Building engineering concrete formwork assembly structure
By designing a concrete formwork assembly structure including adjustment box, threaded rod, guide rod and buffer block, the problem of positioning and adjustment during assembly is solved, and the adjustment, connection and buffering capabilities of assembly are improved.
Patent Information
- Application Number
- CN202421318689.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-11
AI Technical Summary
In construction projects, it is difficult to position and adjust the assembly process of concrete formwork, which affects the assembly effect.
A concrete formwork assembly structure for construction engineering is designed, including adjustment box, threaded rod, guide rod, connection block and buffer block. The threaded rod is driven by a servo motor, and combined with the cooperation of the sliding sleeve and guide rod, the precise positioning and adjustment of the concrete formwork is achieved.
It improves assembly adjustment capabilities, connection capabilities and buffering capabilities, ensuring stable and efficient assembly of concrete forms.
Smart Images

Figure CN222759379U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete formwork assembly, in particular to a construction engineering concrete formwork assembly structure. Background Art
[0002] Construction engineering refers to the construction of various types of buildings and their ancillary facilities, and also includes the installation of supporting lines, pipelines, and equipment. After a series of construction engineering operations, a physical engineering entity will eventually be formed. The final constructed entity will be used by people, and a variety of raw materials will be needed in the process of construction engineering;
[0003] This includes the concrete formwork that will be used during construction. Concrete formwork refers to the formwork for forming newly poured concrete and a complete set of structural systems for supporting the formwork. There are various different stage-by-stage classification methods for the formwork, which are divided into load-bearing and non-load-bearing formwork according to the force conditions. In order to facilitate the positioning and installation of concrete formwork, an assembly structure is required to complete the work. At this time, if the assembly process is difficult to position and adjust, it will directly affect the assembly effect. Utility Model Content
[0004] The purpose of the utility model is to provide a concrete formwork assembly structure for construction projects, so as to solve the problem proposed in the above-mentioned background technology that in order to facilitate the positioning and installation of the concrete formwork, an assembly structure is needed to complete the work. At this time, if the assembly process is difficult to position and adjust, it is easy to directly affect the assembly effect.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering concrete formwork assembly structure, comprising an adjustment box and a concrete formwork, the adjustment boxes are symmetrically distributed about the central axis of the concrete formwork, a threaded rod is installed inside one of the adjustment boxes, one end of the threaded rod is connected to a servo motor, and the outer wall of the threaded rod is connected to a threaded block, and a guide rod is installed inside the other adjustment box, and the outer wall of the guide rod is connected to a sliding sleeve, a guide column is installed on one side of the sliding sleeve and the threaded block, a connecting block is fixed on one side of the guide column, a guide groove is opened inside one side of the adjustment box, and an embedding groove is opened at the front and rear ends of the guide groove, and a ball is embedded in the embedding groove.
[0006] Preferably, an outer side wall of the threaded rod is provided with external threads, the external threads are distributed in the opposite direction with respect to the center axis of the threaded rod, and a threaded connection is formed between the threaded rod and the threaded block.
[0007] Preferably, the threaded blocks are symmetrically distributed about the central axis of the threaded rod, and the sliding sleeves are symmetrically distributed about the central axis of the guide rod.
[0008] Preferably, the connecting blocks are symmetrically distributed about the central axis of the concrete formwork, connecting plates are installed on both sides of the concrete formwork, connecting holes are opened inside the connecting blocks, and mounting pins are connected between the connecting holes and the connecting plates, and locking nuts are installed at both ends of the mounting pins.
[0009] Preferably, the locking nuts are symmetrically distributed about the central axis of the insertion pin, and the connecting plates are symmetrically distributed about the central axis of the concrete formwork.
[0010] Preferably, a first guide block is installed at the top end of one of the concrete templates, and a second guide block is installed at the bottom end of the other concrete template, and the first guide block and the second guide block are evenly distributed.
[0011] Preferably, mounting holes are provided inside both sides of the two concrete formworks, mounting columns are inserted inside the mounting holes, a threaded groove is provided inside the bottom end of the mounting column, a first adsorption block is installed at the top end of the threaded groove, a threaded column is connected inside the threaded groove, a second adsorption block is fixed to the top end of the threaded column, a connecting plate is fixed to the bottom end of the threaded column, and a buffer block is installed at the bottom end of the connecting plate.
[0012] Preferably, a buffer pad is bonded to the bottom end of the buffer block, and a threaded connection is formed between the thread column and the thread groove.
[0013] Compared with the prior art, the utility model has the following beneficial effects: the construction engineering concrete formwork assembly structure not only improves the assembly adjustment capability, but also improves the connection capability and buffering capability of the assembly structure;
[0014] (1) The threaded rod is installed in one adjustment box, and the guide rod is installed in another adjustment box. After the concrete template is assembled by using the connecting block and the connecting piece, the two concrete templates are connected with different threaded blocks respectively. At this time, the servo motor can be started to drive the threaded rod to rotate. At this time, the threaded block and the threaded rod cooperate with each other to form a thread path. At the same time, the sliding sleeve and the guide rod cooperate to complete the guiding work, so that the two concrete templates can be brought close to each other. After the two concrete templates are brought close to each other, the first guide block and the second guide block cooperate to complete the guiding process. When the guide column moves in the guide groove, the contact wear phenomenon is reduced by the combination of the embedded groove and the ball, thereby better improving the overall assembly adjustment ability during the working process;
[0015] (2) By fixing the connecting block at the side of the guide column, and then making the connecting piece and the connecting block fit together, the connecting hole and the mounting pin cooperate with each other to form a connection installation, and then the locking nut is used to lock it. At this time, the connection installation between the concrete formwork and the connecting block can be completed, which facilitates the subsequent connection and assembly between the two concrete formworks;
[0016] (3) The threaded column is used to complete the connection and installation between the buffer block and the insertion column. The first adsorption block and the second adsorption block cooperate to form an adsorption positioning, thereby completing the connection and installation between the buffer block and the insertion column. Therefore, when the concrete formwork is adjusted and assembled, the buffer block is supported between the two concrete formworks, thereby better improving the overall buffer protection capability during the working process. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0018] Figure 2 This is a partial front view structural diagram of the buffer block of the utility model;
[0019] Figure 3 It is a schematic diagram of a partial top view of the connecting piece of the utility model;
[0020] Figure 4 It is a schematic diagram of a partial side cross-sectional structure of the regulating box of the utility model.
[0021] In the figure: 1. adjustment box; 2. threaded rod; 3. guide groove; 4. connecting block; 5. concrete formwork; 6. first guide block; 7. sliding sleeve; 8. guide rod; 9. guide column; 10. connecting piece; 11. second guide block; 12. mounting column; 13. servo motor; 14. threaded block; 15. connecting plate; 16. buffer pad; 17. buffer block; 18. threaded column; 19. first adsorption block; 20. second adsorption block; 21. connecting hole; 22. mounting pin; 23. locking nut; 24. embedding groove; 25. ball. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-4The utility model provides an embodiment: a construction engineering concrete formwork assembly structure, including an adjustment box 1 and a concrete formwork 5. The adjustment boxes 1 are symmetrically distributed about the central axis of the concrete formwork 5. A threaded rod 2 is installed inside one adjustment box 1, one end of the threaded rod 2 is connected to a servo motor 13, and the outer wall of the threaded rod 2 is connected to a threaded block 14. A guide rod 8 is installed inside the other adjustment box 1, and a sliding sleeve 7 is connected to the outer wall of the guide rod 8. A guide column 9 is installed on one side of the sliding sleeve 7 and the threaded block 14, and a connecting block 4 is fixed on one side of the guide column 9. A guide groove 3 is opened inside one side of the adjustment box 1, and an embedding groove 24 is opened at both front and rear ends of the guide groove 3, and a ball 25 is embedded in the embedding groove 24.
[0024] External threads are distributed on the outer side wall of the threaded rod 2 , and the external threads are distributed in the opposite direction with respect to the central axis of the threaded rod 2 , so that a threaded connection is formed between the threaded rod 2 and the threaded block 14 .
[0025] The threaded blocks 14 are symmetrically distributed with respect to the central axis of the threaded rod 2 , and the sliding sleeves 7 are symmetrically distributed with respect to the central axis of the guide rod 8 .
[0026] The connecting blocks 4 are symmetrically distributed about the central axis of the concrete formwork 5, and connecting plates 10 are installed on both sides of the concrete formwork 5. A connecting hole 21 is opened inside the connecting block 4, and a plug pin 22 is connected between the connecting hole 21 and the connecting plate 10, and locking nuts 23 are installed at both ends of the plug pin 22.
[0027] The locking nuts 23 are symmetrically distributed with respect to the central axis of the insertion pin 22 , and the connecting pieces 10 are symmetrically distributed with respect to the central axis of the concrete formwork 5 .
[0028] A first guide block 6 is installed at the top end of one concrete form 5, and a second guide block 11 is installed at the bottom end of the other concrete form 5. The first guide blocks 6 and the second guide blocks 11 are evenly distributed.
[0029] Mounting holes are provided inside both sides of the two concrete formworks 5, and mounting columns 12 are inserted inside the mounting holes. A threaded groove is provided inside the bottom end of the mounting column 12, and a first adsorption block 19 is installed at the top end of the threaded groove. A threaded column 18 is connected inside the threaded groove, and a second adsorption block 20 is fixed to the top end of the threaded column 18. A connecting plate 15 is fixed to the bottom end of the threaded column 18, and a buffer block 17 is installed at the bottom end of the connecting plate 15.
[0030] The bottom end of the buffer block 17 is bonded with a buffer pad 16, and a threaded connection is formed between the thread column 18 and the thread groove;
[0031] The two concrete formworks 5 are further connected and installed between the threaded block 14 and the sliding sleeve 7 in the same horizontal plane, and the connection piece 10 is connected with the connection block 4.
[0032] Working principle: First, during operation, the threaded column 18 is used to complete the connection and installation between the column 12, and the first adsorption block 19 and the second adsorption block 20 cooperate to form an adsorption positioning, so that the connection and installation between the buffer block 17 and the column 12 can be completed. Therefore, when the concrete formwork 5 is adjusted and assembled, the buffer block 17 is supported between the two concrete formworks 5. After the concrete formwork 5 is assembled using the connecting block 4 and the connecting piece 10, the two concrete formworks 5 are respectively connected to different threaded blocks 14. At this time, the servo motor 13 is started to drive the threaded rod 2 to rotate. At this time, the threaded block 14 and the threaded rod 2 cooperate with each other to form a threaded path. At the same time, the sliding sleeve 7 and the guide rod 8 cooperate to complete the guiding work, so that the two concrete formworks 5 can be brought close to each other. After approaching, the first guide block 6 and the second guide block 11 cooperate to complete the guiding process, so that the assembly work of the concrete formwork 5 is finally completed.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
Claims
1. A construction engineering concrete formwork assembly structure, comprising an adjustment box (1) and a concrete formwork (5), characterized in that: The adjustment boxes (1) are symmetrically arranged about the central axis of the concrete formwork (5); a threaded rod (2) is installed inside one of the adjustment boxes (1); one end of the threaded rod (2) is connected to a servo motor (13); the outer wall of the threaded rod (2) is connected to a threaded block (14); a guide rod (8) is installed inside the other adjustment box (1); the outer wall of the guide rod (8) is connected to a sliding sleeve (7); a guide column (9) is installed on one side of the sliding sleeve (7) and the threaded block (14); a connecting block (4) is fixed on one side of the guide column (9); a guide groove (3) is provided inside one side of the adjustment box (1); an embedding groove (24) is provided at the front and rear ends of the guide groove (3); a ball (25) is embedded in the embedding groove (24).
2. The construction engineering concrete formwork assembly structure according to claim 1, characterized in that: The outer side wall of the threaded rod (2) is provided with external threads, which are distributed in the opposite direction with respect to the central axis of the threaded rod (2), and a threaded connection is formed between the threaded rod (2) and the threaded block (14).
3. The construction engineering concrete formwork assembly structure according to claim 1, characterized in that: The threaded blocks (14) are symmetrically distributed with respect to the central axis of the threaded rod (2), and the sliding sleeves (7) are symmetrically distributed with respect to the central axis of the guide rod (8).
4. The construction engineering concrete formwork assembly structure according to claim 1, characterized in that: The connecting blocks (4) are symmetrically distributed about the central axis of the concrete formwork (5), connecting plates (10) are installed on both sides of the concrete formwork (5), a connecting hole (21) is opened inside the connecting block (4), a plug pin (22) is connected between the connecting hole (21) and the connecting plate (10), and locking nuts (23) are installed at both ends of the plug pin (22).
5. A construction engineering concrete formwork assembly structure according to claim 4, characterized in that: The locking nuts (23) are symmetrically distributed with respect to the central axis of the insertion pin (22), and the connecting pieces (10) are symmetrically distributed with respect to the central axis of the concrete formwork (5).
6. The construction engineering concrete formwork assembly structure according to claim 1, characterized in that: A first guide block (6) is installed at the top end of one of the concrete templates (5), and a second guide block (11) is installed at the bottom end of the other concrete template (5); the first guide block (6) and the second guide block (11) are evenly distributed.
7. The construction engineering concrete formwork assembly structure according to claim 1, characterized in that: Both sides of the two concrete formworks (5) are provided with mounting holes, and mounting columns (12) are inserted into the mounting holes. A threaded groove is provided inside the bottom end of the mounting column (12), and a first adsorption block (19) is installed at the top end of the threaded groove. A threaded column (18) is connected to the threaded groove, and a second adsorption block (20) is fixed to the top end of the threaded column (18). A connecting plate (15) is fixed to the bottom end of the threaded column (18), and a buffer block (17) is installed at the bottom end of the connecting plate (15).
8. The construction engineering concrete formwork assembly structure according to claim 7, characterized in that: The bottom end of the buffer block (17) is bonded with a buffer pad (16), and a threaded connection is formed between the thread column (18) and the thread groove.