Bridge pier capping beam construction operation platform
By setting up a Y-shaped support frame, allocating main beams, main beams, distribution auxiliary beams and frame-shaped operating panels on the bridge pier cover beam construction platform, and installing protective components, the problems of low efficiency and high safety risks in building platforms in the existing technology are solved, and a more convenient and safe construction environment is achieved.
Patent Information
- Application Number
- CN202420894440.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-04-26
AI Technical Summary
When building a bridge pier cover beam construction platform in bridge construction, there are problems such as high foundation bearing capacity requirements, long bracket installation time, low efficiency and high safety risks. The hoop bracket method cannot accommodate the construction scope of the cover beam, resulting in inconvenience in construction.
A bridge pier cover beam construction work platform is designed, including setting up two rows of Y-shaped support frames on the pier column, installing the main beam and main beam longitudinally at the top, further installing the distribution auxiliary beam longitudinally, laying frame-shaped working plates, and setting protective components on all sides, such as guardrail fences and poles.
Through this design, the construction is more convenient and firm, the working platform is larger, which is convenient for construction, which improves the construction efficiency of the bridge pier cover beams and enhances the operation safety.
Smart Images

Figure CN222758722U_ABST
Abstract
Description
Technical field:
[0001] The utility model belongs to the field of bridge construction, in particular to a pier cap beam construction operation platform. Background technology:
[0002] During the bridge construction process, before constructing the bridge cap beam, it is necessary to build a construction platform around the pier to facilitate workers to install steel bars, support formwork, pour concrete, etc. on the cap beam.
[0003] In the prior art, the full-frame scaffolding method and the clamp bracket method are generally used to build the construction platform, and both methods have their own shortcomings. When the full-frame scaffolding method is used to construct higher piers, there are problems such as high foundation bearing capacity requirements, long scaffolding time, low efficiency and high safety risks. If the construction foundation is on a river channel or soft foundation geological conditions, it will increase the difficulty of construction and extend the construction period. When the clamp bracket method is used, the size of the bracket erected is small and is similar to the plane size of the cap beam, so the bracket cannot accommodate the construction range of the cap beam and can only be directly below the cap beam. In addition, due to the limitation of the guardrail, it is very inconvenient for the steel bar binding of the cap beam and the installation of the facade formwork, and it does not really play the real role of a construction platform. Utility model content:
[0004] The purpose of the utility model is to provide a bridge pier cap beam construction work platform, and overcome the deficiencies of the above-mentioned prior art, which effectively solves the existing problems in the construction process of the work platform.
[0005] Contents of the utility model: A bridge pier cap beam construction work platform, including a pier column, on which two rows of Y-shaped support frames are arranged, a plurality of distribution main beams are installed longitudinally between the top ends of the two rows of Y-shaped support frames, main beams are installed transversely at both ends of the top wall of the distribution main beam, a plurality of distribution sub-beams are installed longitudinally between the top ends of the two main beams, a frame-shaped work plate is laid on the top wall of the distribution sub-beam, and protective components are arranged on the four sides of the frame-shaped work plate.
[0006] Furthermore, the protection component includes a guardrail enclosure, and a plurality of guardrail enclosures are vertically arranged on the four sides of the top wall of the frame-shaped work board, and a vertical pole is vertically arranged between two adjacent guardrail enclosures, and the bottom end of the vertical pole is fixedly connected to the top wall of the frame-shaped work board, and a connecting strip is horizontally installed on the vertical pole, and both ends of the connecting strip are fixedly connected to the adjacent guardrail enclosures.
[0007] Furthermore, the connecting strips are horizontally installed at both upper and lower ends of the vertical pole.
[0008] Furthermore, connecting plates are installed on both side walls of the guardrail enclosure, and the connecting plates are fixedly connected to both ends of the connecting strip by first bolts.
[0009] Furthermore, the bottom end of the vertical rod is fixedly connected to the top wall of the frame-shaped working board by a second bolt.
[0010] Furthermore, reinforcing ribs are installed on the protective net of the guardrail enclosure.
[0011] Furthermore, the frame-shaped working plate is a patterned plate.
[0012] Furthermore, the main beam, the distribution main beam and the distribution secondary beam are all I-beams.
[0013] The beneficial effects of the utility model are as follows: by laying a frame-shaped working plate on the top of the Y-shaped support frame, the construction platform is more convenient and firm to build, and the constructed working platform has a larger surface, which is convenient for workers to carry out construction, thereby improving the construction efficiency of the bridge pier cap beam. Description of the drawings:
[0014] Figure 1 It is the front view of the utility model;
[0015] Figure 2 It is a top view of the utility model;
[0016] In the figure, 1 pier column, 2 Y-shaped support frame, 3 distribution main beam, 4 main beam, 5 distribution secondary beam, 6 frame work plate, 7 guardrail enclosure, 8 upright pole, 9 connecting strip, 10 connecting piece, 11 reinforcing rib, 12 cap beam Specific implementation method:
[0017] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation of the present invention is now described with reference to the accompanying drawings:
[0018] like Figure 1 to Figure 2As shown, a pier cap construction work platform comprises a pier column 1, on which two rows of Y-shaped support frames 2 are arranged, a plurality of distribution main beams 3 are longitudinally installed between the top ends of the two rows of the Y-shaped support frames 2, main beams 4 are transversely installed at both ends of the top wall of the distribution main beam 3, a plurality of distribution sub-beams 5 are longitudinally installed between the top ends of the two main beams 4, a frame-shaped working board 6 is laid on the top wall of the distribution sub-beam 5, and protective components are arranged on the four sides of the frame-shaped working board 6, the protective components include guardrail enclosures 7, a plurality of guardrail enclosures 7 are vertically arranged on the four sides of the top wall of the frame-shaped working board 6, a vertical pole 8 is vertically arranged between two adjacent guardrail enclosures 7, the bottom end of the vertical pole 8 is fixedly connected to the top wall of the frame-shaped working board 6, a connecting strip 9 is horizontally installed on the vertical pole 8, and both ends of the connecting strip 9 are fixedly connected to the adjacent guardrail enclosures 7.
[0019] Specifically, by laying the frame-shaped working board 6 on the top of the Y-shaped supporting frame 2, the construction work platform can be built more conveniently and firmly.
[0020] In actual use, it is necessary to build a matching Y-shaped support frame 2 during the construction of the pier 1. When building the cap beam 12 at the top of the pier 1, first install the distribution main beam 3 vertically across the tops of the two rows of Y-shaped support frames 2, so that the two rows of Y-shaped support frames 2 can be subjected to force at the same time. The main beam 4 installed across both ends of the top wall of the distribution main beam 3 can reinforce the installation stability of the frame-shaped work board 6. Several distribution sub-beams 5 can evenly distribute the bearing capacity of the frame-shaped work board 6 to the two main beams 4 below. Several guardrail enclosures 7 vertically arranged on the four sides of the top wall of the frame-shaped work board 6 surround the construction work platform to form a safe working area to prevent high-altitude workers from accidentally falling.
[0021] like Figure 1 to Figure 2 As shown, a pier cap beam construction work platform is provided, wherein the connecting strips 9 are horizontally installed at the upper and lower ends of the vertical poles 8, and connecting plates 10 are installed on the two side walls of the guardrail enclosure 7, the connecting plates 10 are fixedly connected to the two ends of the connecting strips 9 by a first bolt, the bottom end of the vertical pole 8 is fixedly connected to the top wall of the frame-shaped work plate 6 by a second bolt, reinforcing ribs 11 are installed on the protective net of the guardrail enclosure 7, the frame-shaped work plate 6 is a patterned plate, and the main beam 4, the distribution main beam 3 and the distribution sub-beam 5 are all I-beams.
[0022] Specifically, the connecting strip 9 and the connecting plate 10 are fixedly connected by a first bolt, so as to facilitate the quick installation and disassembly of the guardrail enclosure 7 .
[0023] During actual use, the connecting piece 10 is aligned with the connecting strip 9, and the two are fixedly connected with the first bolt, which facilitates the quick installation and disassembly of the guardrail enclosure 7; the second bolt facilitates the quick installation and disassembly of the vertical pole 8 and the top wall of the frame-shaped working board 6; the reinforcing rib 11 strengthens the protective strength of the guardrail enclosure 7.
[0024] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A bridge pier cap construction work platform, comprising a pier column (1), on which two rows of Y-shaped support frames (2) are arranged, characterized in that: A plurality of distribution main beams (3) are longitudinally installed between the top ends of the two rows of Y-shaped support frames (2), main beams (4) are transversely installed at both ends of the top wall of the distribution main beams (3), a plurality of distribution sub-beams (5) are longitudinally installed between the top ends of the two main beams (4), a frame-shaped working board (6) is laid on the top wall of the distribution sub-beam (5), and protective components are arranged on the four sides of the frame-shaped working board (6).
2. A bridge pier cap beam construction work platform according to claim 1, characterized in that: The protection component comprises a guardrail enclosure (7), a plurality of guardrail enclosures (7) are vertically arranged on the four sides of the top wall of the frame-shaped working board (6), a vertical pole (8) is vertically arranged between two adjacent guardrail enclosures (7), the bottom end of the vertical pole (8) is fixedly connected to the top wall of the frame-shaped working board (6), and a connecting strip (9) is horizontally installed on the vertical pole (8), and both ends of the connecting strip (9) are fixedly connected to the adjacent guardrail enclosures (7).
3. A bridge pier cap beam construction work platform according to claim 2, characterized in that: The connecting strips (9) are horizontally mounted at both upper and lower ends of the vertical pole (8).
4. A bridge pier cap beam construction work platform according to claim 3, characterized in that: Connecting plates (10) are installed on both side walls of the guardrail enclosure (7), and the connecting plates (10) are fixedly connected to the two ends of the connecting strip (9) by means of first bolts.
5. The bridge pier cap beam construction work platform according to claim 2, characterized in that: The bottom end of the vertical rod (8) is fixedly connected to the top wall of the frame-shaped working board (6) by a second bolt.
6. The bridge pier cap beam construction work platform according to claim 2, characterized in that: Reinforcing ribs (11) are installed on the protective net of the guardrail enclosure (7).
7. The bridge pier cap beam construction work platform according to claim 1, characterized in that: The frame-shaped working plate (6) is a patterned plate.
8. The bridge pier cap beam construction work platform according to claim 1, characterized in that: The main beam (4), the distribution main beam (3) and the distribution secondary beam (5) are all I-beams.