Steel-plastic pipe compound machine

By designing a steel-plastic pipe composite machine, the steel pipe is quickly sent to the clamping assembly by using feeding racks and lifting support components for processing, solving the problem of time-consuming and inefficient loading process and achieving efficient steel-plastic pipe processing.

CN222756094UActive Publication Date: 2025-04-15HANDAN ZHENGDA PIPE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421564151.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-15
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

The traditional process of loading plastic-lined steel pipes to clamping fixtures is time-consuming and inefficient.

Method used

A steel-plastic pipe composite machine is designed, and the steel pipe is sent to the top of the lifting support assembly using a feed rack, and the end of the steel pipe is clamped by the clamping assembly for processing, which improves working efficiency.

Benefits of technology

Through this equipment, the processing efficiency of steel-plastic pipes is greatly improved, manual operation is reduced, and cost is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222756094U_ABST
    Figure CN222756094U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel-plastic pipe compound machine which comprises a machine frame and a walking crown block installed on the top of the machine frame, an intermediate frequency controller, a heating mechanism and a cooling mechanism are connected to the lower portion of the walking crown block, clamping assemblies are further installed on the machine frame, and a plurality of lifting bearing assemblies are arranged between the two clamping assemblies. A water receiving tank is arranged below the lifting bearing assembly, and a feeding assembly is arranged at the front end of the rack. A steel pipe is conveyed to the position above the lifting bearing assembly through the feeding frame, the machined steel-plastic pipe is pushed away through the feeding frame, the steel pipe is jacked up through the lifting bearing assembly so that the clamping assemblies at the two ends can clamp the ends for machining, work efficiency is greatly improved, labor is reduced, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of plastic-lined steel pipe production equipment, in particular to a steel-plastic pipe composite machine. Background Art

[0002] The plastic-lined steel pipe has a plastic pipe inside the steel pipe and a steel pipe structure outside. This structure has many advantages. On the one hand, it has the function of a plastic pipe and can be used to transport hot water or other liquids. Plastic has corrosion resistance and can be heat-insulated. However, since the plastic pipe is very soft, it cannot meet the requirements for high strength requirements. Therefore, adding a steel pipe to the outer end of the plastic pipe can solve these problems. In terms of production technology, we first pull the plastic pipe with a smaller diameter than the steel pipe into the steel pipe through tension, and then transport it to other processes for fixing, and then install a clamping limit and connection device at both ends of the pipe mouth, so that the plastic pipe can be prevented from running out of the steel pipe, and the limit and connection device can be used to connect the various plastic-lined steel pipes together, which is convenient for their use. In this production process, the traditional process of loading the plastic-lined steel pipes into the clamping and fixing device is to put them one by one, then fix them in position, and then install other workpieces at both ends of the plastic-lined steel pipes. This is very time-consuming and inefficient. Utility Model Content

[0003] The purpose of the utility model is to provide a steel-plastic pipe compounding machine to solve the above-mentioned problems.

[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0005] The utility model discloses a steel-plastic pipe composite machine, comprising a frame and a traveling crane installed on the top of the frame, an intermediate frequency controller is connected to the bottom of the traveling crane, a heating mechanism is connected to the bottom of the intermediate frequency controller, and cooling mechanisms are connected to the front and rear ends of the heating mechanism, and two symmetrically arranged clamping assemblies are also installed on the frame, and the ends of the clamping assemblies can pass through the heating mechanism and the cooling mechanism, and a plurality of lifting support assemblies are arranged between the two clamping assemblies, and the lifting support assemblies are installed on the frame, and a water receiving box is arranged below the lifting support assemblies, and the water receiving box is connected to the frame. A loading assembly is provided at the front end of the frame, and the loading assembly includes a first mounting frame and a second mounting frame connected to each other, the second mounting frame is placed above the lifting support assembly, and the horizontal height of the second mounting frame is lower than the horizontal height of the clamping assembly, and a feeding rack is provided on the first mounting frame and the second mounting frame, and a connecting shaft is installed on the feeding rack, and a roller is connected to the end of the connecting shaft, and the roller rolls on the first mounting frame and the second mounting frame, and the feeding rack is controlled to move by a displacement cylinder installed on the first mounting frame, and two support plates are installed on the feeding rack, and a card slot is opened on the support plate.

[0006] Furthermore, the clamping assembly includes a fixing frame fixed on the frame, a plurality of clamping cylinders are installed on the fixing frame, end sleeves are connected to the telescopic ends of the clamping cylinders, and the two ends of the steel pipe are inserted into the two end sleeves.

[0007] Furthermore, the lifting support assembly includes two symmetrically arranged lifting cylinders installed on the frame, and the telescopic ends of the lifting cylinders are vertically upward and connected to a Y-shaped plate.

[0008] Furthermore, a drain pipe is installed on the water receiving box, and a valve is installed on the drain pipe.

[0009] Furthermore, both the first mounting frame and the second mounting frame are provided with limiting rails, and the rollers are placed outside the limiting rails.

[0010] Compared with the prior art, the beneficial technical effects of the utility model are:

[0011] The utility model delivers the steel pipe to the top of the lifting and supporting assembly through the feeding rack, pushes the processed steel-plastic pipe away through the feeding rack, and lifts up the steel pipe through the lifting and supporting assembly to facilitate the clamping assemblies at both ends to clamp the end for processing, which greatly improves work efficiency, reduces labor and saves costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The utility model will be further described below in conjunction with the accompanying drawings.

[0013] Figure 1This is the front view of the utility model steel-plastic pipe compound machine;

[0014] Figure 2 This is the main view of the utility model steel-plastic pipe compound machine when in use;

[0015] Figure 3 It is a top view of the loading component;

[0016] Explanation of the reference numerals: 1. Frame; 2. Traveling overhead crane; 3. Intermediate frequency controller; 4. Heating mechanism; 5. Cooling mechanism; 6. Water receiving tank; 7. First mounting frame; 8. Second mounting frame; 9. Feeding frame; 10. Connecting shaft; 11. Roller; 12. Support plate; 13. Slot; 14. Displacement cylinder; 15. Fixed frame; 16. Clamping cylinder; 17. End sleeve; 18. Lifting cylinder; 19. Y-shaped plate; 20. Limiting track. DETAILED DESCRIPTION

[0017] like Figure 1-3 As shown, a steel-plastic pipe composite machine includes a frame 1 and a traveling crane 2 installed on the top of the frame 1, an intermediate frequency controller 3 is connected to the bottom of the traveling crane 2, a heating mechanism 4 is connected to the bottom of the intermediate frequency controller 3, and cooling mechanisms 5 are connected to the front and rear ends of the heating mechanism 4. The traveling crane 2, the intermediate frequency controller 3, the heating mechanism 4 and the cooling mechanism 5 are all existing technologies, and their specific structures are not described in detail here.

[0018] The frame 1 is also equipped with two symmetrically arranged clamping assemblies, which include a fixing frame 15 fixed to the frame 1, and a plurality of clamping cylinders 16 are installed on the fixing frame 15, and the telescopic ends of the clamping cylinders 16 are connected with end sleeves 17, and the two ends of the steel pipe are inserted into the two end sleeves 17, and the end sleeves 17 are provided with a gas injection pressurization mechanism, which is a prior art and the specific structure is not described in detail here. The ends of the clamping assembly can pass through the heating mechanism 4 and the cooling mechanism 5.

[0019] Several groups of lifting and supporting assemblies are arranged between the two clamping assemblies, and the lifting and supporting assemblies are installed on the frame 1. The lifting and supporting assemblies include two symmetrically arranged lifting cylinders 18 installed on the frame 1, and the telescopic ends of the lifting cylinders 18 are vertically upward and connected to the Y-shaped plate 19.

[0020] A water receiving box 6 is provided below the lifting support assembly, and the water receiving box 6 is connected to the frame 1 . A drainage pipe is installed on the water receiving box 6 , and a valve is installed on the drainage pipe.

[0021] A loading assembly is provided at the front end of the frame 1, and the loading assembly includes a first mounting frame 7 and a second mounting frame 8 which are connected to each other. The second mounting frame 8 is placed above the lifting support assembly, and the horizontal height of the second mounting frame 8 is lower than the horizontal height of the clamping assembly. A feeding rack 9 is provided on the first mounting frame 7 and the second mounting frame 8. A connecting shaft 10 is installed on the feeding rack 9, and a roller 11 is connected to the end of the connecting shaft 10. The roller 11 rolls on the first mounting frame 7 and the second mounting frame 8. A limiting rail 20 is provided on the first mounting frame 7 and the second mounting frame 8, and the roller 11 is placed on the outside of the limiting rail 20. The feeding rack 9 is controlled to move by a displacement cylinder 14 installed on the first mounting frame 7. Two support plates 12 are installed on the feeding rack 9, and a card slot 13 is opened on the support plate 12.

[0022] The action process of the utility model is as follows:

[0023] When in use, the steel pipe inserted into the plastic pipe is placed on the card slot 13 until several groups of card slots 13 are placed with steel pipes. When the current group of steel-plastic pipes is processed and placed on the limit track 20 on the second mounting frame 8 through the lifting and supporting assembly, the displacement cylinder 14 controls the feeding rack 9 to advance, and the steel pipe placed on the limit track 20 is pushed away by the feeding rack 9, so that each steel pipe to be processed is placed above the Y-shaped plate 19, and then the lifting cylinder 18 drives the Y-shaped plate 19 to rise, and the steel pipe is lifted up by the Y-shaped plate 19, and then the displacement cylinder 14 is reset to drive the feeding rack 9 to reset, and at the same time, the clamping cylinder 16 drives the end sleeve 17 to clamp the end of the steel pipe and inject gas into the pipe for pressurization, and then the walking crane 2 drives the heating mechanism 4 and the cooling mechanism 5 to move, so that the plastic pipe in the steel pipe sticks to the inner wall of the steel pipe.

[0024] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. A steel-plastic pipe composite machine, comprising a frame (1) and a traveling crane (2) mounted on the top of the frame (1), an intermediate frequency controller (3) being connected below the traveling crane (2), a heating mechanism (4) being connected at the bottom of the intermediate frequency controller (3), a cooling mechanism (5) being connected at both the front and rear ends of the heating mechanism (4), two symmetrically arranged clamping assemblies being mounted on the frame (1), the ends of the clamping assemblies being able to pass through the heating mechanism (4) and the cooling mechanism (5), characterized in that: A plurality of lifting support assemblies are arranged between the two clamping assemblies, the lifting support assemblies are mounted on the frame (1), a water receiving box (6) is arranged below the lifting support assemblies, the water receiving box (6) is connected to the frame (1), a loading assembly is arranged at the front end of the frame (1), the loading assembly comprises a first mounting frame (7) and a second mounting frame (8) connected to each other, the second mounting frame (8) is arranged above the lifting support assemblies, and the horizontal height of the second mounting frame (8) is lower than the horizontal height of the clamping assemblies. The first mounting frame (7) and the second mounting frame (8) are provided with a feeding frame (9), a connecting shaft (10) is installed on the feeding frame (9), the end of the connecting shaft (10) is connected to a roller (11), the roller (11) rolls on the first mounting frame (7) and the second mounting frame (8), the feeding frame (9) is controlled to move by a displacement cylinder (14) installed on the first mounting frame (7), two supporting plates (12) are installed on the feeding frame (9), and a card slot (13) is opened on the supporting plate (12).

2. The steel-plastic pipe compounding machine according to claim 1, characterized in that: The clamping assembly comprises a fixing frame (15) fixed on the frame (1), a plurality of clamping cylinders (16) are installed on the fixing frame (15), and the telescopic ends of the clamping cylinders (16) are connected to end sleeves (17), and the two ends of the steel pipe are inserted into the two end sleeves (17).

3. The steel-plastic pipe compounding machine according to claim 1, characterized in that: The lifting support assembly comprises two symmetrically arranged lifting cylinders (18) mounted on the frame (1), and the telescopic ends of the lifting cylinders (18) are vertically upward and connected to a Y-shaped plate (19).

4. The steel-plastic pipe compounding machine according to claim 1, characterized in that: The water receiving box (6) is provided with a drain pipe, and the drain pipe is provided with a valve.

5. The steel-plastic pipe compounding machine according to claim 1, characterized in that: The first mounting frame (7) and the second mounting frame (8) are both provided with a limiting track (20), and the roller (11) is placed outside the limiting track (20).