Fixing device for optimizing concrete construction process
By designing a fixture for concrete construction, connecting the conveyor pump pipe and the vibrating rod, the combination of casting and vibration is achieved, solving the problems of low efficiency and quality of traditional construction methods, and achieving efficient and stable concrete construction.
Patent Information
- Application Number
- CN202421126487.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-05-22
AI Technical Summary
In concrete construction, the traditional method is inefficient. Improper cooperation between the two people can easily lead to concrete quality problems. In secondary structure construction, the slow feeding speed leads to initial settling of premixed concrete, affecting the construction quality.
A fixed device is designed to combine the pouring and vibration processes by connecting the conveying pump pipe and the vibrating rod. Only one person needs to operate it and cooperate with a small pump machine to improve construction efficiency.
This device makes concrete construction more efficient, reduces labor costs, avoids concrete quality problems caused by improper coordination or inefficiency, and improves construction quality.
Smart Images

Figure CN222759394U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, in particular to a fixing device for optimizing concrete construction technology. Background Art
[0002] In concrete construction, one person usually holds the concrete pump pipe for pouring while the other person vibrates. The construction efficiency is low, and if the two people do not cooperate properly, leakage or over-vibration can easily cause concrete quality problems. In secondary structure construction, the manual loading speed is slow. If the project is large or there are many parts, untimely loading can easily cause the initial setting of premixed concrete, resulting in poor fluidity and affecting the quality of concrete structure construction. Therefore, the traditional construction method limits the construction efficiency of concrete engineering, especially secondary structure engineering concrete. If the efficiency is improved, the labor cost will also increase significantly. Therefore, a fixing device that optimizes the concrete construction process is needed to solve the above technical problems. Utility Model Content
[0003] In order to solve the above-mentioned technical problems, the utility model provides a fixing device for optimizing the concrete construction process. The device is simple to manufacture and easy to use. By combining the concrete pouring and vibration processes into one, only one person is needed to complete the pouring and vibration work. In combination with a small pump machine, the construction efficiency can be greatly improved, labor costs can be saved, and quality problems of the concrete structure caused by improper coordination or inefficiency can be avoided.
[0004] The technical solution adopted in the embodiment of the utility model is: a fixing device for optimizing the concrete construction process, which can connect a delivery pump pipe and a vibrating rod, and includes a first fixing member, a third fixing member and a connecting member. The delivery pump pipe is connected to the connecting member through the first fixing member, and the vibrating rod is connected to the connecting member through the third fixing member. Driving the connecting member can simultaneously drive the delivery pump pipe and the vibrating rod to move for pouring and vibration.
[0005] Furthermore, the first fixing member includes a first arc-shaped member, a second arc-shaped member rotatably connected to the first arc-shaped member via a first rotating shaft, and a first fastener connecting the first arc-shaped member and the second arc-shaped member. The first arc-shaped member and the second arc-shaped member enclose a space to accommodate the delivery pump tube, and the end of the first arc-shaped member away from the first rotating shaft is connected to the connecting member.
[0006] Furthermore, the end of the first arc-shaped member away from the first rotating shaft is connected to the connecting member through a first support plate, the end of the second arc-shaped member away from the first rotating shaft is connected to the first support plate through a second support plate, and the first fastener passes through the first support plate and the second support plate at the same time.
[0007] Further, the first support plate includes a first main body and a first pad forming a first angle with the first main body, the end of the first main body away from the first pad is connected to the first arc-shaped member, the second support plate includes a second main body and a second pad forming a second angle with the second main body, the end of the second main body away from the second pad is connected to the second arc-shaped member, the second pad is connected to the connecting member through the first pad, and the first fastener passes through the first main body and the second main body at the same time.
[0008] Furthermore, the first pad and the second pad are both arranged parallel to the connecting member.
[0009] Furthermore, the third fixing member includes a third arc-shaped member, a fourth arc-shaped member rotatably connected to the third arc-shaped member via a third rotating shaft, and a second fastener connecting the third arc-shaped member and the fourth arc-shaped member. The third arc-shaped member and the fourth arc-shaped member wrap the vibrating rod and are connected to the connecting member at the same time.
[0010] Furthermore, the end of the third arc-shaped member away from the third rotating shaft is connected to the connecting member through a third support plate, the end of the fourth arc-shaped member away from the third rotating shaft is connected to the third support plate through a fourth support plate, and the second fastener passes through the third support plate and the fourth support plate at the same time.
[0011] Further, the third support plate includes a third main body and a third pad which is at a third angle to the third main body, the end of the third main body away from the third pad is connected to a third arc-shaped member, the fourth support plate includes a fourth main body and a fourth pad which is at a fourth angle to the fourth main body, the end of the fourth main body away from the fourth pad is connected to a fourth arc-shaped member, the fourth pad is connected to the connecting member through the third pad, and the second fastener passes through the third main body and the fourth main body at the same time.
[0012] Furthermore, an anti-slip pad is provided between the third arc-shaped member, the fourth arc-shaped member and the vibrating rod.
[0013] Furthermore, the connecting member is connected to the handle via a third fastener.
[0014] The advantages and positive effects of the utility model are as follows: the first fixing member, the third fixing member and the connecting member are provided, and the three cooperate with each other to achieve a firm fixation between the delivery pump pipe and the vibrating rod, and the pouring and vibrating process is more stable, which ensures the construction effect and improves the construction efficiency; two arc-shaped members connected by a rotating shaft are provided, which can be flexibly fixed according to the size of the delivery pump pipe or the vibrating rod, and have stronger applicability; the arc-shaped member and the connecting member are connected by a support plate to ensure the angle and distance between the delivery pump pipe and the vibrating rod, and achieve better pouring and vibrating effects. In addition, the device is simple to set up, easy to operate, and reusable. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a front view of an embodiment provided by the utility model;
[0016] Figure 2 It is a schematic diagram of the structure of the embodiment provided by the utility model when in use;
[0017] Figure 3 It is a structural schematic diagram of another embodiment provided by the utility model when in use.
[0018] In the figure:
[0019] 1. Delivery pump pipe; 2. Vibrating rod; 3. First fixing member; 31. First arc-shaped member; 32. Second arc-shaped member; 33. First rotating shaft; 34. First fastener; 35. First support plate; 351. First main body; 352. First pad; 36. Second support plate; 361. Second main body; 362. Second pad; 4. Third fixing member; 41. Third arc-shaped member; 42. Fourth arc-shaped member; 43. Third rotating shaft; 44. Second fastener; 45. Third support plate; 451. Third main body; 452. Third pad; 46. Fourth support plate; 461. Fourth main body; 462. Fourth pad; 5. Connecting member; 6. Third fastener; 7. Handle; 8. Anti-slip pad. DETAILED DESCRIPTION
[0020] The embodiment of the utility model provides a fixing device for optimizing the concrete construction process, which is described below in conjunction with the accompanying drawings.
[0021] Reference Figure 1As shown, a fixing device for optimizing the concrete construction process can connect the delivery pump pipe 1 and the vibrating rod 2, including a first fixing member 3, a third fixing member 4 and a connecting member 5. The delivery pump pipe 1 is connected to the connecting member 5 through the first fixing member 3, and the vibrating rod 2 is connected to the connecting member 5 through the third fixing member 4. The driving connecting member 5 can drive the delivery pump pipe 1 and the vibrating rod 2 at the same time to perform vibration and pouring operations. The delivery pump pipe 1 and the vibrating rod 2 are fixed together by the first fixing member 3, the third fixing member 4 and the connecting member 5, and the concrete pouring and vibration processes are combined into one. Only one person is needed to complete the pouring and vibration work. With a small pump machine, the construction efficiency can be greatly improved, the labor cost can be saved, and the quality problems of the concrete structure caused by improper coordination or low efficiency can be avoided.
[0022] Preferably, the delivery pump pipe 1 and the vibrating rod 2 are arranged in parallel. Figure 3 As shown, multiple sets of fixing devices can be arranged between the delivery pump pipe 1 and the vibrating rod 2, so that the connection is more stable, the construction operation is convenient, and the construction quality can be effectively guaranteed.
[0023] Preferably, the first fixing member 3 includes a first arc-shaped member 31, a second arc-shaped member 32 rotatably connected to the first arc-shaped member 31 via a first rotating shaft 33, and a first fastener 34 connecting the first arc-shaped member 31 and the second arc-shaped member 32. The first arc-shaped member 31 and the second arc-shaped member 32 enclose a space to accommodate the conveying pump tube 1, and the end of the first arc-shaped member 31 away from the first rotating shaft 33 is connected to the connecting member 5.
[0024] Preferably, the end of the first arc-shaped member 31 away from the first rotating shaft 33 is connected to the connecting member 5 through the first support plate 35, the end of the second arc-shaped member 32 away from the first rotating shaft 33 is connected to the first support plate 35 through the second support plate 36, and the first fastener 34 penetrates the first support plate 35 and the second support plate 36 at the same time. In this embodiment, the shapes of the first arc-shaped member 31 and the second arc-shaped member 32 match the outer shape of the delivery pump tube 1, and the two enclose a space to accommodate the delivery pump tube 1, which can completely wrap the delivery pump tube 1 or wrap a partial structure, and can be applicable to the sizes of various models of delivery pump tubes 1, and has stronger adaptability. When not in use, unscrew the first fastener 34, and the first arc-shaped member 31 and the second arc-shaped member 32 are opened for easy storage and storage.
[0025] Preferably, the first support plate 35 includes a first body 351 and a first pad 352 which is at a first angle with the first body 351, the end of the first body 351 away from the first pad 352 is connected to the first arc-shaped member 31, the second support plate 36 includes a second body 361 and a second pad 362 which is at a second angle with the second body 361, the end of the second body 361 away from the second pad 362 is connected to the second arc-shaped member 32, the second pad 362 is connected to the connecting member 5 through the first pad 352, and the first fastener 34 passes through the first body 351 and the second body 361. Through the first angle, the second angle and the length of the connecting member 5, the angle and distance between the delivery pump pipe 1 and the vibrating rod 2 can be effectively controlled to achieve a better construction effect.
[0026] Preferably, the first pad 352 and the second pad 362 are both arranged in parallel with the connector 5. In this embodiment, the first pad 352 and the second pad 362 are sequentially arranged on the top of the connector 5, and the three are arranged in parallel and welded together in sequence. There is a surface contact of a certain distance between the first pad 352 and the connector 5 to make the connection more stable. They can be welded together or fixed by bolts or other structures, which is not specifically limited here.
[0027] Preferably, the third fixing member 4 includes a third arc member 41, a fourth arc member 42 rotatably connected to the third arc member 41 via a third rotating shaft 43, and a second fastener 44 connecting the third arc member 41 and the fourth arc member 42. The third arc member 41 and the fourth arc member 42 wrap the vibrating rod 2 and are connected to the connecting member 5 at the same time.
[0028] Preferably, the end of the third arc member 41 away from the third rotating shaft 43 is connected to the connecting member 5 through a third support plate 45, the end of the fourth arc member 42 away from the third rotating shaft 43 is connected to the third support plate 45 through a fourth support plate 46, and the second fastener 44 passes through both the third support plate 45 and the fourth support plate 46.
[0029] Preferably, the third support plate 45 includes a third main body 451 and a third pad 452 which is at a third angle to the third main body 451, the end of the third main body 451 away from the third pad 452 is connected to the third arc-shaped member 41, the fourth support plate 46 includes a fourth main body 461 and a fourth pad 462 which is at a fourth angle to the fourth main body 461, the end of the fourth main body 416 away from the fourth pad 462 is connected to the fourth arc-shaped member 42, the fourth pad 462 is connected to the connecting member 5 through the third pad 452, and the second fastener 44 simultaneously penetrates the third main body 451 and the fourth main body 461. In this embodiment, the connecting plate 5 is at a certain angle to the delivery pump pipe 1 and the vibrating rod 2, which can effectively ensure the quality of concrete pouring and vibration, improve construction efficiency, and save labor costs.
[0030] Preferably, an anti-skid pad 8 is provided between the third arc-shaped member 41, the fourth arc-shaped member 42 and the vibrating rod 1 to prevent them from falling off and causing quality problems of the concrete structure. The anti-skid pad 8 can be reused to improve the utilization rate of the equipment.
[0031] Preferably, the connecting member 5 is connected to the handle 7 via a third fastener 6, so that the fixing device can be held by hand for operation, which is more efficient.
[0032] When in use, according to the size of the concrete delivery pump pipe 1, select the first arc-shaped member 31, the second arc-shaped member 32 and the first rotating shaft 33 that match it, and splice them into the first fixing member 3. After wrapping the delivery pump pipe 1, the first main body 351 and the second main body 361 are fixed by the first fastener 34. At this time, the first fixing member 3 and the delivery pipe 1 are firmly fixed together, and then the second pad 362, the first pad 352 and the connecting member 5 are welded together in sequence, and the anti-slip pad 8 is filled between the first arc-shaped member 31, the second arc-shaped member 32 and the outer wall of the delivery pump pipe 1.
[0033] According to the size of the vibrating rod 2, select the third arc member 41, the third arc member 42 and the third rotating shaft 43 that match it, and assemble them into a third fixing member 4. After wrapping the vibrating rod 2, the third main body 451 and the fourth main body 461 are fixed by the second fastener 44. At this time, the third fixing member 4 and the vibrating rod 2 are firmly fixed together, and then the third pad 452, the fourth pad 462 and the connecting member 5 are welded together in sequence, and the anti-slip pad 8 is filled between the third arc member 41, the fourth arc member 42 and the outer wall of the vibrating rod 2.
[0034] The first fixing member 3 and the third fixing member 4 are arranged on the same side of the connecting member 5 to realize the mutual fixation of the delivery pump tube 1 and the vibrating rod 2. The side of the connecting member 5 away from the first fixing member 3 and the third fixing member 4 is connected to the handle 7 through the third fastener 6. When in use, multiple sets of fixing devices can be arranged in parallel between the delivery pump tube 1 and the vibrating rod 2, and connected to the same handle 7.
[0035] The advantages and positive effects of the utility model are as follows: the first fixing member, the third fixing member and the connecting member are provided, and the three cooperate with each other to achieve a firm fixation between the delivery pump pipe and the vibrating rod, and the pouring and vibrating process is more stable, which ensures the construction effect and improves the construction efficiency; two arc-shaped members connected by a rotating shaft are provided, which can be flexibly fixed according to the size of the delivery pump pipe or the vibrating rod, and have stronger applicability; the arc-shaped member and the connecting member are connected by a support plate to ensure the angle and distance between the delivery pump pipe and the vibrating rod, and achieve better pouring and vibrating effects. In addition, the device is simple to set up, easy to operate, and reusable.
[0036] The above is a detailed description of the embodiments of the utility model, but the contents are only preferred embodiments of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. A fixing device for optimizing concrete construction technology, which can be connected to a delivery pump pipe and a vibrating rod, characterized in that: It includes a first fixing part, a third fixing part and a connecting part. The delivery pump pipe is connected to the connecting part through the first fixing part, and the vibrating rod is connected to the connecting part through the third fixing part. Driving the connecting part can simultaneously drive the delivery pump pipe and the vibrating rod to move for pouring and vibration.
2. The fixing device for optimizing the concrete construction process according to claim 1 is characterized in that: The first fixing member includes a first arc-shaped member, a second arc-shaped member rotatably connected to the first arc-shaped member via a first rotating shaft, and a first fastener connecting the first arc-shaped member and the second arc-shaped member. The first arc-shaped member and the second arc-shaped member enclose a space to accommodate the delivery pump tube, and the end of the first arc-shaped member away from the first rotating shaft is connected to the connecting member.
3. The fixing device for optimizing the concrete construction process according to claim 2 is characterized in that: The end of the first arc-shaped member away from the first rotating shaft is connected to the connecting member through a first supporting plate, the end of the second arc-shaped member away from the first rotating shaft is connected to the first supporting plate through a second supporting plate, and the first fastener passes through both the first supporting plate and the second supporting plate.
4. The fixing device for optimizing the concrete construction process according to claim 3 is characterized in that: The first support plate includes a first main body and a first pad forming a first angle with the first main body, the end of the first main body away from the first pad is connected to the first arc-shaped member, the second support plate includes a second main body and a second pad forming a second angle with the second main body, the end of the second main body away from the second pad is connected to the second arc-shaped member, the second pad is connected to the connecting member through the first pad, and the first fastener passes through the first main body and the second main body at the same time.
5. The fixing device for optimizing the concrete construction process according to claim 4 is characterized in that: The first pad and the second pad are both arranged parallel to the connecting member.
6. The fixing device for optimizing concrete construction technology according to any one of claims 1 to 5, characterized in that: The third fixing member includes a third arc member, a fourth arc member rotatably connected to the third arc member via a third rotating shaft, and a second fastener connecting the third arc member and the fourth arc member. The third arc member and the fourth arc member wrap the vibrating rod and are connected to the connecting member at the same time.
7. The fixing device for optimizing concrete construction technology according to claim 6 is characterized in that: The end of the third arc-shaped member away from the third rotating shaft is connected to the connecting member through a third supporting plate, the end of the fourth arc-shaped member away from the third rotating shaft is connected to the third supporting plate through a fourth supporting plate, and the second fastener passes through the third supporting plate and the fourth supporting plate at the same time.
8. The fixing device for optimizing concrete construction technology according to claim 7 is characterized in that: The third support plate includes a third main body and a third pad forming a third angle with the third main body, the end of the third main body away from the third pad is connected to the third arc-shaped member, the fourth support plate includes a fourth main body and a fourth pad forming a fourth angle with the fourth main body, the end of the fourth main body away from the fourth pad is connected to the fourth arc-shaped member, the fourth pad is connected to the connecting member through the third pad, and the second fastener passes through the third main body and the fourth main body at the same time.
9. The fixing device for optimizing concrete construction technology according to claim 8 is characterized in that: Anti-skid pads are provided between the third arc-shaped member, the fourth arc-shaped member and the vibrating rod.
10. The fixing device for optimizing concrete construction technology according to any one of claims 1 to 5 and 7 to 9, characterized in that: The connecting piece is connected to the handle via a third fastener.