 22 is opened in the outer side surface of the fixing plate 21, and a semicircular arc groove coaxial with the clamping hoop 22 is provided. The clamping hoop 22 It is semicircular and is installed on the outer side of the fixed plate 21 by matching bolts at both ends. The clamping plates 23 are two symmetrical semicircular shapes, and a number of guide rods 24 are equidistantly arranged on the outer side of the clamping plates 23. One of the two clamping plates 23 is slidably connected to the fixed plate 21 through the guide rod 23, and the other clamping plate 23 is slidably connected to the clamp 22 through the guide rod 24. A spring 25 is sleeved in the guide rod 24, and the spring 25 slidably connected to the guide rod 24 in the fixed plate 21 is located between the fixed plate 21 and the clamping plate 23, and the spring 25 slidably connected to the guide rod 24 in the clamp 22 is located between the clamp 22 and the clamping plate 23.

[0021] Through the above technical scheme: when in use, the equipment is installed on the well wall 3 through the mounting holes 11 at the upper and lower ends of the mounting frame 1 with the help of bolts, and then the pipe to be fixed is first placed in the clamping mechanism 2 above the second support plate 5 according to the situation, and the clamp 22 is installed on the fixing plate 21 by bolts, so as to facilitate the fixing of the pipe in the clamping mechanism 2, and at the same time the clamping plate 23 is in contact with the outer surface of the pipe. When the pipe vibrates, the clamping plate 23 moves on the fixing plate 21 or the clamp 22 through the cooperation of the guide rod 24 and the spring 25, so as to complete the shock absorption, avoid the shaking of the mounting frame 1 caused by vibration, avoid the cracking of the concrete in the well wall 3 due to shaking, and cause the pipe to fall off, thereby improving the stability after fixation, and by setting the clamping mechanism 2 above the first support plate 4, it is convenient to fix more than one pipe, thereby improving the convenience of work.

[0022] Preferably: the bottom end of the fixing plate 21 in the clamping mechanism 2 arranged above the first support plate 4 is fixedly connected to the first support plate 4, and the side is fixedly connected to the mounting frame 1, and the top and bottom ends of the fixing plate 21 in the clamping mechanism 2 arranged above the second support plate 5 are respectively fixedly connected to the lower side surface of the first support plate 4 and the upper side surface of the second support plate 5, and the side surface is fixedly connected to the mounting frame 1.

[0023] Through the above technical scheme, the setting of the fixed plate 21 improves the support of the clamping mechanism 2 in the mounting frame 1, thereby facilitating the stable clamping of the pipeline on the mounting frame 1. The top and bottom ends of the fixed plate 21 in the clamping mechanism 2 above the second support plate 5 are respectively fixedly connected to the first support plate 4, the second support plate 5, and the mounting frame 1, thereby providing effective supporting force to the first support plate 4 while ensuring its own structural stability, thereby ensuring the stability of the clamping mechanism 2 on the first support plate 4 after clamping the pipeline.

[0024] Preferably: the lower side of the second support plate 5 is provided with an adjustment support foot 6 supported on the ground, the adjustment support foot 6 is composed of a threaded base 61 and an adjustment foot 62, and the threaded base 61 is fixedly installed under the second support plate, and the adjustment foot 62 is threadedly connected to the threaded base 61.

[0025] Through the above technical solution, the setting of the adjustable support foot 6 can provide a supporting force to the mounting frame 1 through the ground, thereby reducing the influence of the pipe weight on the mounting frame 1, avoiding the problem of cracking of the concrete on the well wall 3 and falling off of the pipe due to excessive weight of the pipe. The threaded connection between the adjusting foot 62 and the threaded base 61 facilitates the adjustment of the distance from the ground, thereby improving the fault tolerance during installation.

[0026] Finally, it should be noted that the above implementation cases are only used to illustrate the present invention, rather than to limit the technical solutions described in the present invention; therefore, although this specification has described the present invention in detail with reference to the above-mentioned embodiments, ordinary technicians in this field should understand that the present invention can still be modified or replaced by equivalents, and all technical solutions and improvements that do not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention; technologies not described in detail in the present invention are implemented with existing technologies.

Claims

1. A downhole pipe fixing device, comprising a mounting frame and a clamping mechanism, characterized in that: The mounting frame is installed on the shaft wall of the mine through mounting holes opened at the upper and lower ends and bolts are matched with the mounting holes, the first support plate is fixedly provided at the middle end of the outer side of the mounting frame, and the second support plate is fixedly provided at the lower end above the mounting hole, the clamping mechanism is composed of a fixing plate, a clamp, and a clamping plate, the outer side surface of the fixing plate is provided with a matching clamp and a semicircular arc groove coaxial with the clamp, the clamp is semicircular and is installed on the outer side surface of the fixing plate by matching bolts at both ends, the clamping plate is two symmetrical semicircular arcs, and a plurality of guide rods are equidistantly provided on the outer side surface of the clamping plate, one of the clamping plates is slidably connected to the fixing plate through the guide rod, and the other clamping plate is slidably connected to the clamp through the guide rod, a spring is sleeved in the guide rod, and the spring slidably connected to the guide rod in the fixing plate is located between the fixing plate and the clamping plate, and the spring slidably connected to the guide rod in the clamp is located between the clamp and the clamping plate.

2. The underground pipe fixing device according to claim 1, characterized in that: The bottom end of the fixed plate in the clamping mechanism above the first support plate is fixedly connected to the first support plate, and the side is fixedly connected to the mounting frame. The top and bottom ends of the fixed plate in the clamping mechanism above the second support plate are respectively fixedly connected to the lower side of the first support plate and the upper side of the second support plate, and the side is fixedly connected to the mounting frame.

3. The underground pipe fixing device according to claim 1, characterized in that: An adjustment support foot supported on the ground is provided on the lower side of the second support plate. The adjustment support foot consists of a threaded base and an adjustment foot. The threaded base is fixedly installed below the second support plate, and the adjustment foot is threadedly connected to the threaded base.