Foundation pit secant pile foundation maintenance structure

By designing a foundation pit blocking pile foundation maintenance structure including support seats, steel plates, motors, screws, sliders and connecting rods, the problem of soil collapse in the foundation pit during construction is solved, stable support and reinforcement of foundation pits of different slope rates is achieved, and soil stability and bearing capacity are improved.

CN222758901UActive Publication Date: 2025-04-15BEIJING MUNICIPAL CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421572095.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-15
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

Existing bite piles can easily lead to the collapse of the foundation pit during construction, reducing soil stability.

Method used

A foundation pit occluding pile foundation maintenance structure is designed, including support seats, steel plates, motors, screws, sliders and connecting rods. The screws and connecting rods are driven by the motor to move the steel plates to achieve support and reinforcement of the slopes of foundation pits of different slope rates, and the soil is extruded through the slide plates and spring systems to reduce pores and improve load bearing capacity.

Benefits of technology

It effectively improves the stability of the soil inside the foundation pit, enhances the flexibility and adaptability of support and reinforcement for foundation pits with different slope rates, and reduces the risk of soil collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222758901U_ABST
    Figure CN222758901U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of enclosure structures, and particularly relates to a foundation pit secant pile foundation maintenance structure which comprises a supporting seat. A steel plate is hinged to the top of the supporting seat; a vertical plate is fixedly connected to the top of the supporting seat; the middle part of the vertical plate is fixedly connected with a motor; the output end of the motor is fixedly connected with a screw rod; the middle part of the screw rod is in threaded connection with a sliding plate; a first connecting rod is hinged to the middle of the sliding plate; the first connecting rod is hinged to the steel plate; a second connecting rod is hinged to the middle of the sliding plate; a sliding block is hinged to the end part of the second connecting rod; the sliding block is in sliding connection with the vertical plate; and when the motor rotates, the screw rod moves, and the first connecting rod drives the steel plate to move towards the slope surface of the foundation pit together, so that the device supports the slopes with different slope ratios, the stability of a soil body in the foundation pit during occlusive pile foundation construction is improved, and the flexibility and adaptability of the device for supporting and reinforcing the foundation pits with different slope ratios are enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of enclosure structures, in particular to a foundation pit interlocking pile foundation maintenance structure. Background Art

[0002] The foundation pit is an earth pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. Before excavation, the excavation plan should be determined based on geological and hydrological data and the conditions of nearby buildings on site, and waterproofing and drainage work should be done well.

[0003] Interlocking piles are piles that are partially embedded in the circumference of adjacent concrete piles, and steel cages are placed inside the piles that are constructed in sequence, forming an overall continuous waterproof and retaining structure with good anti-seepage effect. Its characteristic is that the piles are arranged in an interlocking manner, thereby enhancing the overall stability.

[0004] Existing interlocking piles require concrete pouring inside the piles during construction. During construction and observation, it was found that the foundation pit soil around the interlocking piles was prone to partial collapse during construction, which would reduce the stability of the soil inside the foundation pit.

[0005] Therefore, in view of the above problems, a foundation pit interlocking pile foundation maintenance structure is proposed. Utility Model Content

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the utility model to solve its technical problems is: the utility model describes a foundation pit interlocking pile foundation maintenance structure, comprising a support seat; a steel plate is hinged on the top of the support seat; a vertical plate is fixedly connected to the top of the support seat; a motor is fixedly connected to the middle of the vertical plate; a screw is fixedly connected to the output end of the motor; a slide plate is threadedly connected to the middle of the screw; a first connecting rod is hinged to the middle of the slide plate; the first connecting rod and the steel plate are both in an articulated relationship; when the motor rotates, the screw will move and the first connecting rod will move toward the foundation pit slope with the steel plate, thereby realizing the device's support for slopes with different slopes, improving the stability of the soil inside the foundation pit during the construction of the interlocking pile foundation, and enhancing the device's flexibility and adaptability to supporting and reinforcing foundation pits with different slopes.

[0008] Preferably, a second connecting rod is hingedly connected to the middle part of the slide plate; a slider is hingedly connected to the end of the second connecting rod; the slider and the vertical plate are slidably connected; the middle part of the vertical plate is rotatably connected to a rotating wheel; a plurality of springs are fixedly connected to the bottom of the support seat; a pressure plate is fixedly connected to the bottom of the spring; a steel wire rope is fixedly connected to the top of the pressure plate; the steel wire rope and the slide plate are both fixedly connected; the steel wire rope and the rotating wheel are in contact; when the slide plate moves, the slider will move with the steel wire rope and the pressure plate will squeeze the soil at the bottom of the support seat under the elastic force of the spring, thereby reducing the pores inside the soil around the support seat, increasing the bearing capacity of the soil on the device, and enhancing the stability of the device when reinforcing the foundation pit.

[0009] Preferably, a plurality of protrusions are fixedly connected to the bottom of the pressure plate; the protrusions are arranged in an array; when the pressure plate squeezes the soil under the elastic force of the spring, the protrusions will also squeeze the soil together with the pressure plate. Because the ends of the protrusions are sharply arranged, the protrusions will be inserted into the soil, thereby enhancing the squeezing effect of the pressure plate on the soil and further increasing the pulling effect between the device and the soil.

[0010] Preferably, a plurality of steel pipes are fixedly connected to the middle of the steel plate; a plurality of first circular holes are opened in the middle of the steel pipe; when the steel plate approaches the slope of the foundation pit, the steel pipe will also move with the steel plate, and when the steel pipe moves, it will enter the interior of the foundation pit soil and drill holes in the foundation pit. At this time, the staff can perform grouting treatment in the steel pipe, and the cement slurry will flow out from the first circular hole after entering the interior of the steel pipe, thereby realizing the grouting treatment of the interior of the foundation pit by the device, and further improving the stability of the soil inside the foundation pit.

[0011] Preferably, a plurality of baffles are fixedly connected to the middle of the steel pipe; the baffles and the first circular hole are correspondingly arranged; iron wires are fixedly connected between adjacent baffles; when the steel pipe is drilled into the soil of the foundation pit, soil will move along the surface of the steel pipe, and the soil will come into contact with and be intercepted by the baffles, thereby reducing the amount of soil blocks entering the steel pipe. At the same time, larger soil blocks will be cut by the iron wire when they come into contact with the iron wire, thereby reducing the resistance encountered by the steel pipe when drilling into the soil.

[0012] Preferably, a sphere is fixedly connected to the middle of the baffle; a plurality of second circular holes are opened in the middle of the sphere; cement slurry will spray out from the first circular hole inside the steel pipe, then the cement slurry will reach the surface of the baffle and enter the inside of the sphere, and finally the cement slurry will spray out from the second circular hole, thereby increasing the flow range of the cement slurry and accelerating the speed of grouting the foundation pit by the device.

[0013] Preferably, a cutter is fixedly connected to the end of the steel pipe; the cutter is a cross-shaped structure; when the steel pipe is drilled into the soil of the foundation pit, the cutter will come into contact with the soil before the steel pipe, and the cutter will cut the soil blocks inside the foundation pit, thereby reducing the resistance encountered by the steel pipe when moving and reducing the damage to the steel pipe caused by collision with the soil blocks.

[0014] The utility model is beneficial in that:

[0015] 1. The utility model discloses a foundation pit interlocking pile foundation maintenance structure. When the motor rotates, the screw rod moves and the first connecting rod moves with the steel plate toward the foundation pit slope, so that the device can support slopes with different slopes, improve the stability of the soil inside the foundation pit during the interlocking pile foundation construction, and enhance the flexibility and adaptability of the device to support and reinforce foundation pits with different slopes.

[0016] 2. The utility model describes a foundation pit interlocking pile foundation maintenance structure. When the slide plate moves, the slider will move with the wire rope and the pressure plate will squeeze the soil at the bottom of the support seat under the elastic force of the spring, thereby reducing the pores inside the soil around the support seat, increasing the bearing capacity of the soil on the device, and enhancing the stability of the device when reinforcing the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the main body of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the neutral plate of the utility model;

[0020] Figure 3 This is a schematic diagram of the structure of the rotating wheel of the utility model;

[0021] Figure 4 It is a structural schematic diagram of the steel pipe in the utility model;

[0022] Figure 5 It is a structural schematic diagram of the middle baffle of the utility model.

[0023] In the figure: 1. support seat; 12. steel plate; 13. vertical plate; 14. motor; 15. screw; 16. slide plate; 17. first connecting rod; 2. second connecting rod; 22. slider; 23. rotating wheel; 24. wire rope; 25. pressure plate; 26. spring; 3. bump; 4. steel pipe; 42. first round hole; 5. baffle; 52. wire; 6. round ball; 62. second round hole; 7. tool. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Specific examples are given below.

[0026] See also Figures 1 to 5 As shown, a foundation pit interlocking pile foundation maintenance structure described in an embodiment of the utility model comprises a support seat 1; a steel plate 12 is hinged on the top of the support seat 1; a vertical plate 13 is fixedly connected to the top of the support seat 1; a motor 14 is fixedly connected to the middle of the vertical plate 13; a screw 15 is fixedly connected to the output end of the motor 14; a slide plate 16 is threadedly connected to the middle of the screw 15; a first connecting rod 17 is hinged to the middle of the slide plate 16; the first connecting rod 17 and the steel plate 12 are both in a hinged relationship; when working, the staff moves the device to the edge of the foundation pit and starts the device, which will start the motor 14 and rotate the screw 15 after the device is started. When the screw 15 rotates, the slide plate 16 will move along the screw 15 due to the threaded connection. When the slide plate 16 moves, it will move with the first connecting rod 17 and change the angle of the first connecting rod 17. When the first connecting rod 17 moves, it will exert pressure on the steel plate 12 and change the angle of the steel plate 12. Under the pressure of the first connecting rod 17, the steel plate 12 will approach the slope of the foundation pit until it contacts the edge of the foundation pit. When the steel plate 12 contacts the slope of the foundation pit, it will squeeze the soil layer inside the foundation pit to support the foundation pit; when the motor 14 rotates, it will move the screw 15 and make the first connecting rod 17 move with the steel plate 12 toward the slope of the foundation pit, so that the device can support slopes with different slopes, improve the stability of the soil inside the foundation pit during the construction of the bite pile foundation, and enhance the flexibility and adaptability of the device to the support and reinforcement of foundation pits with different slopes.

[0027] See also Figures 1 to 3As shown, the middle part of the slide plate 16 is hinged with the second connecting rod 2; the end of the second connecting rod 2 is hinged with a slider 22; the slider 22 and the vertical plate 13 are slidably connected; the middle part of the vertical plate 13 is rotatably connected with a rotating wheel 23; a plurality of springs 26 are fixedly connected to the bottom of the support seat 1; a pressure plate 25 is fixedly connected to the bottom of the spring 26; a steel wire rope 24 is fixedly connected to the top of the pressure plate 25; the steel wire rope 24 and the slide block 22 are both fixedly connected; the steel wire rope 24 and the rotating wheel 23 are in contact; when the slide plate 16 moves, it will also move with the second connecting rod 2, and when the second connecting rod 2 moves, the angle will change and exert a pulling force on the slider 22, so that the slider 22 will move along When the vertical plate 13 slides, the sliding block 22 moves, which will cause the wire rope 24 to move and the rotating wheel 23 to rotate under the action of friction. At this time, the tension of the wire rope 24 on the pressure plate 25 will be weakened, because the spring 26 is in a compressed state, and the pressure plate 25 will squeeze the soil at the bottom of the support seat 1 under the elastic force of the spring 26, thereby improving the density of the soil around the support seat 1; when the sliding plate 16 moves, the sliding block 22 will move with the wire rope 24, and the pressure plate 25 will squeeze the soil at the bottom of the support seat 1 under the elastic force of the spring 26, thereby reducing the pores inside the soil around the support seat 1, thereby improving the bearing capacity of the soil on the device and enhancing the stability of the device when reinforcing the foundation pit.

[0028] See also Figure 3 As shown, a plurality of protrusions 3 are fixedly connected to the bottom of the pressing plate 25; the protrusions 3 are arranged in an array; when the pressing plate 25 squeezes the soil under the elastic force of the spring 26, the protrusions 3 will also squeeze the soil together with the pressing plate 25. Because the ends of the protrusions 3 are sharp, the protrusions 3 will be inserted into the soil, thereby enhancing the squeezing effect of the pressing plate 25 on the soil and further increasing the pulling effect between the device and the soil.

[0029] See also Figure 1 and Figure 4 As shown, a plurality of steel pipes 4 are fixedly connected to the middle of the steel plate 12; a plurality of first circular holes 42 are opened in the middle of the steel pipe 4; when the steel plate 12 approaches the slope of the foundation pit, the steel pipe 4 will also move with the steel plate 12, and when the steel pipe 4 moves, it will enter the interior of the foundation pit soil and drill holes in the foundation pit. At this time, the staff can perform grouting treatment in the steel pipe 4, and the cement slurry will flow out from the first circular hole 42 after entering the interior of the steel pipe 4, thereby realizing the grouting treatment of the interior of the foundation pit by the device, and further improving the stability of the soil inside the foundation pit.

[0030] See also Figure 4 and Figure 5As shown, a plurality of baffles 5 are fixedly connected to the middle of the steel pipe 4; the baffles 5 and the first circular holes 42 are correspondingly arranged; iron wires 52 are fixedly connected between adjacent baffles 5; when the steel pipe 4 is drilled into the soil of the foundation pit, soil will move along the surface of the steel pipe 4, and the soil will come into contact with the baffles 5 and be intercepted by the baffles 5, thereby reducing the soil blocks entering the steel pipe 4. Meanwhile, when larger soil blocks come into contact with the iron wires 52, they will be cut by the iron wires 52, thereby reducing the resistance encountered by the steel pipe 4 when drilling into the soil.

[0031] See also Figure 5 As shown, a sphere 6 is fixedly connected to the middle of the baffle 5; a plurality of second circular holes 62 are opened in the middle of the sphere 6; cement slurry will be sprayed out from the first circular hole 42 inside the steel pipe 4, and then the cement slurry will reach the surface of the baffle 5 and enter the inside of the sphere 6, and finally the cement slurry will be sprayed out from the second circular hole 62, thereby increasing the flow range of the cement slurry and accelerating the speed of the device in grouting the foundation pit.

[0032] See also Figure 4 As shown, a cutter 7 is fixedly connected to the end of the steel pipe 4; the cutter 7 is a cross-shaped structure; when the steel pipe 4 is drilled into the soil of the foundation pit, the cutter 7 will come into contact with the soil before the steel pipe 4, and the cutter 7 will cut the soil blocks inside the foundation pit, thereby reducing the resistance encountered by the steel pipe 4 when moving, and reducing the damage to the steel pipe 4 caused by collision with the soil blocks.

[0033] Working principle: the staff moves the device to the edge of the foundation pit and starts the device. After the device is started, the motor 14 is started and the screw 15 is rotated. When the screw 15 rotates, the slide plate 16 will move along the screw 15 due to the threaded connection. When the slide plate 16 moves, it will move with the first connecting rod 17 and change the angle of the first connecting rod 17. When the first connecting rod 17 moves, it will exert pressure on the steel plate 12 and change the angle of the steel plate 12. Under the pressure of the first connecting rod 17, the steel plate 12 will approach the foundation pit slope until it contacts the edge of the foundation pit. When the steel plate 12 contacts the foundation pit slope, it will press the soil layer inside the foundation pit. When the slide plate 16 moves, it will also move with the second connecting rod 2. When the second connecting rod 2 moves, the angle will change and exert a pulling force on the slider 22, so that the slider 22 will slide along the vertical plate 13. When the slider 22 moves, it will move the wire rope 24 and make the rotating wheel 23 rotate under the action of friction. At this time, the pulling force of the wire rope 24 on the pressure plate 25 will be weakened because the spring 26 is in a compressed state. The pressure plate 25 will squeeze the soil at the bottom of the support seat 1 under the elastic force of the spring 26 to improve the density of the soil around the support seat 1. When the pressure plate 25 is under the elastic force of the spring 26 When the soil is squeezed downward, the protrusion 3 will also squeeze the soil together with the pressure plate 25. Because the end of the protrusion 3 is sharp, the protrusion 3 will be inserted into the soil, thereby enhancing the squeezing effect of the pressure plate 25 on the soil; when the steel plate 12 approaches the slope of the foundation pit, the steel pipe 4 will also move with the steel plate 12. When the steel pipe 4 moves, it will enter the interior of the foundation pit soil and drill holes in the foundation pit. At this time, the staff can perform grouting treatment in the steel pipe 4. After the cement slurry enters the interior of the steel pipe 4, it will flow out from the first circular hole 42, thereby realizing the grouting treatment of the interior of the foundation pit by the device; when the steel pipe 4 drills into the interior of the foundation pit soil, soil will move along the surface of the steel pipe 4. , these soils will come into contact with the baffle 5 and be intercepted by the baffle 5, reducing the soil blocks entering the steel pipe 4. At the same time, larger soil blocks will be cut by the iron wire 52 when they come into contact with the iron wire 52, reducing the resistance encountered by the steel pipe 4 when drilling into the soil; cement slurry will be sprayed out from the first circular hole 42 inside the steel pipe 4, and then the cement slurry will reach the surface of the baffle 5 and enter the inside of the ball 6, and finally the cement slurry will be sprayed out from the second circular hole 62, increasing the flow range of the cement slurry; when the steel pipe 4 drills into the soil of the foundation pit, the tool 7 will come into contact with the soil before the steel pipe 4, and the tool 7 will cut the soil blocks inside the foundation pit, reducing the resistance encountered by the steel pipe 4 when it moves.

[0034] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A foundation pit interlocking pile foundation maintenance structure, comprising a support seat (1), characterized in that: The top of the support seat (1) is hinged with a steel plate (12); the top of the support seat (1) is fixedly connected with a vertical plate (13); the middle of the vertical plate (13) is fixedly connected with a motor (14); the output end of the motor (14) is fixedly connected with a screw rod (15); the middle of the screw rod (15) is threadedly connected with a slide plate (16); the middle of the slide plate (16) is hinged with a first connecting rod (17); the first connecting rod (17) and the steel plate (12) are both in a hinged relationship.

2. A foundation pit interlocking pile foundation maintenance structure according to claim 1, characterized in that: The middle part of the slide plate (16) is hinged with a second connecting rod (2); the end of the second connecting rod (2) is hinged with a slider (22); the slider (22) and the vertical plate (13) are slidably connected; the middle part of the vertical plate (13) is rotatably connected with a rotating wheel (23); the bottom of the support seat (1) is fixedly connected with a plurality of springs (26); the bottom of the spring (26) is fixedly connected with a pressure plate (25); the top of the pressure plate (25) is fixedly connected with a steel wire rope (24); the steel wire rope (24) and the slide plate (22) are both fixedly connected; the steel wire rope (24) and the rotating wheel (23) are in contact.

3. A foundation pit interlocking pile foundation maintenance structure according to claim 2, characterized in that: A plurality of protrusions (3) are fixedly connected to the bottom of the pressing plate (25); the protrusions (3) are arranged in an array.

4. A foundation pit interlocking pile foundation maintenance structure according to claim 3, characterized in that: A plurality of steel pipes (4) are fixedly connected to the middle of the steel plate (12); a plurality of first circular holes (42) are opened in the middle of the steel pipe (4).

5. A foundation pit interlocking pile foundation maintenance structure according to claim 4, characterized in that: A plurality of baffles (5) are fixedly connected to the middle of the steel pipe (4); the baffles (5) and the first circular holes (42) are arranged correspondingly; and iron wires (52) are fixedly connected between adjacent baffles (5).

6. A foundation pit interlocking pile foundation maintenance structure according to claim 5, characterized in that: A sphere (6) is fixedly connected to the middle of the baffle (5); a plurality of second circular holes (62) are opened in the middle of the sphere (6).