A cable installation frame with good stability for construction engineering

By designing a cable mount that includes a limit frame, a support frame and a traction assembly, the problems of troublesome and inconvenient maintenance of cables in the existing technology are solved, and higher convenience and stability are achieved.

CN222750049UActive Publication Date: 2025-04-11HUBEI YUGAO ELECTRIC POWER ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421442317.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-04-11
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

The existing cable mount is troublesome when installed at high places and is inconvenient for maintenance.

Method used

A cable mount is designed including a limit frame assembly, a support frame assembly and a traction assembly. Through the use of these components, stable limit and convenient maintenance of the cable are achieved.

Benefits of technology

It improves the convenience and stability of the cable mount and simplifies the installation and maintenance process of high-altitude cables.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222750049U_ABST
    Figure CN222750049U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable installation frame with good stability for construction engineering, comprising a limiting frame assembly and a supporting frame assembly, a traction assembly is connected between the limiting frame assembly and the supporting frame assembly, and a wire storage frame is arranged between the traction assembly and the supporting frame assembly; the supporting frame assembly comprises a first fixing plate; the cable installation frame with good stability for construction engineering, through the setting of the supporting frame assembly, is used in conjunction with the traction assembly and the limiting frame assembly, firstly, the cable to be arranged is inserted into the wire storage frame, the supporting frame assembly and the traction assembly are fixed by the first fixing plate and the second fixing plate, the pull rope is passed through between two rollers of the second limiting frame and between two rollers of the first limiting frame in sequence, and finally the pull rope is tightened to fix the pull ring on the hook, so as to complete the limiting of the wire storage frame and the cable in the wire storage frame, and when maintenance is required, the pull ring is removed, and the pull rope is lowered, and under the action of gravity, the wire storage frame falls for operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction engineering, in particular to a cable installation rack with good stability for construction engineering. Background Art

[0002] Construction projects refer to the engineering entities formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities.

[0003] The existing technology has the following problems:

[0004] In the prior art, the cable installation rack is generally fixed. In some cases where the installation position is high, the installation operation is troublesome and inconvenient for maintenance. Therefore, it is necessary to design a cable installation rack with good stability for construction projects that is easy to operate. Utility Model Content

[0005] In view of the problems in the related technology, the utility model provides a cable installation rack with good stability for construction engineering to overcome the above technical problems existing in the existing related technology.

[0006] To this end, the specific technical solution adopted by the utility model is as follows: a cable installation frame with good stability for construction engineering, comprising a limit frame assembly and a support frame assembly, a traction assembly is connected between the limit frame assembly and the support frame assembly, and a wire storage frame is arranged between the traction assembly and the support frame assembly;

[0007] The support frame assembly includes a first fixing plate, and a second limiting frame is fixedly connected to the bottom of the first fixing plate.

[0008] Preferably, the number of the second limiting frames is two, and an upper clamping seat is fixedly connected between the two second limiting frames.

[0009] Preferably, the second limit frame comprises a limit frame, an upper limit roller is movably connected to the inner wall of the limit frame, and a lower limit roller is movably connected to the inner wall of the limit frame.

[0010] Preferably, the upper clamping seat includes an upper limit plate, and the bottom of the upper limit plate is fixedly connected to two side limit plates; through the setting of the support frame assembly and used in conjunction with the traction assembly and the limit frame assembly, first, the cable to be arranged is inserted into the wire storage frame, the support frame assembly and the traction assembly are fixed by the first fixed plate and the second fixed plate, the pull rope is passed through the two rollers of the second limit frame and the two rollers of the first limit frame in turn, and finally the pull rope is tightened to fix the pull ring on the hook, completing the limiting of the wire storage frame and the cable in the wire storage frame. When maintenance is required, the pull ring is removed and the pull rope is lowered. Under the action of gravity, the wire storage frame falls and the operation is performed, which improves the use effect of the device and provides convenience for the user.

[0011] Preferably, the limiting frame assembly comprises a side fixing frame, and an outer wall of the side fixing frame is fixedly connected with a first limiting frame.

[0012] Preferably, a hook is fixedly connected to the outer wall of the side fixing frame, and a fixing hole is formed on the outer wall of the side fixing frame.

[0013] Preferably, the first limit frame is tilted, and the internal structure of the first limit frame is the same as the internal structure of the second limit frame; through the setting of the limit frame assembly, the pulling direction of the pull rope can be adjusted and the pull rope can be fixed, which improves the use effect of the device and provides convenience for the user.

[0014] Preferably, the traction assembly includes a second fixed plate, the bottom of the second fixed plate is fixedly connected with a pull rope, one end of the pull rope is fixedly connected with a pull ring, and the pull rope passes through between the two rollers of the second limit frame and between the two rollers of the first limit frame in sequence, and is finally fixed to the hook through the pull ring; through the setting of the traction assembly, in use, by cooperating with the support frame assembly, it can achieve a limiting effect on the wire storage frame and the cable in the wire storage frame, and by loosening and tightening the pull rope, the position of the wire storage frame and the cable in the wire storage frame can be adjusted, thereby improving the use effect of the device and providing convenience for the user.

[0015] The beneficial effects of the utility model are as follows: 1. The cable installation frame with good stability for construction engineering is used in conjunction with the traction assembly and the limit frame assembly through the setting of the support frame assembly. First, the cables to be arranged are inserted into the wire storage frame, and the support frame assembly and the traction assembly are fixed by the first fixing plate and the second fixing plate. The pull rope is passed through the two rollers of the second limit frame and the two rollers of the first limit frame in sequence, and finally the pull rope is tightened to fix the pull ring on the hook to complete the limiting of the wire storage frame and the cables in the wire storage frame. When maintenance is required, the pull ring is removed and the pull rope is lowered. Under the action of gravity, the wire storage frame falls and the operation is performed, which improves the use effect of the device and provides convenience for the user.

[0016] 2. The cable installation frame with good stability for construction engineering can adjust the pulling direction of the pull rope and fix the pull rope through the setting of the limit frame assembly, thereby improving the use effect of the device and providing convenience for users.

[0017] 3. The cable installation frame with good stability for construction projects can limit the wire storage frame and the cables in the wire storage frame by setting the traction component and cooperating with the support frame component during use. The position of the wire storage frame and the cables in the wire storage frame can be adjusted by loosening and tightening the pull rope, thereby improving the use effect of the device and providing convenience for users. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 This is the front view of the utility model;

[0020] Figure 2 It is a structural schematic diagram of the support frame assembly of the utility model;

[0021] Figure 3 This is a schematic diagram of the structure of the second limiting frame of the utility model;

[0022] Figure 4 It is a structural schematic diagram of the upper card seat of the utility model;

[0023] Figure 5 This is a schematic diagram of the structure of the limit frame assembly of the utility model;

[0024] Figure 6 It is a structural schematic diagram of the traction assembly of the utility model.

[0025] In the figure: 1. limit frame assembly; 101. side fixing frame; 102. first limit frame; 103. hook; 2. support frame assembly; 201. first fixing plate; 202. second limit frame; 2021. limit frame; 2022. upper limit roller; 2023. lower limit roller; 203. upper clamping seat; 2031. upper limit plate; 2032. side limit plate; 3. traction assembly; 301. second fixing plate; 302. pull rope; 303. pull ring; 4. wire storage frame. DETAILED DESCRIPTION

[0026] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.

[0027] According to an embodiment of the utility model, a cable installation rack with good stability for construction engineering is provided.

[0028] Embodiment 1;

[0029] like Figure 1-Figure 6 As shown, according to an embodiment of the utility model, a cable installation frame with good stability for construction engineering includes a limit frame assembly 1 and a support frame assembly 2, a traction assembly 3 is connected between the limit frame assembly 1 and the support frame assembly 2, and a wire storage frame 4 is provided between the traction assembly 3 and the support frame assembly 2;

[0030] The support frame assembly 2 includes a first fixing plate 201, and a second limiting frame 202 is fixedly connected to the bottom of the first fixing plate 201;

[0031] There are two second limiting frames 202, and an upper clamping seat 203 is fixedly connected between the two second limiting frames 202;

[0032] The second limit frame 202 includes a limit frame 2021, an upper limit roller 2022 is movably connected to the inner wall of the limit frame 2021, and a lower limit roller 2023 is movably connected to the inner wall of the limit frame 2021;

[0033] The upper clamping seat 203 includes an upper limit plate 2031 , and two side limit plates 2032 are fixedly connected to the bottom of the upper limit plate 2031 .

[0034] In this embodiment, through the setting of the support frame assembly 2, and in conjunction with the traction assembly 3 and the limit frame assembly 1, first, the cables to be arranged are inserted into the wire storage frame 4, and the support frame assembly 2 and the traction assembly 3 are fixed by the first fixing plate 201 and the second fixing plate 301, and the pull rope 302 is passed through the two rollers of the second limit frame 202 and the two rollers of the first limit frame 102 in turn, and finally the pull rope 302 is tightened to fix the pull ring 303 on the hook 103, completing the limiting of the wire storage frame 4 and the cables in the wire storage frame 4. When maintenance is required, the pull ring 303 is removed and the pull rope 302 is lowered. Under the action of gravity, the wire storage frame 4 falls and the operation is performed, which improves the use effect of the device and provides convenience for the user.

[0035] Embodiment 2:

[0036] On the basis of the first embodiment, the preferred embodiment of the cable installation rack with good stability for construction engineering provided by the utility model is as follows Figure 1-Figure 6 As shown: the limiting frame assembly 1 includes a side fixing frame 101, and the outer wall of the side fixing frame 101 is fixedly connected to a first limiting frame 102;

[0037] The outer wall of the side fixing frame 101 is fixedly connected with a hook 103, and the outer wall of the side fixing frame 101 is provided with a fixing hole;

[0038] The first limiting frame 102 is tilted, and the internal structure of the first limiting frame 102 is the same as the internal structure of the second limiting frame 202 .

[0039] In this embodiment, by setting the limiting frame assembly 1, the pulling direction of the pull rope 302 can be adjusted and the pull rope 302 can be fixed, which improves the use effect of the device and provides convenience for the user.

[0040] Embodiment three;

[0041] On the basis of the first embodiment, the preferred embodiment of the cable installation rack with good stability for construction engineering provided by the utility model is as follows Figure 1-Figure 6 As shown: the traction assembly 3 includes a second fixed plate 301, a pull rope 302 is fixedly connected to the bottom of the second fixed plate 301, one end of the pull rope 302 is fixedly connected to a pull ring 303, and the pull rope 302 passes through between the two rollers of the second limit frame 202 and between the two rollers of the first limit frame 102 in sequence, and is finally fixed to the hook 103 through the pull ring 303.

[0042] In this embodiment, by setting the traction component 3, during use, by cooperating with the support frame component 2, it is possible to achieve a limiting effect on the wire storage frame 4 and the cables in the wire storage frame 4, and by loosening and tightening the pull rope 302, the position of the wire storage frame 4 and the cables in the wire storage frame 4 can be adjusted, thereby improving the use effect of the device and providing convenience for the user.

[0043] In order to facilitate understanding of the above technical solution of the present invention, the working principle or operation method of the present invention in the actual process is described in detail below.

[0044] In actual application, first, insert the cables to be arranged into the wire storage frame 4, fix the support frame assembly 2 and the traction assembly 3 by the first fixed plate 201 and the second fixed plate 301, pass the pull rope 302 through the two rollers of the second limit frame 202 and the two rollers of the first limit frame 102 in turn, and finally tighten the pull rope 302 to fix the pull ring 303 on the hook 103, so as to complete the limiting of the wire storage frame 4 and the cables in the wire storage frame 4. When maintenance is required, remove the pull ring 303 and put down the pull rope 302. Under the action of gravity, the wire storage frame 4 falls and the operation is carried out.

[0045] In summary, with the aid of the above-mentioned technical scheme of the utility model, the cable installation frame with good stability for the construction project is used in conjunction with the traction assembly 3 and the limiting frame assembly 1 through the setting of the support frame assembly 2. First, the cables to be arranged are inserted into the wire storage frame 4, and the support frame assembly 2 and the traction assembly 3 are fixed by the first fixing plate 201 and the second fixing plate 301. The pull rope 302 is passed through the two rollers of the second limiting frame 202 and the two rollers of the first limiting frame 102 in turn, and finally the pull rope 302 is tightened to fix the pull ring 303 on the hook 103, so as to complete the limiting of the wire storage frame 4 and the cables in the wire storage frame 4. When maintenance is required, the pull ring 303 is removed and By lowering the pull rope 302, the wire storage frame 4 falls under the action of gravity and the operation is performed, which improves the use effect of the device and provides convenience for the user; through the setting of the limit frame assembly 1, the pulling direction of the pull rope 302 can be adjusted and the pull rope 302 can be fixed, which improves the use effect of the device and provides convenience for the user; through the setting of the traction assembly 3, during use, by cooperating with the support frame assembly 2, the wire storage frame 4 and the cables in the wire storage frame 4 can be limited, and the position of the wire storage frame 4 and the cables in the wire storage frame 4 can be adjusted by loosening and tightening the pull rope 302, which improves the use effect of the device and provides convenience for the user.

[0046] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cable installation frame with good stability for construction engineering, comprising a limit frame assembly (1) and a support frame assembly (2), characterized in that: A traction assembly (3) is connected between the limiting frame assembly (1) and the supporting frame assembly (2), and a wire storage frame (4) is provided between the traction assembly (3) and the supporting frame assembly (2); The support frame assembly (2) comprises a first fixing plate (201), and a second limiting frame (202) is fixedly connected to the bottom of the first fixing plate (201).

2. A cable installation frame with good stability for construction engineering according to claim 1, characterized in that: The number of the second limiting frames (202) is two, and an upper clamping seat (203) is fixedly connected between the two second limiting frames (202).

3. A cable installation frame with good stability for construction engineering according to claim 1, characterized in that: The second limit frame (202) comprises a limit frame (2021), the inner wall of the limit frame (2021) being movably connected to an upper limit roller (2022), and the inner wall of the limit frame (2021) being movably connected to a lower limit roller (2023).

4. A cable installation frame with good stability for construction engineering according to claim 2, characterized in that: The upper clamping seat (203) comprises an upper limit plate (2031), and the bottom of the upper limit plate (2031) is fixedly connected to two side limit plates (2032).

5. The cable installation frame with good stability for construction engineering according to claim 1, characterized in that: The limiting frame assembly (1) comprises a side fixing frame (101), and the outer wall of the side fixing frame (101) is fixedly connected to a first limiting frame (102).

6. A cable installation frame with good stability for construction engineering according to claim 5, characterized in that: A hook (103) is fixedly connected to the outer wall of the side fixing frame (101), and a fixing hole is provided on the outer wall of the side fixing frame (101).

7. A cable installation frame with good stability for construction engineering according to claim 6, characterized in that: The first limiting frame (102) is arranged to be inclined, and the internal structure of the first limiting frame (102) is the same as the internal structure of the second limiting frame (202).

8. A cable installation frame with good stability for construction engineering according to claim 7, characterized in that: The traction assembly (3) comprises a second fixing plate (301), a pull rope (302) is fixedly connected to the bottom of the second fixing plate (301), one end of the pull rope (302) is fixedly connected to a pull ring (303), and the pull rope (302) passes through between two rollers of the second limiting frame (202) and between two rollers of the first limiting frame (102) in sequence, and is finally fixed to the hook (103) through the pull ring (303).