Road filling and repairing structure

By excavating three-stage repair troughs on the pavement and repaving the reinforced wire mesh and gravel repair layer, combined with reinforcement ribs and asphalt layer pressed repeatedly, the pavement settlement and re-cracking problems caused by loosening of the ground layer are solved, and the stability and service life of the repair structure are significantly improved.

CN222758686UActive Publication Date: 2025-04-15SHENZHEN MINGRUN ARCHITECTURAL DESIGN CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421596709.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2025-04-15
Estimated Expiration
2034-07-08

AI Technical Summary

Technical Problem

Because the ground layer is eroded by rainwater, the soil and gravel at the bottom will loosen, and the support capacity at the bottom will be insufficient. After being crushed by heavy vehicles for a long time, the repair structure and surrounding road surfaces will settle, which will easily lead to the problem of cracking again.

Method used

The third-level repair trough was excavated on the road surface, and the original gravel cushion layer after being eroded by rainwater was cleaned, and the first reinforced wire mesh and gravel repair layer were repaved. The second reinforced wire mesh was laid on the upper side of the gravel repair layer to support the bottom of the repair structure, and the structural strength of the concrete repair layer was improved through reinforcement ribs, and three layers of asphalt were laid in sequence and pressed multiple times to increase its internal density.

Benefits of technology

By cleaning and repaving the base structure, the stability and support strength of the repair structure are improved, the repair structure and its surrounding road surfaces are avoided, the service life of the road structure is extended, and the cracking is prevented again.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222758686U_ABST
    Figure CN222758686U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of road construction, in particular to a road filling and repairing structure which comprises a rammed earth layer, an original pavement structure is arranged above the rammed earth layer, and the original pavement structure comprises an original broken stone hardcore, an original concrete base layer, an original coarse asphalt layer, an original middle asphalt layer and an original fine asphalt layer. A first repairing groove, a second repairing groove and a third repairing groove are formed in the surface of the original pavement structure, and repairing structures are arranged in the first repairing groove, the second repairing groove and the third repairing groove. The repairing structure comprises a first reinforcing wire mesh, a gravel repairing layer, a second reinforcing wire mesh, reinforcing ribs, a concrete repairing layer, a coarse asphalt repairing layer, a medium asphalt repairing layer and a fine asphalt repairing layer which are sequentially arranged from bottom to top. Part of the base layer eroded by rainwater is completely cleaned, the structural strength of the original base layer is kept, the base layer is laid at the cleaned position again, the base layer and the original base layer keep the same supporting force, then the supporting strength of the repairing structure is improved, and sedimentation in the using process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a road filling and repairing structure. Background Art

[0002] During long-term use, asphalt pavement will be subjected to vehicle rolling and environmental factors, and cracks will appear on its surface. If it is not repaired in time, the accumulated water on the road will enter the base layer through the gaps. The water may carry away the soil layer of the roadbed, or it may form mud with the soil layer and be squeezed out when vehicles roll over the gaps in the road surface, causing damage to the road surface and shortening the service life of the road surface.

[0003] Among them, announcement number CN209798496U discloses a road filling and repairing structure, including a gap between road foundations, which is filled with a leveling layer, a lower sealing layer, an adhesive layer, a reinforcing layer, a waterproof layer, a supporting layer, an asphalt surface layer and an upper sealing layer in sequence from the bottom of the gap to the outside, wherein the leveling layer is formed into a rough surface by planing and milling the old road surface, and the leveling layer, the lower sealing layer, the adhesive layer, the reinforcing layer, the waterproof layer, the supporting layer, the asphalt surface layer and the upper sealing layer are bonded together by caulking glue, and the reinforcing layer is a cage structure made of steel bars. The utility model has the effect of protecting the asphalt surface layer from direct sunlight, reducing the possibility of cracking of the road surface structure, thereby achieving the effect of extending the service life of the road surface structure, and the cage structure made of steel bars is stronger and can withstand certain deformation.

[0004] Although the strength of the repair structure is relatively high, the soil and gravel layers at the bottom will become loose due to the erosion of the base layer by rainwater, and the bottom support capacity is insufficient. After being crushed by heavy vehicles for a long time, the repair structure and the surrounding road surface will sink, which can easily lead to cracking again.

[0005] Therefore, it is necessary to invent a road filling and repairing structure to solve the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a road filling and repairing structure to solve the problem that due to the erosion of the base layer by rainwater, the soil and gravel layer at the bottom will become loose, the supporting capacity of the bottom is insufficient, and after being crushed by heavy vehicles for a long time, the repair structure and the surrounding road surface will sink, which will easily lead to cracking again.

[0007] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a road filling and repairing structure, including a rammed earth layer, an original pavement structure is arranged above the rammed earth layer, the original pavement structure includes an original crushed stone cushion layer, an original concrete base layer, an original coarse asphalt layer, an original medium asphalt layer and an original fine asphalt layer, and a first repair groove, a second repair groove and a third repair groove are opened on the surface of the original pavement structure, and a repair structure is arranged inside the first repair groove, the second repair groove and the third repair groove, and the repair structure includes a first reinforcing wire mesh, a crushed stone repair layer, a second reinforcing wire mesh, reinforcing ribs, a concrete repair layer, a coarse asphalt repair layer, a medium asphalt repair layer and a fine asphalt repair layer, which are arranged in sequence from bottom to top.

[0008] By adopting the above technical solution, a three-level repair groove is excavated on the road surface, the loose original gravel cushion layer eroded by rainwater is cleaned, and the cracks are corrected into regular rectangles. Then, the first reinforced wire mesh and gravel repair layer are re-laid, and then the second reinforced wire mesh is laid on the upper side of the gravel repair layer to support the bottom of the repair structure, further improve the stability of the repair structure, and avoid settlement of the repair structure and the surrounding road surface.

[0009] Optionally, the first repair groove is opened on the surface of the original fine asphalt layer and the original medium asphalt layer.

[0010] By adopting the above technical solution, the first repair groove is opened with the largest range, which is used to increase the surface area of ​​the repaired asphalt. At the same time, it is poorly distributed with the original concrete base at the bottom, effectively preventing rainwater from seeping in.

[0011] Optionally, the second repair groove is opened on the surface of the original rough asphalt layer, the original concrete base layer and the upper half of the original crushed stone cushion layer, and the original concrete base layer is opened with multiple groups of transverse connecting grooves, and the left and right sides of the reinforcing ribs are respectively inserted into the connecting grooves on the left and right sides.

[0012] By adopting the above technical solution, the second repair groove is smaller than the area of ​​the first repair groove, and is used to clean the part of the original concrete base that is eroded by rainwater. At the same time, reinforcing ribs are added inside the original concrete base to further improve the stability of the repair structure.

[0013] Optionally, the third repair groove is opened in the middle section of the original crushed stone cushion layer.

[0014] By adopting the above technical solution, the third repair groove is smaller than the area of ​​the second repair groove and is used to clean the original gravel layer.

[0015] Optionally, the first reinforcing wire mesh is laid on the bottom and sides of the third repair groove, the upper end of the first reinforcing wire mesh extends to the bottom of the second repair groove, the gravel repair layer is filled into the interior of the third repair groove and the second repair groove, and the gravel repair layer is filled until it is flush with the original gravel cushion layer.

[0016] By adopting the above technical solution, the crushed stone cushion layer is re-laid and compacted, and the first reinforcing wire is placed between the original crushed stone cushion layer and the crushed stone repair layer. When the crushed stone repair layer is under pressure, the first reinforcing wire provides a supporting force to improve the stability of the crushed stone repair layer.

[0017] Optionally, the second reinforcing wire mesh is laid on the upper surface of the crushed stone repair layer, and the concrete repair layer is poured on the upper surface of the second reinforcing wire mesh, and the concrete repair layer is flush with the original concrete base layer.

[0018] By adopting the above technical solution, a concrete repair layer is poured on top of the crushed stone repair layer, and the connection strength between the concrete repair layer and the crushed stone repair layer is improved by the second reinforcing wire mesh. At the same time, the structural strength of the concrete repair layer is improved by reinforcing ribs, thereby further improving its supporting strength.

[0019] Optionally, the crude asphalt repair layer is laid on the upper surface of the concrete repair layer, and the crude asphalt repair layer is pressed until it is flush with the original crude asphalt layer.

[0020] Optionally, the medium asphalt repair layer is laid on the upper surface of the coarse asphalt repair layer, and the medium asphalt repair layer is pressed to be flush with the original medium asphalt layer, and the fine asphalt repair layer is laid on the upper surface of the medium asphalt repair layer, and the fine asphalt repair layer is pressed to be flush with the original fine asphalt layer.

[0021] By adopting the above technical solution, three layers of asphalt are laid in sequence and pressed multiple times to increase the internal density and avoid sinking during later use.

[0022] In the above technical solution, the technical effects and advantages provided by the utility model are:

[0023] The utility model excavates a three-level repair groove in the road surface, cleans up the original crushed stone cushion layer that is loose after being eroded by rainwater, then lays a first reinforced wire mesh and a crushed stone repair layer, and then lays a second reinforced wire mesh on the upper side of the crushed stone repair layer to support the bottom of the repair structure, and at the same time improves the structural strength of the concrete repair layer through the cooperation of reinforcing ribs, and then lays three layers of asphalt in sequence and presses it multiple times to improve its internal density, further improve the stability and supporting strength of the repair structure, avoid settlement of the repair structure and the road surface around it, and solve the problem that due to the base layer being soaked and eroded by rainwater, the soil and crushed stone layer at the bottom will become loose, the supporting capacity of the bottom is insufficient, and the repair structure and the surrounding road surface will settle after being crushed by heavy vehicles for a long time, which is easy to cause cracking again. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0025] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;

[0026] Figure 3 This is a schematic diagram of the repair groove structure of the utility model;

[0027] Figure 4 It is a schematic diagram of the repair structure of the utility model.

[0028] Description of reference numerals:

[0029] 1. Rammed earth layer; 11. Original crushed stone cushion layer; 12. Original concrete base layer; 13. Connecting groove; 14. Original coarse asphalt layer; 15. Original medium asphalt layer; 16. Original fine asphalt layer; 17. First repair groove; 18. Second repair groove; 19. Third repair groove; 2. Repair structure; 21. First reinforced wire mesh; 22. Crushed stone repair layer; 23. Second reinforced wire mesh; 24. Reinforcement ribs; 25. Concrete repair layer; 26. Coarse asphalt repair layer; 27. Medium asphalt repair layer; 28. Fine asphalt repair layer. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0031] The utility model provides Figure 1 and Figure 2A road filling and repairing structure shown in the figure comprises a rammed earth layer 1, an original pavement structure is arranged above the rammed earth layer 1, the original pavement structure comprises an original crushed stone cushion layer 11, an original concrete base layer 12, an original coarse asphalt layer 14, an original medium asphalt layer 15 and an original fine asphalt layer 16, a first repair groove 17, a second repair groove 18 and a third repair groove 19 are opened on the surface of the original pavement structure, a repairing structure 2 is arranged inside the first repairing groove 17, the second repairing groove 18 and the third repairing groove 19, and the repairing structure 2 comprises a first reinforcing wire mesh 21, a crushed stone repairing layer 22, a second reinforced wire mesh 21 arranged in sequence from bottom to top, Strong wire mesh 23, reinforcing ribs 24, concrete repair layer 25, coarse asphalt repair layer 26, medium asphalt repair layer 27 and fine asphalt repair layer 28, the first repair groove 17 is opened on the surface of the original fine asphalt layer 16 and the original medium asphalt layer 15, the second repair groove 18 is opened on the surface of the original coarse asphalt layer 14, the original concrete base layer 12 and the upper half of the original crushed stone cushion layer 11, the original concrete base layer 12 is opened with multiple groups of transverse connecting grooves 13, the left and right sides of the reinforcing ribs 24 are respectively inserted into the connecting grooves 13 on the left and right sides, and the third repair groove 19 is opened in the middle section of the original crushed stone cushion layer 11.

[0032] Among them, in the repair process, the cracks are first cut and trimmed into a regular rectangle, and the original gravel cushion layer 11, the original concrete base layer 12, the original coarse asphalt layer 14, the original medium asphalt layer 15 and the original fine asphalt layer 16 that have been eroded by rainwater are cleaned, and then the first reinforced wire mesh 21 and the gravel repair layer 22 are re-laid, and then the second reinforced wire mesh 23 is laid on the upper side of the gravel repair layer 22 to support the bottom of the repair structure 2, further improve the stability of the repair structure 2, and avoid settlement of the repair structure 2 and the surrounding road surface.

[0033] See also Figure 3-4 The first reinforcing wire mesh 21 is laid on the bottom and side of the third repair groove 19, the upper end of the first reinforcing wire mesh 21 extends to the bottom of the second repair groove 18, the crushed stone repair layer 22 is filled into the third repair groove 19 and the second repair groove 18, the crushed stone repair layer 22 is filled to be flush with the original crushed stone cushion layer 11, the second reinforcing wire mesh 23 is laid on the upper surface of the crushed stone repair layer 22, the concrete repair layer 25 is poured on the upper surface of the second reinforcing wire mesh 23, and the concrete The repair layer 25 is flush with the original concrete base layer 12, the coarse asphalt repair layer 26 is laid on the upper surface of the concrete repair layer 25, and the coarse asphalt repair layer 26 is pressed to be flush with the original coarse asphalt layer 14, the medium asphalt repair layer 27 is laid on the upper surface of the coarse asphalt repair layer 26, and the medium asphalt repair layer 27 is pressed to be flush with the original medium asphalt layer 15, and the fine asphalt repair layer 28 is laid on the upper surface of the medium asphalt repair layer 27, and the fine asphalt repair layer 28 is pressed to be flush with the original fine asphalt layer 16.

[0034] Specifically, the first reinforcing wire mesh 21 is laid on the surface of the original gravel cushion layer 11, and the gravel repair layer 22 is re-laid and compacted. At this time, the first reinforcing wire mesh 21 is placed between the original gravel cushion layer 11 and the gravel repair layer 22. When the gravel repair layer 22 is under pressure, the first reinforcing wire mesh 21 provides a supporting force to improve the stability of the gravel repair layer 22. Then, the second reinforcing wire mesh 23 is laid on the upper surface of the gravel repair layer 22, and then reinforcing ribs 24 are added inside the original concrete base 12. Then, the concrete repair layer 25 is poured, and then a coarse asphalt repair layer 26 is laid on the surface of the concrete repair layer 25, and the coarse asphalt repair layer 26 is compacted. Then, the medium asphalt repair layer 27 is laid and compacted. Finally, a fine asphalt repair layer 28 is laid and compacted to complete the repair.

[0035] The working principle of the utility model is as follows: by completely cleaning the part of the base layer eroded by rainwater to maintain the structural strength of the original base layer, and then re-laying the base layer at the cleaned position to maintain the same supporting force as the original base layer, thereby improving the supporting strength of the repair structure 2 and avoiding settlement during use.

[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only preferred examples of the utility model, and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A road filling and repairing structure, comprising a rammed earth layer (1), characterized in that: An original pavement structure is arranged above the rammed earth layer (1), the original pavement structure comprising an original crushed stone cushion layer (11), an original concrete base layer (12), an original coarse asphalt layer (14), an original medium asphalt layer (15) and an original fine asphalt layer (16); a first repair groove (17), a second repair groove (18) and a third repair groove (19) are provided on the surface of the original pavement structure; a repair structure (2) is arranged inside the first repair groove (17), the second repair groove (18) and the third repair groove (19); the repair structure (2) comprises a first reinforcing wire mesh (21), a crushed stone repair layer (22), a second reinforcing wire mesh (23), reinforcing ribs (24), a concrete repair layer (25), a coarse asphalt repair layer (26), a medium asphalt repair layer (27) and a fine asphalt repair layer (28) which are arranged in sequence from bottom to top.

2. A road filling and repairing structure according to claim 1, characterized in that: The first repair groove (17) is opened on the surface of the original fine asphalt layer (16) and the original medium asphalt layer (15).

3. A road filling and repairing structure according to claim 1, characterized in that: The second repair groove (18) is formed on the surface of the original coarse asphalt layer (14), the original concrete base layer (12) and the upper part of the original crushed stone cushion layer (11); the original concrete base layer (12) is provided with a plurality of groups of transverse connecting grooves (13); the left and right sides of the reinforcing ribs (24) are respectively inserted into the connecting grooves (13) on the left and right sides.

4. A road filling and repairing structure according to claim 1, characterized in that: The third repair groove (19) is opened in the middle section of the original crushed stone cushion layer (11).

5. A road filling and repairing structure according to claim 1, characterized in that: The first reinforcing wire mesh (21) is laid on the bottom and side of the third repair groove (19), the upper end of the first reinforcing wire mesh (21) extends to the bottom of the second repair groove (18), the crushed stone repair layer (22) is filled into the interior of the third repair groove (19) and the second repair groove (18), and the crushed stone repair layer (22) is filled until it is flush with the original crushed stone cushion layer (11).

6. A road filling and repairing structure according to claim 1, characterized in that: The second reinforcing wire mesh (23) is laid on the upper surface of the crushed stone repair layer (22), the concrete repair layer (25) is poured on the upper surface of the second reinforcing wire mesh (23), and the concrete repair layer (25) is flush with the original concrete base layer (12).

7. The road filling and repairing structure according to claim 1, characterized in that: The crude asphalt repair layer (26) is laid on the upper surface of the concrete repair layer (25), and the crude asphalt repair layer (26) is pressed until it is flush with the original crude asphalt layer (14).

8. The road filling and repairing structure according to claim 1, characterized in that: The medium asphalt repair layer (27) is laid on the upper surface of the coarse asphalt repair layer (26), and the medium asphalt repair layer (27) is pressed until it is flush with the original medium asphalt layer (15). The fine asphalt repair layer (28) is laid on the upper surface of the medium asphalt repair layer (27), and the fine asphalt repair layer (28) is pressed until it is flush with the original fine asphalt layer (16).