Water pump mounting structure of oil separator sewage lifting box

By using a water pump installation structure with a clamping fixture in the catering oil-water separation and treatment equipment, the problem of the installation of the pump pump in the prior art requires multiple people to operate together and is time-consuming and labor-intensive, and simple and convenient installation and disassembly are achieved, reducing the impact of oil pollution.

CN222759930UActive Publication Date: 2025-04-15GUANGZHOU LONT ENVIRONMENTAL SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421575386.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-15
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

The pump installation structure of the sewage lifting box in the existing catering oil-water separation and treatment equipment requires at least 2 people to operate together, and the installation and disassembly are time-consuming and labor-intensive, and oil pollution affects maintenance.

Method used

A water pump installation structure for oil sewage lifting tank is designed, using a clamping fixture, including a front fixing piece and a rear fixing piece, and an open-closing structure is formed through a rotating shaft, and the water pump's own weight is used to achieve the connection between the outlet pipe and the connection pipe.

Benefits of technology

It realizes the simple and convenient installation and disassembly of the pump, saving time and effort, and reducing the impact of oil pollution on maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222759930U_ABST
    Figure CN222759930U_ABST
Patent Text Reader

Abstract

The utility model relates to a water pump installation structure of a sewage lifting box of an oil separator, which comprises a first butt flange of a water outlet pipe on a water pump and a second butt flange of a connecting-out pipe, a sealing gasket is arranged between the first butt flange and the second butt flange, the first butt flange and the second butt flange are provided with a clamping fixer, and the clamping fixer is provided with a clamping groove. The clamping fixer comprises a front fixing piece and a rear fixing piece, and a rotating shaft is arranged at one end of the front fixing piece and one end of the rear fixing piece for mutual connection; the inner side of the front fixing piece is provided with a front positioner for fixing the first butt flange, and the inner side of the rear fixing piece is provided with a rear positioner for fixing the second butt flange. The first butt flange of the water outlet pipe on the water pump and the second butt flange of the outlet pipe on the water pump are fixed and positioned through the front fixing piece and the rear fixing piece of the clamping fixator. Compared with a traditional water pump mounting structure of the sewage lifting box in catering oil-water separation treatment equipment, the water pump mounting structure is simple and convenient to mount, time-saving and labor-saving, and the water pump is more convenient to mount, dismount, clean and maintain.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to catering oil-water separation processing equipment, in particular to a water pump installation structure of a sewage lifting box in the catering oil-water separation processing equipment. Background Art

[0002] At present, the connection between the water pump of the sewage lifting tank in the catering oil-water separation treatment equipment and the outlet pipe is usually fixed by connecting the docking flange of the outlet pipe on the water pump and the docking flange of the outlet pipe with each other using multiple bolts. This installation structure usually requires at least two people to work together, and the installation and disassembly are time-consuming and laborious. In the catering oil-water separation treatment equipment, the water pump of the sewage lifting tank needs to be taken out for cleaning and maintenance after a period of use, and the water pump of the existing sewage lifting tank will be stained with oil during use, which has a significant impact on the installation or disassembly, cleaning and maintenance of the water pump of the existing sewage lifting tank. Utility Model Content

[0003] The purpose of the utility model is to solve the above-mentioned technical problems existing in the installation of a water pump for an existing oil separator tank, and to provide a water pump installation structure for an oil separator sewage lifting tank.

[0004] The water pump installation structure of the oil separator sewage lifting box includes a docking flange 1 of the outlet pipe on the water pump and a docking flange 2 of the outlet pipe, a sealing gasket is arranged between the docking flange 1 and the docking flange 2, a clamping fixture is arranged on the docking flange 1 and the docking flange 2, the clamping fixture includes a front fixing plate and a rear fixing plate, the front fixing plate and the rear fixing plate are respectively provided with a mounting recess, a rotating shaft is arranged at one end of the front fixing plate and the rear fixing plate to connect with each other, so that the front fixing plate and the rear fixing plate form an open-and-close structure, and the front fixing plate and the rear fixing plate retain a A matching spacing is used to match and clamp the docking flange 1 and the docking flange 2 with each other; a front positioner for fixing the docking flange 1 is provided on the inner side of the front fixing plate, and the front positioner corresponds to the mounting hole 1 set on the docking flange 1; a rear positioner for fixing the docking flange 2 is provided on the inner side of the rear fixing plate, and the rear positioner corresponds to the mounting hole 2 set on the docking flange 2; the docking flange 1 of the outlet pipe on the water pump and the docking flange 2 of the connecting pipe are fixed and positioned by the front fixing plate and the rear fixing plate of the clamping fixture, and the outlet pipe and the connecting pipe are connected to each other by the dead weight of the water pump.

[0005] Furthermore, the front positioner is composed of two or more positioning bosses on the front fixing plate.

[0006] Furthermore, the rear positioner is composed of two or more fixing bosses on the rear fixing plate.

[0007] Furthermore, the front fixing plate and / or the rear fixing plate is a right-angle structure.

[0008] Furthermore, an arc-shaped protrusion is provided on the inner side of the rear fixing plate.

[0009] Furthermore, the thickness of the front fixing plate and the rear fixing plate is 5-10 mm.

[0010] Furthermore, the fitting spacing is equal to the fitting thickness of the docking flange 1 and the docking flange 2.

[0011] Beneficial effects of the utility model: compared with the water pump installation structure of the sewage lifting box in the traditional catering oil-water separation treatment equipment, the utility model is simple and convenient to install, saves time and labor, and is more convenient for water pump installation, disassembly, cleaning and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of an embodiment of the utility model.

[0013] Figure 2 for Figure 1 An enlarged schematic diagram of point A.

[0014] Figure 3 This is a front view of the clamping and fixing structure of an embodiment of the utility model.

[0015] Figure 4 for Figure 3 Side view of.

[0016] Figure 5 This is a schematic diagram of the open state of the clamping fixture of the embodiment of the utility model. DETAILED DESCRIPTION

[0017] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0018] Reference Figures 1 to 5The water pump installation structure of the oil separator sewage lifting tank shown in the figure includes a docking flange 1 3 at one end of the outlet pipe 2 on the water pump 1 and a docking flange 2 5 at one end of the connecting pipe 4, a sealing gasket 6 is provided between the docking flange 1 3 and the docking flange 2 5, and a clamping fixture 7 is provided on the docking flange 1 3 and the docking flange 2 5, and the clamping fixture 7 includes a front fixing plate 71 and a rear fixing plate 72, and the front fixing plate 71 and the rear fixing plate 72 are respectively provided with an installation recess 73, and the installation recess 73 is located on the outer diameter position of the outlet pipe 2 and the connecting pipe 4 when installed and fixed, so that the front fixing plate 71 and the rear fixing plate 72 of the clamping fixture 7 are respectively fixed to the docking flange 1 3 and the docking flange 2 5 away from the outlet pipe 2 and the connecting pipe 4 when installed. One end of the front fixing plate 71 and the rear fixing plate 72 are provided with a rotating shaft 74 to connect with each other, so that the front fixing plate 71 and the rear fixing plate 72 form an opening and closing structure, and its structural principle is similar to that of a conventional door hinge. The front fixing plate 71 and the rear fixing plate 72 retain a fitting spacing 8 when they are in a closed state, that is, when the front fixing plate 71 and the rear fixing plate 72 are folded, a fitting spacing 8 is formed, and the fitting spacing 8 is used to fit and fix the docking flange 1 3 and the docking flange 2 5. In order to better position and match the docking flange 13 and the docking flange 25 when docking, a front locator 711 for fixing the docking flange 3 is provided on the inner side of the front fixing plate 71, and the front locator 711 corresponds to the mounting hole 131 set on the docking flange 3, and a rear locator 721 for fixing the docking flange 25 is provided on the inner side of the rear fixing plate 72, and the rear locator 721 corresponds to the mounting hole 251 set on the docking flange 25; the docking flange 13 of the water outlet pipe 2 on the water pump 1 and the docking flange 25 of the connecting pipe 4 are fixed and positioned by the front fixing plate 71 and the rear fixing plate 72 of the clamping fixture 7, and the water outlet pipe 2 and the connecting pipe 4 are connected to each other by the dead weight of the water pump 1.

[0019] In the embodiment, the thickness of the front fixing plate 71 and the rear fixing plate 72 is 5-10 mm. The fitting spacing 8 is equal to the fitting thickness of the docking flange 1 3 and the docking flange 2 5, and the fitting thickness includes the application thickness of the sealing gasket 6. Specifically, the fitting spacing 8 is equal to or slightly smaller than the sum of the fitting thicknesses of the docking flange 1 3, the docking flange 2 5 and the sealing gasket 6.

[0020] The front fixing piece 71 and / or the rear fixing piece 72 are of a right-angle structure, so that the front fixing piece 71 and the rear fixing piece 72 form a fixed slot when they are in a closed state after being connected and fixed to each other by the rotating shaft 74 .

[0021] The front positioner 711 is composed of two or more positioning convex columns 7111 on the front fixing plate 71, and the positioning convex columns 7111 are cylindrical bodies arranged on the front fixing plate 71. The rear positioner 721 is composed of two or more fixing convex columns 7211 on the rear fixing plate 72, and the fixing convex columns 7211 are cylindrical bodies arranged on the rear fixing plate 72. The front positioner 711 and the rear positioner 721 act on the positioning of the docking flange 1 3 and the docking flange 2 5, and then the docking flange 1 3 and the docking flange 2 5 are pressed by the front fixing plate 71 and the rear fixing plate 72 to realize the docking of the outlet pipe 2 and the outlet pipe 4.

[0022] In order to make the docking flange 1 3 and the docking flange 2 5 fit and press each other better, an arc-shaped protrusion 75 is provided on the inner side of the rear fixing plate 72 so that the middle part of the inner side of the rear fixing plate 72 is stressed at the middle position of the docking flange 2 5 .

[0023] When the utility model is used, firstly, the docking flange 13 of the outlet pipe 2 on the water pump 1 and the docking flange 25 of the outlet pipe 4 are placed at the pre-matching position, so that the outlet pipe 2 and the outlet pipe 4 are in the docking position; secondly, the front fixing plate 71 and the rear fixing plate 711 of the opened clamping fixture 7 are placed on both sides of the docking flange 13 and the docking flange 25 respectively; then, the front positioner 711 of the front fixing plate 71 cooperates with the mounting hole 131 of the docking flange 3 to prevent the docking flange 3 from moving, such as preventing the docking flange 3 from being displaced or rotating, and the rear positioner 721 of the rear fixing plate 72 Cooperate with the mounting hole 251 of the docking flange 25 to prevent the docking flange 25 from moving, such as preventing the docking flange 25 from deviating, displacing or rotating, so that the docking flange 13 and the docking flange 25 are positioned and fixed at corresponding positions. Finally, the water pump is placed on the lifting box of the oil separator sewage in a suspended state, so that the water pump 1 pulls down the outlet pipe 2 by its own weight. At this time, the docking flange 13 of the outlet pipe 2 is pressed against the docking flange 25 of the connecting pipe 4, and a tight fit is formed through the sealing gasket 6, thereby completing the docking of the outlet pipe 2 and the connecting pipe 4. There is no need to use bolts to fix it, and the installation is simple and convenient.

Claims

1. A water pump installation structure for a grease trap sewage lifting tank, comprising a first butt flange (3) of a water outlet pipe (2) on a water pump (1) and a second butt flange (5) of a water outlet pipe (4), wherein a sealing gasket (6) is provided between the first butt flange (3) and the second butt flange (5), and wherein: A clamping fixture (7) is provided on the docking flange 1 (3) and the docking flange 2 (5), and the clamping fixture (7) includes a front fixing plate (71) and a rear fixing plate (72), and the front fixing plate (71) and the rear fixing plate (72) are respectively provided with a mounting notch (73), and a rotating shaft (74) is provided at one end of the front fixing plate (71) and the rear fixing plate (72) to connect with each other, so that the front fixing plate (71) and the rear fixing plate (72) form an open-close structure. The front fixing plate (71) and the rear fixing plate (72) retain a matching spacing (8) when in a closed state, and the matching spacing (8) is used to match and clamp the docking flange 1 (3) and the docking flange 2 (5) to each other; so that the front fixing plate (71) and the rear fixing plate (72) form an open-close structure; the front fixing plate (71) and the rear fixing plate (72) retain a spacing (8) for limiting the loosening of the docking flange 1 (3) and the docking flange 2 (5) when in a closed state; A front locator (711) for fixing the first docking flange (3) is provided on the inner side of the front fixing plate (71), and the front locator (711) corresponds to the first mounting hole (31) provided on the first docking flange (3); a rear locator (721) for fixing the second docking flange (5) is provided on the inner side of the rear fixing plate (72), and the rear locator (721) corresponds to the second mounting hole (51) provided on the second docking flange (5); The first butt joint flange (3) of the water outlet pipe (2) on the water pump (1) and the second butt joint flange (5) of the outlet pipe (4) are fixed in position by a front fixing plate (71) and a rear fixing plate (72) of a clamping fixture (7), and the water outlet pipe (2) and the outlet pipe (4) are butt jointed with each other by the deadweight of the water pump (1).

2. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: The front positioner (711) is composed of two or more positioning bosses (7111) on the front fixing plate (71).

3. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: The rear positioner (721) is composed of two or more fixing bosses (7211) on the rear fixing plate (72).

4. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: The front fixing plate (71) and / or the rear fixing plate (72) are of a right-angle structure.

5. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: An arc-shaped protrusion (75) is provided on the inner side of the rear fixing plate (72).

6. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: The thickness of the front fixing plate (71) and the rear fixing plate (72) is 5-10 mm.

7. The water pump installation structure of the oil separator sewage lifting tank according to claim 1 is characterized by: The matching spacing (8) is equal to the matching thickness of the docking flange 1 (3) and the docking flange 2 (5).