Screw hole plugging structure for wall-attached support of climbing frame

By using a sealing structure combined with prefabricated mandrel and sealing material, the problems of complex construction and poor durability of traditional screw hole sealing methods are solved, and convenient construction, efficient sealing and long-term sealing effects are achieved.

CN222759444UActive Publication Date: 2025-04-15SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420766779.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2025-04-15
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

The traditional screw hole sealing method has many construction processes, low efficiency, and poor durability of foam glue, which is prone to later leakage problems.

Method used

A sealing structure is adopted that combines prefabricated mandrel and sealing material. The prefabricated mandrel is equipped with a sealing ring, and the sealing material is filled between the screw hole and the mandrel, and polymer cement waterproof coating is sealed at the connection.

Benefits of technology

The construction process is simplified, the sealing efficiency is improved, and the depth and compactness of the stuffing filling are controllable. The prefabricated mandrel is consistent with the exterior wall material, which is not easy to age, and reduces the risk of leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222759444U_ABST
    Figure CN222759444U_ABST
Patent Text Reader

Abstract

The utility model discloses a climbing frame wall-attached support screw hole plugging structure which comprises a building body and a screw hole penetrating through the building body, one end of the screw hole is provided with a chambering structure, a prefabricated core rod is arranged in the screw hole, the prefabricated core rod is provided with a sealing ring, a bin sealing material is filled between the screw hole and the prefabricated core rod, and the sealing ring is provided with a sealing ring. And the joint of the reaming structure and the bin sealing material is coated with a polymer cement waterproof coating in a sealing manner. The plugging structure has the advantages that compared with a traditional method for plugging a screw hole through cement mortar, the compactness of the prefabricated circular truncated cone core rod can be checked outside the hole, the size is standard, and it can be guaranteed that the depth of plugging and filling and the compactness are controllable; the prefabricated core rod is made of a concrete material consistent with the outer wall, is not easy to age and has the same service life as the structure; when the prefabricated core rod is adopted for plugging, only chambering, slurry wrapping and filling are needed, the working procedure is simple, the plugging construction efficiency is high, and the construction period can be shortened to a great extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a screw hole blocking structure for a climbing frame wall support. Background Art

[0002] Climbing frames are becoming more and more popular in high-rise buildings and are widely used. The wall-mounted support of the climbing frame is fixed to the exterior wall of the building through high-strength screws. When pouring the exterior wall concrete, DN40 PVC sleeves need to be pre-buried in advance. Such pre-buried sleeves are large in number and diameter. If they cannot be sealed with high quality, they are very likely to cause a greater risk of leakage and moisture.

[0003] Traditional screw hole plugging usually requires expanding the hole, then chiseling out the internal PVC sleeve, plugging the dry cement mortar from the outside, and injecting polyurethane foam glue into the bolt hole from the inside after the cement mortar on the outside has finally set, leaving 20mm on the inside for the foam glue to be dried and hardened before plugging with cement mortar. This method has many construction processes and low efficiency. Although it can achieve a good plugging effect in the short term, it is very easy to have leakage problems in the later stage due to the poor durability of the foam glue. Utility Model Content

[0004] The purpose of the utility model is to provide a climbing frame wall support screw hole blocking structure based on the above-mentioned deficiencies in the prior art. The structure is convenient to construct, has high efficiency and good construction quality, and can better solve the above-mentioned problems.

[0005] The purpose of this utility model is achieved by the following technical solutions:

[0006] A screw hole sealing structure for a climbing frame wall support comprises a building body and a screw hole that passes through the building body and has an expansion structure at one end, wherein a prefabricated core rod is provided in the screw hole, the prefabricated core rod is provided with a sealing ring, a sealing material is filled between the screw hole and the prefabricated core rod, and a polymer cement waterproof coating is applied to the connection between the expansion structure and the sealing material.

[0007] Optionally, the sealing material covers the prefabricated core rod and the sealing ring.

[0008] Optionally, the prefabricated core rod comprises a core rod body and an enlarged section whose size gradually increases toward one end of the hole expansion structure, and the structure of the enlarged section is consistent with the hole expansion structure.

[0009] Optionally, the circumferential dimension of the core rod body gradually decreases from one end close to the expansion section to one end away from the expansion section and presents a wedge-shaped structure.

[0010] Optionally, a surface of the core rod body is provided with a plurality of roughened lines.

[0011] Optionally, the prefabricated core rod is in a cylindrical, triangular, square or variable columnar structure.

[0012] Optionally, a plurality of the napped lines are arranged on the outer circumferential surface of the mandrel body in a circumferentially uniform and inclined manner.

[0013] Optionally, the sealing ring divides the mandrel body into a left mandrel section and a right mandrel section, and the napped line is arranged on the left mandrel section or the right mandrel section or both.

[0014] Optionally, the prefabricated core rod is provided with a sealing groove for accommodating the sealing ring.

[0015] Optionally, when the sealing material solidifies, the sealing ring is tightly embedded in the sealing material.

[0016] The advantages of the utility model are: compared with the traditional cement mortar plugging method for screw holes, the sealing structure of the utility model can check the density of the prefabricated truncated cone core rod outside the hole, and the size is standard, which can ensure that the depth and density of the filling can be controlled; the prefabricated core rod adopts the same concrete material as the exterior wall, is not easy to age, and has the same lifespan as the structure; the use of prefabricated core rods for sealing only requires hole expansion, mortar coating and filling, the process is simple, the sealing construction efficiency is high, and the construction period can be shortened to a great extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a cross-sectional view of the screw hole plugging of the utility model;

[0018] Figure 2 This is a cross-sectional view of the floor screw hole plugging of the utility model;

[0019] Figure 3 This is a mandrel mold assembly diagram of the utility model;

[0020] Figure 4 This is a single core rod mold diagram of the utility model;

[0021] Figure 5 This is a cross-sectional view of a core rod mold of the utility model;

[0022] Figure 6 The utility model relates to a prefabricated concrete core rod. DETAILED DESCRIPTION

[0023] The marks in the figure are: 1. concrete exterior wall, 2. prefabricated core rod, 3. sealing material, 4. sealing ring, 5. expansion section, 6. sealing groove, 7. roughened line, 8. roughened groove, 9. upper section of mold, 10. lower section of mold, 11. pallet, 12. U-shaped hoop, 13. fastening bolt, 14. polymer cement waterproof coating, 15. floor, 16. steel wire, 17. short steel bar, 20. screw hole, 21. expansion structure, 22. core rod body, 221. left section of core rod, 222. right section of core rod.

[0024] Example: See Figure 1 As shown, an embodiment of a screw hole sealing structure for a climbing frame attached to a wall support is shown, comprising a building body and a screw hole 21 that passes through the building body and has an expansion structure 20 at one end, wherein a prefabricated core rod 2 is provided in the screw hole 21, the prefabricated core rod 2 is provided with a sealing ring 4, a sealing material 3 is filled between the screw hole 21 and the prefabricated core rod 2, and a polymer cement waterproof coating 14 is coated at the connection between the expansion structure 20 and the sealing material 3.

[0025] In this embodiment, the sealing material 3 covers the prefabricated core rod 2 and the sealing ring 4.

[0026] In this embodiment, the prefabricated mandrel 2 includes a mandrel body 22 and an enlarged section 5 whose size gradually increases toward one end of the reaming structure 20, and the structure of the enlarged section 5 is consistent with the reaming structure 21. The circumferential size of the mandrel body 2 gradually decreases from one end close to the enlarged section 5 to one end away from the enlarged section 5 and presents a wedge-shaped structure, and a plurality of roughened lines 7 are provided on the surface of the mandrel body 2. The prefabricated mandrel 2 is cylindrical, triangular, square or variable columnar, and a plurality of roughened lines 7 are uniformly inclined and arranged on the outer circumferential surface of the mandrel body 22 in the circumferential direction.

[0027] In this embodiment, the sealing ring 4 divides the core rod body 22 into a core rod left section 221 and a core rod right section 222, the drawn line 7 is arranged on the core rod left section 221 or the core rod right section 222 or the core rod left section 221 and the core rod right section 222, and the prefabricated core rod 2 is provided with a sealing groove 6 for accommodating the sealing ring 4.

[0028] In this embodiment, after the sealing material 3 solidifies, the sealing ring 4 is tightly embedded in the sealing material 3 .

[0029] The characteristics and functions of the present invention can be further understood through the following description.

[0030] like Figure 1-5 As shown, this embodiment also provides a method for sealing a screw hole of a climbing frame wall support, including a PVC screw hole 20, the screw hole 20 passes through the concrete outer wall 1 (such as Figure 1 as shown) or floor 15 (as shown Figure 2As shown in the figure, on both sides, the mold is assembled on site to make the prefabricated core rod 2, and after reaching the required strength, it is wrapped with the sealing material 3 and inserted into the treated screw hole 20. After the two sides are finished, the polymer cement waterproof coating 14 is applied on the water-facing surface.

[0031] like Figure 3 As shown, the method for manufacturing the prefabricated core rod 2 comprises the following steps:

[0032] S1, assemble the lower half of the mandrel mold 10 and place it on a flat surface;

[0033] S2, assemble the upper half 9 of the mandrel mold and bind it at the middle and upper part using the clamping plate 11, U-shaped hoop 12 and fastening bolts 13;

[0034] S3, the bound upper section 9 and the lower section 10 are combined, and the middle joint is also assembled using a clamping plate 11, a U-shaped hoop 12, and fastening bolts 13 to complete the overall assembly.

[0035] S4. Use concrete with the same grade as the wall to complete the pouring of the prefabricated core rod 2. After pouring, put it into the curing room for curing and standby.

[0036] like Figure 4 , Figure 5 and Figure 6 As shown, further, the specification size of the prefabricated core rod 2 is 5 mm smaller than the size of the screw hole 20, and it can be used after curing for more than 7 days after demolding; the sealing groove 6 and the roughening groove 8 are pre-processed in the core rod mold, and the roughening line 7 is formed on the surface of the prefabricated core rod 2 at one time after demolding; the core rod mold can only use the upper half 9, and a prefabricated core rod 2 with a length of 110 mm can be produced for sealing the bolt holes of balcony panels.

[0037] This embodiment also discloses a method for sealing a screw hole of a climbing frame wall support, comprising the following steps:

[0038] S1, using a pagoda drill bit to complete the expansion of the outer screw hole 20 to form an expansion hole structure 21, after the expansion is completed, the debris in the hole is cleaned up, and the surrounding area is watered to moisten it;

[0039] S2, using the sealing material 3 for component caulking, the strength is 45-60MPa;

[0040] S3, after the sealing material 3 is configured, the sealing ring 4 is inserted into the sealing groove 6 of the prefabricated core rod 2, wrapped with the sealing material 3 and inserted into the screw hole 20;

[0041] S4. The overflowed silo slurry is trimmed to make it level with the structural wall surface;

[0042] S5. After the plugging is completed, the polymer cement waterproof coating 14 is applied to the exterior wall. After the waterproof coating is dry, a water spray test is performed. If there is no leakage point, the subsequent indoor decoration work of the insulation room can be carried out.

[0043] Furthermore, the water spray test on the outside of the wall shall be no less than 1h; the sealing material shall be mixed and prepared according to the manufacturer's instructions and used within 30 minutes; the polymer cement waterproof coating 14 shall be applied in multiple layers to the outdoor side hole and the surrounding 100×100 range, with a coating thickness of no less than 1.2mm; for the external wall screw hole 20, plug it from the outside to the inside (such as Figure 1 As shown, the floor 15 is inserted from bottom to top (as shown in FIG. Figure 2 As shown), a pre-buried steel wire 16 is left on the upper part of the prefabricated core rod 2, which is connected to the short steel bar 17 to ensure that the prefabricated core rod 2 will not fall.

[0044] Furthermore, for the method of sealing the prefabricated core rod 2 of the floor slab, the enlarged section 5 of the prefabricated core rod 2 can ensure that the sealing material 4 will not fall.

[0045] To sum up, the advantages of the utility model are: compared with the traditional cement mortar plugging method for screw holes, the sealing structure of the utility model can check the density of the prefabricated conical core rod outside the hole, and the size is standard, which can ensure that the depth and density of the filling can be controlled; the prefabricated core rod adopts the same concrete material as the exterior wall, is not easy to age, and has the same lifespan as the structure; the use of prefabricated core rods for sealing only requires hole expansion, mortar coating and filling, the process is simple, the sealing construction efficiency is high, and the construction period can be shortened to a great extent.

[0046] The above are only preferred embodiments of the present invention, and do not limit the implementation mode and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A screw hole sealing structure for a climbing frame wall support, comprising a building body and a screw hole penetrating the building body and having an expansion hole structure at one end, characterized in that: A prefabricated core rod is arranged in the screw hole, the prefabricated core rod is provided with a sealing ring, a sealing material is filled between the screw hole and the prefabricated core rod, and a polymer cement waterproof coating is coated at the connection between the hole expansion structure and the sealing material.

2. The screw hole sealing structure of the climbing frame wall support according to claim 1 is characterized in that: The sealing material covers the prefabricated core rod and the sealing ring.

3. The screw hole blocking structure of the climbing frame wall support according to claim 2 is characterized in that: The prefabricated core rod comprises a core rod body and an enlarged section whose size gradually increases toward one end of the hole expansion structure, and the structure of the enlarged section is consistent with the hole expansion structure.

4. The screw hole sealing structure of the climbing frame wall support according to claim 3 is characterized in that: The circumferential dimension of the core rod body gradually decreases from one end close to the enlarged section to one end away from the enlarged section and presents a wedge-shaped structure.

5. The screw hole sealing structure of the climbing frame wall support according to claim 4 is characterized in that: The surface of the core rod body is provided with a plurality of roughened lines.

6. The screw hole sealing structure of the climbing frame wall support according to claim 5 is characterized in that: The prefabricated core rod is in a cylindrical, triangular, square or variable columnar structure.

7. The screw hole sealing structure of the climbing frame wall support according to claim 6 is characterized in that: The plurality of napped lines are evenly and circumferentially arranged on the outer peripheral surface of the mandrel body.

8. The screw hole sealing structure of the climbing frame wall support according to claim 7 is characterized in that: The sealing ring divides the mandrel body into a left mandrel section and a right mandrel section, and the napped line is arranged on the left mandrel section or the right mandrel section or both.

9. The screw hole sealing structure of the climbing frame wall support according to claim 8 is characterized in that: The prefabricated core rod is provided with a sealing groove for accommodating the sealing ring.

10. The screw hole sealing structure of the climbing frame wall support according to claim 9 is characterized in that: When the sealing material is solidified, the sealing ring is tightly embedded in the sealing material.