Intelligent construction site visual management equipment
By designing a rotating protective case and cleaning system in the smart construction site visual management equipment, the problem of inconvenient fixing and cleaning of the equipment is solved, the functions of angle adjustment and screen cleaning are realized, and the flexibility and efficiency of the equipment are improved.
Patent Information
- Application Number
- CN202421680699.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-07-16
AI Technical Summary
The angle of the existing smart construction site visual management equipment is fixed, making it difficult to adjust as needed, and the dust on the cleaning pad will scratch the screen, affecting use.
A device including a base, a protective case and a smart construction site display screen is designed. A rotating mechanism is provided between the protective case and the column. The rotation of the protective case is realized through the cooperation of the knob and the locking screw, thereby adjusting the placement angle of the display screen. At the same time, the piston plate is driven by the pedal to drive the gas out to clean the display screen.
The angle adjustment of the smart construction site display screen is realized, which improves the flexibility of the equipment and the convenience of use. At the same time, the display screen is kept clean through the cleaning function, avoiding identification obstructions caused by dust.
Smart Images

Figure CN222746998U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction site management, and in particular to a smart construction site visualization management device. Background Art
[0002] A smart construction site refers to the use of information technology to accurately design and simulate construction projects through a three-dimensional design platform. Focusing on construction process management, an information ecosystem for construction projects is established that features interconnected collaboration, intelligent production, and scientific management. This data is combined with engineering information collected through the Internet of Things in a virtual reality environment for data mining and analysis. Process trend forecasts and expert plans are provided to achieve visual and intelligent management of engineering construction, thereby improving the level of information technology in engineering management and gradually achieving green and ecological construction.
[0003] At present, a Chinese patent announcement with announcement number CN218957190U discloses a smart construction site visualization management device, including a vertical frame, a collar movably sleeved on the upper end of the vertical frame, a recognition device for facial recognition fixedly connected to the collar, a threaded groove also provided on the collar, a screw threadedly sleeved in the threaded groove, a cleaning mechanism provided at the screen of the recognition device, the cleaning mechanism including a vertical rod and a vertical plate, two circular plates fixedly sleeved on the middle part of the vertical frame, circular grooves passing through the plate surfaces of the two circular plates, the two circular grooves aligned up and down, two short rods fixedly connected to the bottom surface of the recognition device, the bottoms of the two short rods fixedly connected to limited blocks, the screen of the recognition device is wiped while moving under the vertical plate and the screen of the recognition device is exposed, normal recognition can be performed, the screen of the recognition device is protected when the pedal is not lowered, the safety of the recognition device and the cleanliness of the screen are improved, and the dust on the construction site is effectively prevented from sticking to the screen and causing obstruction of the recognition device.
[0004] In actual use, it is found that the angle of the visualization management device is fixed, which makes it inconvenient to adjust the angle of the visualization management device as needed. The screen is wiped with a cleaning pad, but when there is dust on the cleaning pad, wiping the screen not only easily scratches the screen, but also does not clean it thoroughly, affecting its use. Therefore, we propose a smart construction site visualization management device to solve the above problem. Utility Model Content
[0005] The purpose of the utility model is to solve the shortcomings of the prior art and to propose a smart construction site visualization management device.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A smart construction site visual management device comprises a base, a protective shell and a smart construction site display screen, wherein the smart construction site display screen is fixedly installed in the protective shell, a column is fixedly installed on the top of the base, and a rotating mechanism is provided between the protective shell and the column;
[0008] A U-shaped seat is fixedly installed on one side of the protective shell, and a rotating shaft is fixedly installed on the inner walls of both sides of the U-shaped seat, and the rotating shaft is rotatably installed on the stand;
[0009] An air outlet pipe is fixedly installed on the top inner wall of the protective shell, and a plurality of air outlet heads are installed at the bottom of the air outlet pipe.
[0010] Preferably, a rotation hole is provided on the column, and the rotation shaft is rotatably connected to the corresponding rotation hole.
[0011] Preferably, a threaded hole is opened on the inner wall of one side of the rotating hole, a locking screw is installed in the threaded hole, a knob is fixedly installed at one end of the locking screw, and the locking screw is adapted to the rotating shaft.
[0012] Preferably, a sealing box is fixedly installed on the top of the base, an air outlet is provided on one side of the sealing box, a hose is installed between the air outlet and the air outlet pipe, and an air inlet is provided on the other side of the sealing box.
[0013] Preferably, a one-way valve 1 is installed in the air outlet, and a one-way valve 2 is installed in the air inlet.
[0014] Preferably, a piston plate is slidably mounted in the sealing box, a plurality of fixing rods are mounted on the top of the piston plate in a rectangular shape, and pedals are fixedly mounted on the top ends of the plurality of fixing rods.
[0015] Preferably, a plurality of return springs are fixedly mounted on the bottom of the pedal, and the bottom ends of the return springs are fixedly mounted on the top of the sealing box.
[0016] Preferably, a sealing groove is provided on the outer side of the piston plate, a sealing ring is installed in the sealing groove, and the sealing ring is connected to the sealing box in a sliding and sealing manner.
[0017] Beneficial effects of the utility model:
[0018] 1. Through the action of the knob, locking screw and threaded hole, the locking screw can fix and release the rotating shaft. By rotating the protective shell and the smart construction site display, the protective shell can rotate with the rotating shaft as the center, thereby achieving the purpose of adjusting the placement angle of the smart construction site display;
[0019] 2. When the staff squeezes the pedal with their feet, the pedal can compress the reset spring, and the pedal drives the piston plate to move downward through the driving rod. The piston plate can squeeze the gas in the sealed box, so that the air enters the air outlet pipe through the air outlet pipe and the hose. The air outlet pipe blows onto the smart construction site display screen through the air outlet head, so as to clean the smart construction site display screen. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a three-dimensional structural diagram of a smart construction site visualization management device proposed by the utility model;
[0021] Figure 2 This is a schematic diagram of a cross-sectional three-dimensional structure of a smart construction site visual management device proposed by the utility model;
[0022] Figure 3 This is a schematic diagram of the structure of part A of a smart construction site visual management device proposed by the utility model;
[0023] Figure 4 This is a structural schematic diagram of part B of a smart construction site visualization management device proposed in the utility model.
[0024] In the figure: 1. Base; 2. Column; 3. Protective shell; 4. Smart construction site display screen; 5. U-shaped seat; 6. Rotating shaft; 7. Threaded hole; 8. Locking screw; 9. Knob; 10. Exhaust pipe; 11. Exhaust head; 12. Sealing box; 13. Exhaust hole; 14. Inlet hole; 15. Piston plate; 16. Fixing rod; 17. Pedal; 18. Return spring. DETAILED DESCRIPTION
[0025] The technical solution of the utility model will be described clearly and completely below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Reference Figure 1-4A smart construction site visualization management device comprises a base 1, a protective shell 3 and a smart construction site display screen 4, wherein the smart construction site display screen 4 is fixedly installed in the protective shell 3, a column 2 is fixedly installed on the top of the base 1, a rotating mechanism is provided between the protective shell 3 and the column 2, a U-shaped seat 5 is fixedly installed on one side of the protective shell 3, a rotating shaft 6 is fixedly installed on the inner walls on both sides of the U-shaped seat 5, and the rotating shaft 6 is rotatably installed on the column, an air outlet pipe 10 is fixedly installed on the inner wall of the top of the protective shell 3, a plurality of air outlet heads 11 are installed at the bottom of the air outlet pipe 10, a rotating hole is provided on the column 2, and the rotating shaft 6 is rotatably connected with the corresponding rotating hole, by providing the rotating hole, the rotating shaft 6 can be rotatably connected with the column 2, thereby enabling the smart construction site display screen 4 to be rotated.
[0027] In this embodiment, a threaded hole 7 is opened on the inner wall of one side of the rotating hole, and a locking screw 8 is installed in the inner thread of the threaded hole 7. A knob 9 is fixedly installed on one end of the locking screw 8. The locking screw 8 is adapted to the rotating shaft 6. By providing the locking screw 8, the rotating shaft 6 can be compressed and released, thereby achieving the purpose of fixing and releasing the fixing of the rotating shaft 6.
[0028] In this embodiment, a sealed box 12 is fixedly installed on the top of the base 1, an air outlet 13 is provided on one side of the sealed box 12, a hose is installed between the air outlet 13 and the air outlet pipe 10, and an air inlet 14 is provided on the other side of the sealed box 12. A one-way valve 1 is installed in the air outlet 13, and a one-way valve 2 is installed in the air inlet 14. When the piston plate 15 moves downward, the air outlet 13 can be opened, and when the piston plate 15 moves upward, the air inlet 14 opens.
[0029] In this embodiment, a piston plate 15 is slidably installed in the sealing box 12. The top of the piston plate 15 is rectangular and is installed with multiple fixed rods 16. A pedal 17 is fixedly installed on the top of the multiple fixed rods 16. The pedal 17 can drive the piston plate 15 to move through the fixed rods 16. A plurality of return springs 18 are fixedly installed at the bottom of the pedal 17. The bottom end of the return spring 18 is fixedly installed on the top of the sealing box 12. A sealing groove is opened on the outer side of the piston plate 15. A sealing ring is installed in the sealing groove, and the sealing ring is slidably and sealingly connected to the sealing box 12. By providing the return spring 18, the return spring 18 can push the pedal 17 to reset.
[0030] In the utility model, by rotating the knob 9 and the locking screw 8, under the action of the threaded hole 7, the locking screw 8 can be rotated and moved, and the locking screw 8 can fix and release the rotating shaft 6. By rotating the protective shell 3 and the smart construction site display screen 4, the protective shell 3 can be rotated with the rotating shaft 6 as the center, thereby achieving the purpose of adjusting the placement angle of the smart construction site display screen 4. When the staff squeezes the pedal 17 with their feet, the pedal 17 can compress the reset spring 18, and the pedal 17 drives the piston plate 15 to move downward through the driving rod. The piston plate 15 can squeeze the gas in the sealing box 12, so that the air enters the air outlet pipe 10 through the air outlet pipe 10 and the hose, and the air outlet pipe 10 blows onto the smart construction site display screen 4 through the air outlet head 11, which can achieve the cleaning of the smart construction site display screen 4.
[0031] The above is a detailed introduction to a smart construction site visualization management device provided by the utility model. This article uses specific embodiments to illustrate the principles and implementation methods of the utility model. The description of the above embodiments is only used to help understand the method and core idea of the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
Claims
1. A smart construction site visual management device, characterized in that: It comprises a base (1), a protective shell (3) and a smart construction site display screen (4), wherein the smart construction site display screen (4) is fixedly installed in the protective shell (3), a column (2) is fixedly installed on the top of the base (1), and a rotating mechanism is provided between the protective shell (3) and the column (2); A U-shaped seat (5) is fixedly mounted on one side of the protective shell (3), a rotating shaft (6) is fixedly mounted on the inner walls of both sides of the U-shaped seat (5), and the rotating shaft (6) is rotatably mounted on the stand; An air outlet pipe (10) is fixedly mounted on the top inner wall of the protective shell (3), and a plurality of air outlet heads (11) are mounted on the bottom of the air outlet pipe (10).
2. According to claim 1, a smart construction site visualization management device is characterized in that: The upright column (2) is provided with a rotation hole, and the rotation shaft (6) is rotationally connected to the corresponding rotation hole.
3. The smart construction site visualization management device according to claim 2 is characterized in that: A threaded hole (7) is provided on the inner wall of one side of the rotating hole, a locking screw (8) is installed in the threaded hole (7), a knob (9) is fixedly installed at one end of the locking screw (8), and the locking screw (8) is matched with the rotating shaft (6).
4. The smart construction site visualization management device according to claim 1, characterized in that: A sealing box (12) is fixedly mounted on the top of the base (1), an air outlet (13) is provided on one side of the sealing box (12), a hose is installed between the air outlet (13) and the air outlet pipe (10), and an air inlet (14) is provided on the other side of the sealing box (12).
5. The smart construction site visualization management device according to claim 4, characterized in that: A one-way valve 1 is installed in the air outlet hole (13), and a one-way valve 2 is installed in the air inlet hole (14).
6. The smart construction site visualization management device according to claim 5, characterized in that: A piston plate (15) is slidably mounted in the sealing box (12), a plurality of fixing rods (16) are mounted on the top of the piston plate (15) in a rectangular shape, and pedals (17) are fixedly mounted on the top ends of the plurality of fixing rods (16).
7. The smart construction site visualization management device according to claim 6, characterized in that: A plurality of return springs (18) are fixedly mounted on the bottom of the pedal (17), and the bottom ends of the return springs (18) are fixedly mounted on the top of the sealing box (12).
8. The smart construction site visualization management device according to claim 6, characterized in that: A sealing groove is provided on the outer side of the piston plate (15), a sealing ring is installed in the sealing groove, and the sealing ring is connected to the sealing box (12) in a sliding and sealing manner.
Citation Information
Patent Citations
Intelligent construction site visual management equipment
CN218957190U