Cooling tower with turbidity reduction function for condenser

By designing a backwashing assembly in the cooling tower to backwash the filter, the problem of reducing filtration effect caused by impurities accumulation in the filter layer is solved, ensuring effective cooling of the condenser by the cooling tower.

CN222747859UActive Publication Date: 2025-04-11NINGXIA JINYUHAI CHEM
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421453380.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-04-11
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

In the existing cooling tower, the accumulation of impurities in the filter layer of the filter box leads to a decrease in the filtration effect and speed, affecting the cooling effect of the cooling tower on the equipment.

Method used

A cooling tower for condenser is designed, including a cooling tower body and a filter member. The filter member includes a water inlet pipe, a water outlet pipe, a plurality of filters and backwashing components. The filter is backwashed through the backwashing component to clean up impurities and ensure the filtering effect.

Benefits of technology

Through the use of the backwash assembly, impurities in the filter can be effectively cleaned up, the cooling effect of the cooling tower on the condenser can be maintained, and the filtration effect is reduced due to impurities accumulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222747859U_ABST
    Figure CN222747859U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cooling equipment, and in particular to a cooling tower with a turbidity reduction function for a condenser, wherein the cooling tower is provided with a cooling tower body and a filtering component, the filtering component comprising an inlet pipe, an outlet pipe, N filters and a backwashing component, the backwashing component comprising N control components, the inlet end of the cooling tower body is connected with the outlet end of the condenser, the two ends of the inlet pipe are respectively connected with the outlet end of the cooling tower body and the upper ends of each filter, a control component is arranged on the pipeline between the upper end of each filter and the corresponding first flow outlet, a water pump is arranged on the pipeline between the cooling tower body and the inlet pipe, the two ends of the outlet pipe are respectively connected with the lower ends of each filter and the inlet end of the condenser; wherein N≥2, in this way, by closing the pipeline between the upper end of a filter and the inlet pipe, the cooling water in the outlet pipe flows from the lower end of the filter to the control component, so that the filter is flushed to clean the impurities accumulated in the filter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cooling equipment, in particular to a cooling tower with a turbidity reduction function for a condenser. Background Art

[0002] A cooling tower is a device that uses water as a circulating coolant to absorb heat from equipment that needs to be cooled and discharge it into the atmosphere to ensure the normal operation of the equipment. Its principle is to use the contact between water and air to generate steam, and to take away heat through the volatilization of steam to lower the water temperature and achieve the purpose of cooling.

[0003] However, during the use of the cooling tower, the air entering the cooling tower carries impurities such as dust, which causes suspended matter such as scale and algae to form in the cooling tower. These suspended matter enters the pipe with the circulation of cooling water, reducing the thermal conductivity of the cooling water, resulting in the equipment that needs to be cooled cannot be completely cooled, and severe equipment damage may be caused.

[0004] To solve the above technical problems, the technical solution of the Chinese utility model patent announcement with patent application number CN201922293896.8 is a cooling tower, comprising a cooling tower body, an immersion type ultraviolet sterilization lamp, a filter box and a water pump, wherein a spray pipe, a filler and a water pool are sequentially arranged from top to bottom inside the cooling tower body, a plurality of sockets connected to the inside of the water pool are opened on one side of the water pool, and the immersion type ultraviolet sterilization lamp is inserted into the inside of the water pool through the sockets; the filter box and the water pump are fixed on the top of the cooling tower body, a water outlet is opened at the bottom of the filter box, and a pebble filter layer, a quartz sand filter layer and a sponge filter layer are sequentially arranged inside the filter box from top to bottom; the water inlet end of the water pump is connected to the water outlet of the filter box through a water inlet pipe, the water outlet end of the water pump is connected to a water supply pipe, and the other end of the water supply pipe passes through the top of the cooling tower body and is connected to the spray pipe.

[0005] However, the above-mentioned prior art has the following technical problems: in the above-mentioned cooling tower, impurities in the cooling water are filtered through the pebble filter layer, quartz sand filter layer and sponge filter layer in the filter box. After filtering for a period of time, the impurities in the cooling water are accumulated in the pebble filter layer, quartz sand filter layer and sponge filter layer of the filter box, resulting in a decrease in the filtering effect and filtering speed of the filter box on the cooling water, affecting the cooling effect of the cooling tower on the equipment. Utility Model Content

[0006] In view of this, it is necessary to provide a cooling tower with a turbidity reduction function for the condenser to clean up the impurities accumulated in the filter and ensure that the cooling effect of the cooling tower on the condenser will not be affected by the impurities.

[0007] The utility model provides a cooling tower with a turbidity reduction function for a condenser, comprising a cooling tower body and a filtering component, the filtering component comprising an inlet pipe, an outlet pipe, N filters and a backwashing assembly, the inlet pipe is provided with a first inlet and N first outlets, the backwashing assembly comprises N control components, the outlet pipe is provided with N second inlets and second outlets, the inlet end of the cooling tower body is connected with the outlet end of the condenser, the outlet end is connected with the first inlet, a water pump is installed on the pipeline between the outlet end of the cooling tower body and the first inlet, the upper end of each filter is respectively connected with the corresponding first outlets on the inlet pipe, and the lower end is respectively connected with the corresponding second inlet on the outlet pipe, a control component is arranged on the pipeline between the upper end of each filter and the corresponding first outlet for backwashing the filter, the second outlet is connected with the inlet end of the condenser; wherein, N≥2.

[0008] Preferably, the backwash component further comprises a drain pipe, and the drain pipe is provided with N third inlets and third outlets for discharging the backwash liquid generated by the backwashing.

[0009] Preferably, each control component is an electric three-way valve, which has a water inlet at the top, a first water outlet at the bottom, and a second water outlet at the side. The water inlet is connected to a first flow outlet, the first water outlet is connected to the upper end of the corresponding water filter, and the second water outlet is connected to a third flow inlet on the sewage pipe.

[0010] Preferably, the cooling tower with turbidity reduction function for the condenser is also provided with a sewage pool, and the sewage pool is connected to the third flow outlet.

[0011] Preferably, a first electronic pressure gauge is installed on the pipeline between the upper end of each filter and the corresponding first flow outlet, and a second electronic pressure gauge is installed on the pipeline between the lower end of each filter and the corresponding second flow inlet.

[0012] Preferably, the cooling tower with turbidity reduction function for the condenser is also provided with a control terminal, and the control terminal is electrically connected to each electric three-way valve, each first electronic pressure gauge and each second electronic pressure gauge, and each first electronic pressure gauge and each second electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal determines whether the current filter needs to be backwashed according to the data uploaded by the first electronic pressure gauge and the second electronic pressure gauge corresponding to each filter; the control terminal is also used to control the switching of the electric three-way valve corresponding to the filter when the current filter needs to be backwashed, so as to backwash the filter.

[0013] Preferably, a third electronic pressure gauge is installed on the pipeline between the first inlet and the water outlet of the cooling tower body, and a fourth electronic pressure gauge is installed on the pipeline between the second inlet and the water inlet of the condenser.

[0014] Preferably, the cooling tower with turbidity reduction function for the condenser is also provided with a control terminal, and the control terminal is electrically connected to each electric three-way valve, the third electronic pressure gauge and the fourth electronic pressure gauge, and the third electronic pressure gauge and the fourth electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal is used to determine whether the filter needs to be backwashed according to the data uploaded by the third electronic pressure gauge and the fourth electronic pressure gauge, and when the filter needs to be backwashed, the electric three-way valves corresponding to each filter are switched in turn to backwash each filter in turn.

[0015] Preferably, each filter is provided with a quartz sand filter layer, and the particle size of the quartz sand in the quartz sand filter layer gradually increases from top to bottom.

[0016] The cooling tower with turbidity reduction function for the above-mentioned condenser is provided with a cooling tower body and a filtering component, the filtering component includes an inlet pipe, an outlet pipe, N filters and a backwashing assembly, the inlet pipe is provided with a first inlet and N first outlets, the backwashing assembly includes N control components, the outlet pipe is provided with N second inlets and second outlets, the water inlet end of the cooling tower body is connected with the water outlet end of the condenser, the water outlet end is connected with the first inlet, a water pump is installed on the pipeline between the cooling tower body and the first inlet, the upper end of each filter is respectively connected with the corresponding first outlets on the water inlet pipe, and the lower end is respectively connected with the corresponding second inlet on the water outlet pipe, a control component is arranged on the pipeline between the upper end of each filter and the corresponding first outlet for backwashing the filter, and the second outlet is connected with the first outlet for backwashing the filter. The outlet is connected with the water inlet end of the condenser; wherein, N≥2, so that when the filter is filtering, the control component corresponding to the filter connects the pipeline between the upper end of the filter and the corresponding first flow outlet, so that the cooling water in the water inlet pipe enters the filter for filtration, and then flows into the water outlet pipe from the lower end of the filter, and finally flows into the condenser through the water outlet pipe for cooling; when the filter is backwashed, the control component corresponding to the filter closes the pipeline between the upper end of the filter and the corresponding first flow outlet, so that the cooling water in the water outlet pipe flows in from the lower end of the filter, flows to the control component after flushing the filter, and then is discharged to the outside through the control component, thereby cleaning the impurities accumulated in the filter and ensuring that the cooling effect of the cooling tower on the condenser will not be affected by the impurities. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is an oblique bird's-eye view of a cooling tower with a turbidity reduction function for a condenser of the present application.

[0018] Figure 2 This is an oblique bird's-eye view from another perspective of the cooling tower with turbidity reduction function for the condenser of the present application.

[0019] Figure 3 It is an oblique top view of the filter component of the present application.

[0020] Figure 4 This is an oblique bird's-eye view of the filter component of the present application from another perspective.

[0021] In the figure: a cooling tower 10 with a turbidity reduction function for a condenser, a cooling tower body 20, a filtering component 30, a water inlet pipe 31, a water outlet pipe 32, a filter 33, a backwashing component 34, a control component 341, a sewage pipe 342, a water pump 40, and a sewage tank 50. DETAILED DESCRIPTION

[0022] The technical scheme and technical effects of the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings of the present invention.

[0023] Please refer to Figures 1 to 4The utility model provides a cooling tower 10 with a turbidity reduction function for a condenser, comprising a cooling tower body 20 and a filter component 30, the filter component 30 comprising an inlet pipe 31, an outlet pipe 32, N filters 33 and a backwashing assembly 34, the inlet pipe 31 is provided with a first inlet and N first outlets, the backwashing assembly 34 comprises N control components 341, the outlet pipe 32 is provided with N second inlets and second outlets, the inlet end of the cooling tower body 20 is connected with the outlet end of the condenser, the outlet end is connected with the first inlet, a water pump 40 is installed on the pipeline between the outlet end of the cooling tower body 20 and the first inlet, for pumping cooling water from the outlet end of the cooling tower body 20 into the inlet pipe 31, the upper end of each filter 33 is respectively connected with the corresponding first outlets on the inlet pipe 31, the lower end is respectively connected with the corresponding second inlet on the outlet pipe 32, and a control component 34 is arranged on the pipeline between the upper end of each filter 33 and the corresponding first outlet 1, used for backwashing the filter 33, the second outflow port is connected to the water inlet end of the condenser; wherein N≥2, so that when the filter 33 is filtering, the control component 341 corresponding to the filter 33 connects the pipeline between the upper end of the filter 33 and the corresponding first outflow port, so that the cooling water in the water inlet pipe 31 enters the filter 33 for filtration, then flows into the water outlet pipe 32 from the lower end of the filter 33, and finally flows into the condenser through the water outlet pipe 32 for cooling; when the filter 33 is backwashed, the control component 341 corresponding to the filter 33 closes the pipeline between the upper end of the filter 33 and the corresponding first outflow port, so that the cooling water in the water outlet pipe 32 flows in from the lower end of the filter 33, flows to the control component 341 after flushing the filter 33, and then is discharged to the outside through the control component 341, thereby cleaning the impurities accumulated in the filter 33 and ensuring that the cooling effect of the cooling tower on the condenser will not be affected by the impurities.

[0024] Furthermore, the backwash component 34 also includes a drain pipe 342, which is provided with N third inlets and third outlets. The third inlet is connected to the second outlet for discharging the backwash liquid generated by the backwashing.

[0025] Furthermore, each control member 341 is an electric three-way valve, the top of the electric three-way valve is provided with a water inlet, the bottom of the electric three-way valve is provided with a first water outlet, and the side of the electric three-way valve is provided with a second water outlet. The water inlet is connected to a first flow outlet, the first water outlet is connected to the upper end of the corresponding water filter, and the second water outlet is connected to a third flow inlet on the sewage pipe 342. When the filter 33 is filtering, the electric three-way valve connected to the filter is closed to close the second water outlet and open the water inlet and the first water outlet, so that the cooling water in the water inlet pipe 31 flows into the filter from the upper end of the filter 33. , the cooling water is filtered in the filter 33, and the filtered cooling water finally flows into the outlet pipe 32 from the lower end of the filter 33; when the filter 33 is backwashed, the electric three-way valve connected to the filter closes the first water outlet and opens the water inlet and the second water outlet, so that the cooling water in the outlet pipe 32 flows into the filter 33 from the lower end of the filter 33, and the cooling water flows from the bottom of the filter 33 to the top of the filter 33, and the filter 33 is backwashed, and the backwashing liquid generated by the backwashing flows into the sewage pipe from the second water outlet.

[0026] Furthermore, the cooling tower 10 with turbidity reduction function for the condenser is also provided with a sewage pool 50, and the sewage pool 50 is connected to the third flow outlet to collect the backwash liquid generated when the filter 33 is backwashed into the sewage pool 50, waiting to be reused after purification.

[0027] When backwashing the filter, it can be achieved through the following two implementations:

[0028] Implementation Method 1

[0029] In this embodiment, it is considered to detect the pressure difference before and after filtration of each filter to perform targeted backwashing. Specifically, in this embodiment, a first electronic pressure gauge is installed on the pipeline between the upper end of each filter 33 and the corresponding first outlet, and a second electronic pressure gauge is installed on the pipeline between the lower end of each filter 33 and the corresponding second inlet, so as to judge whether the filter 33 needs to be backwashed by the pressure difference between the first electronic pressure gauge and the second electronic pressure gauge.

[0030] In this embodiment, the cooling tower 10 with turbidity reduction function for the condenser is also provided with a control terminal, which is electrically connected to each electric three-way valve, each first electronic pressure gauge and each second electronic pressure gauge, and each first electronic pressure gauge and each second electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal determines whether the current filter needs to be backwashed according to the data uploaded by the first electronic pressure gauge and the second electronic pressure gauge corresponding to each filter; the control terminal is also used to control the switching of the electric three-way valve corresponding to the filter when the current filter needs to be backwashed, so as to backwash the filter. In this way, the control terminal obtains each pressure difference according to the pressure data received between each first electronic pressure gauge and the second electronic pressure gauge. When the pressure difference between the first electronic pressure gauge and the second electronic pressure gauge corresponding to one of the filters 33 reaches a predetermined pressure difference, the electric three-way valve corresponding to the filter 33 is controlled to close the first water outlet and open the second water outlet, and the filter 33 is backwashed. After a predetermined time, the electric three-way valve is controlled to close the second water outlet and open the first water outlet, and the backwashing operation of the filter 33 is ended, so that the filter 33 continues to perform the filtering operation.

[0031] Implementation Method 2

[0032] In this embodiment, it is considered to detect the pressure difference of the total pipeline of each filter and perform backwashing of all filters accordingly. Specifically, in this embodiment, in the second embodiment, a third electronic pressure gauge is installed on the pipeline between the first inlet and the water outlet of the cooling tower body 20, and a fourth electronic pressure gauge is installed on the pipeline between the second inlet and the water inlet of the condenser, so as to determine whether there is a filter 33 that needs to be backwashed by the pressure difference between the third electronic pressure gauge and the fourth electronic pressure gauge.

[0033] In this embodiment, the cooling tower 10 with turbidity reduction function for the condenser is also provided with a control terminal, which is electrically connected to each electric three-way valve, the third electronic pressure gauge and the fourth electronic pressure gauge. The third electronic pressure gauge and the fourth electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal is used to determine whether the filter needs to be backwashed according to the data uploaded by the third electronic pressure gauge and the fourth electronic pressure gauge, and control the switching of the electric three-way valves corresponding to each filter in sequence when the filter needs to be backwashed, so as to perform backwashing operations on each filter in sequence. In this way, the control terminal calculates the pressure difference according to the water pressure data detected by the third electronic pressure gauge and the fourth electronic pressure gauge received. When the pressure difference between the third electronic pressure gauge and the fourth pressure gauge reaches a predetermined pressure difference, each electric three-way valve is controlled in sequence to close the first water outlet and open the second water outlet, and each filter 33 is backwashed in sequence. After the backwashing operation is completed, each electric three-way valve is controlled in sequence to close the second water outlet and open the first water outlet, and the backwashing operation of each filter 33 is terminated, so that each filter 33 continues to perform filtering operation.

[0034] Furthermore, each filter 33 is provided with a quartz sand filter layer, and the quartz sand particle size in the quartz sand filter layer gradually increases from top to bottom to avoid continuous precipitation of tiny impurities in the gaps between the lower particles. It can also increase the contact area between the top surface of the quartz sand filter layer and the cooling water, thereby improving the treated water flow rate and filtration efficiency; and because the impurities are accumulated on the top surface of the quartz sand filter layer, the impurities can be quickly rinsed away when the filter 33 is backwashed.

[0035] The utility model uses the backwash component 34 to simultaneously perform backwash operations on each filter 33 in the filter component 30 while filtering the cooling water in the cooling tower, so as to remove impurities accumulated on the quartz sand filter layer, thereby eliminating the need to shut down the cooling tower and the condenser when cleaning the filter 33, thereby improving work efficiency.

[0036] The cooling tower 10 with turbidity reduction function for the condenser provided by the utility model can be used not only for cooling the condenser but also for other equipment requiring cooling by the cooling tower.

[0037] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cooling tower with turbidity reduction function for a condenser, characterized in that: It includes a cooling tower body and a filtering component, the filtering component includes an inlet pipe, an outlet pipe, N filters and a backwashing assembly, the inlet pipe is provided with a first inlet and N first outlets, the backwashing assembly includes N control components, the outlet pipe is provided with N second inlets and second outlets, the water inlet end of the cooling tower body is connected with the water outlet end of the condenser, the water outlet end is connected with the first inlet, a water pump is installed on the pipeline between the water outlet end of the cooling tower body and the first inlet, the upper end of each filter is respectively connected with the corresponding first outlets on the inlet pipe, and the lower end is respectively connected with the corresponding second inlet on the outlet pipe, a control component is arranged on the pipeline between the upper end of each filter and the corresponding first outlet for backwashing the filter, and the second outlet is connected with the water inlet end of the condenser; wherein N≥2.

2. The cooling tower with turbidity reduction function for the condenser according to claim 1, characterized in that: The backwash component also includes a drain pipe, which is provided with N third inlets and third outlets for discharging the backwash liquid generated by the backwash.

3. The cooling tower with turbidity reduction function for the condenser according to claim 1, characterized in that: Each control component is an electric three-way valve, which has a water inlet at the top, a first water outlet at the bottom, and a second water outlet at the side. The water inlet is connected to a first flow outlet, the first water outlet is connected to the upper end of the corresponding water filter, and the second water outlet is connected to a third flow inlet on the sewage pipe.

4. The cooling tower with turbidity reduction function for the condenser according to claim 3, characterized in that: The cooling tower with turbidity reduction function for the condenser is also provided with a sewage pool, and the sewage pool is connected to the third flow outlet.

5. The cooling tower with turbidity reduction function for the condenser according to claim 4, characterized in that: A first electronic pressure gauge is installed on the pipeline between the upper end of each filter and the corresponding first flow outlet, and a second electronic pressure gauge is installed on the pipeline between the lower end of each filter and the corresponding second flow inlet.

6. The cooling tower with turbidity reduction function for the condenser according to claim 5, characterized in that: The cooling tower with turbidity reduction function for the condenser is also provided with a control terminal, which is electrically connected to each electric three-way valve, each first electronic pressure gauge and each second electronic pressure gauge, and each first electronic pressure gauge and each second electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal determines whether the current filter needs to be backwashed based on the data uploaded by the first electronic pressure gauge and the second electronic pressure gauge corresponding to each filter; the control terminal is also used to control the switching of the electric three-way valve corresponding to the filter when the current filter needs to be backwashed, so as to backwash the filter.

7. The cooling tower with turbidity reduction function for the condenser according to claim 4, characterized in that: A third electronic pressure gauge is installed on the pipeline between the first flow inlet and the water outlet of the cooling tower body, and a fourth electronic pressure gauge is installed on the pipeline between the second flow outlet and the water inlet of the condenser.

8. The cooling tower with turbidity reduction function for the condenser according to claim 7, characterized in that: The cooling tower with turbidity reduction function for the condenser is also provided with a control terminal, which is electrically connected to each electric three-way valve, a third electronic pressure gauge and a fourth electronic pressure gauge. The third electronic pressure gauge and the fourth electronic pressure gauge are used to upload the collected pressure data to the control terminal; the control terminal is used to determine whether the filter needs to be backwashed according to the data uploaded by the third electronic pressure gauge and the fourth electronic pressure gauge, and when the filter needs to be backwashed, the electric three-way valves corresponding to each filter are switched in turn to backwash each filter in turn.

9. The cooling tower with turbidity reduction function for a condenser according to claim 1, characterized in that: Each filter is provided with a quartz sand filter layer, and the particle size of the quartz sand in the quartz sand filter layer increases gradually from top to bottom.

Citation Information

Patent Citations

  • Cooling tower

    CN211451931U