Quick connecting device for municipal pipeline maintenance
By designing a quick connection device including connecting jackets, rubber pads, telescopic air pressure cylinders and pressure sensors, the problem of high cost and single function of rapid connection devices for municipal pipeline maintenance in the prior art is solved, and a more efficient installation and sealing effect is achieved, adapting to complex pipeline maintenance situations.
Patent Information
- Application Number
- CN202420873106.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-04-25
AI Technical Summary
The existing quick connection device for municipal pipeline repair has a high cost, which increases the cost of pipeline repair and is single in function, making it unable to adapt to complex pipeline repair situations.
A quick connection device including two connecting jackets, rubber pads, telescopic air pressure cylinders and pressure sensors is designed to increase sealing through rubber pads. The telescopic air pressure cylinders and pressure sensors are used for sealing and installation assistance, improving the efficiency and adaptability of the device.
The device reduces the time investment and waste of water resources for pipeline maintenance, improves installation speed and sealing effect, and is suitable for complex pipeline maintenance situations.
Smart Images

Figure CN222760538U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a connection device, in particular to a quick connection device for municipal pipeline maintenance, belonging to the technical field of pipeline maintenance. Background Art
[0002] A pipeline is a device connected by pipes, pipe connectors and valves for transporting gas, liquid or fluid with solid particles. Pipes are widely used, mainly in water supply, drainage, heating, gas supply, long-distance transportation of oil and natural gas, agricultural irrigation, hydraulic engineering and various industrial devices. In the process of using pipelines, various equipment will be used to avoid pipeline damage and need to be repaired.
[0003] For example, the existing patent application number is: 202120475921.9. The utility model relates to the field of municipal pipeline maintenance technology, and discloses a quick connection device for municipal pipeline maintenance, wherein a left sealing ring gasket is embedded and clamped on the inner side of the left sealing tube, and an abutment flange is provided at the top end of the left sealing tube, and a right sealing ring gasket is embedded and clamped on the inner side of the right sealing tube, and an abutment groove is embedded at the top end of the right sealing tube, and a right flange is provided at the top end of the outer side of the right sealing tube.
[0004] Although the connecting device is easy to use and has a simple structure, the disposable device has a high cost of use, which increases the cost of pipeline maintenance and the cost investment of municipal pipeline maintenance. In addition, it has a single function and cannot adapt to complex pipeline maintenance situations. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] The purpose of the utility model is to provide a quick connection device for municipal pipeline maintenance in order to solve the above-mentioned problems, so as to solve the problems in the prior art that the disposable device has high use cost, increases the cost of pipeline maintenance, increases the cost investment of municipal pipeline maintenance, and has a single function and cannot adapt to complex pipeline maintenance situations.
[0007] (II) Technical solution
[0008] The utility model is realized through the following technical scheme: a quick connection device for municipal pipeline maintenance, including a pipeline structure, two connecting sleeves are arranged on the outside of the pipeline structure, one side of the inside of the two connecting sleeves is fixedly connected with a rubber pad, the rubber pad is wrapped around the outside of the water diversion pipeline after deformation, the rubber pad increases the sealing between the water diversion pipeline and the connecting sleeve, the two connecting sleeves are both provided with a movement groove, an upper sealing plate is arranged on the top of the inner cavity of the movement groove, a top sealing box is arranged on the outside of the upper sealing plate, a first telescopic pneumatic cylinder is arranged inside the top sealing box, a lower sealing plate is arranged on the bottom of the inner cavity of the movement groove, a pressure sensor is arranged at the bottom of the lower sealing plate, a bottom sealing box is arranged on the outside of the lower sealing plate, and a second telescopic pneumatic cylinder is arranged inside the bottom sealing box.
[0009] Preferably, the pipeline structure comprises a water diversion pipeline, the internal thread of the water diversion pipeline is connected to an external threaded pipe, and a reserve pipeline is fixedly sleeved on the outside of the external threaded pipe.
[0010] Preferably, a plurality of threaded holes are provided on the outer sides of the two connecting sleeves, and a fixing bolt is provided on the top of one of the threaded holes.
[0011] Preferably, an elastic member is fixedly connected between the two connecting sleeves, a handle is fixedly connected to one side of the top sealing box and the bottom sealing box, and the top sealing box and the bottom sealing box are fixedly connected to the adjacent connecting sleeves.
[0012] Preferably, the extending end of the first telescopic pneumatic cylinder is fixedly connected to the upper sealing plate, and the first telescopic pneumatic cylinder is fixedly installed inside the top sealing box.
[0013] Preferably, the second telescopic pneumatic cylinder is fixedly installed inside the bottom sealing box, the pressure sensor is arranged at the extending end of the second telescopic pneumatic cylinder, a groove is opened on the outer side of the lower sealing plate, the pressure sensor is arranged inside the groove and fixedly connected to the lower sealing plate.
[0014] Preferably, a battery is fixedly connected to one side of the bottom sealing box, and a button is installed on one side of the battery.
[0015] The utility model provides a quick connection device for municipal pipeline maintenance, which has the following beneficial effects:
[0016] 1. The quick connection device for municipal pipeline maintenance uses an external threaded pipe that is rotated and inserted into the water diversion pipe to fix the preparation pipe and the water diversion pipe together. During this process, the gap between the preparation pipe and the two connection jackets is small, and the water flow sprayed to the outside of the connection jacket is small, which will not affect the staff. After the staff aligns the preparation pipe with the water diversion pipe, the preparation pipe moves toward the water diversion pipe under the guidance of the two connection jackets. The water sprayed from the water diversion pipe will not affect the installation of the preparation pipe, which increases the speed of installation and fixation of the preparation pipe and the water diversion pipe and reduces time investment.
[0017] 2. The municipal pipeline maintenance quick connection device, the upper sealing plate and the lower sealing plate constitute a blocking plate, the upper sealing plate, the lower sealing plate, the top sealing box and the bottom sealing box seal the two connecting sleeves. During this process, the prepared pipe does not leave between the two connecting sleeves, and most of the water inside the upward water diversion pipe is guided by the prepared pipe, avoiding the situation where water inside the water diversion pipe sprays out after the prepared pipe is disassembled, and quickly seals one end of the water diversion pipe, providing time for the staff to replace the prepared pipe and reduce the waste of water resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the structure of the top sealing box of the utility model;
[0020] Figure 3 This is a schematic diagram of the structure of the upper sealing plate of the utility model;
[0021] Figure 4 It is a structural schematic diagram of the connecting jacket of the utility model.
[0022]
Main component symbol description
[0023] 1. Connecting sleeve; 2. Rubber pad; 3. Top sealing box; 4. Bottom sealing box; 5. Handle; 6. First telescopic pneumatic cylinder; 7. Upper sealing plate; 8. Lower sealing plate; 9. Second telescopic pneumatic cylinder; 10. Groove; 11. Pressure sensor; 12. Movement groove; 13. Threaded hole; 14. Fixing bolt; 15. Elastic part; 16. Battery; 17. Button; 18. Water diversion pipe; 19. Prepared pipe; 20. Externally threaded pipe. DETAILED DESCRIPTION
[0024] The embodiment of the utility model provides a quick connection device for repairing municipal pipelines.
[0025] See also Figure 1 , Figure 2 , Figure 3 and Figure 4 , including a pipeline structure, two connecting sleeves 1 are arranged on the outside of the pipeline structure, and a rubber pad 2 is fixedly connected to one side of the two connecting sleeves 1. The two connecting sleeves 1 are both provided with a movement groove 12, and an upper sealing plate 7 is arranged on the top of the inner cavity of the movement groove 12, and a top sealing box 3 is arranged on the outside of the upper sealing plate 7. A first telescopic pneumatic cylinder 6 is arranged inside the top sealing box 3, a lower sealing plate 8 is arranged at the bottom of the inner cavity of the movement groove 12, and a pressure sensor 11 is arranged at the bottom of the lower sealing plate 8, a bottom sealing box 4 is sleeved on the outside of the lower sealing plate 8, and a second telescopic pneumatic cylinder 9 is arranged inside the bottom sealing box 4.
[0026] When the utility model is in use: the pipeline structure includes a water diversion pipeline 18, an external threaded pipe 20 is threadedly connected inside the water diversion pipeline 18, and one end of the external threaded pipe 20 extends to the inside of a preparation pipeline 19 and is fixedly connected to the preparation pipeline 19. When the preparation pipeline 19 is damaged, the two connecting sleeves 1 are sleeved onto the outside of the water diversion pipeline 18, and a part of the connecting sleeve 1 and the rubber pad 2 are controlled to be arranged on the outside of the preparation pipeline 19.
[0027] A plurality of threaded holes 13 are provided on the outside of the two connecting sleeves 1. A fixing bolt 14 is aligned with one of the threaded holes 13. Figure 4 As shown, after the fixing bolt 14 is rotated and inserted into the threaded hole 13 opened in the connecting sleeve 1, the two connecting sleeves 1 are fixed together. At this time, the rubber pad 2 fixed to the connecting sleeve 1 is deformed and wrapped around the outside of the water diversion pipe 18, and the rubber pad 2 increases the sealing between the water diversion pipe 18 and the connecting sleeve 1. A battery 16 is fixedly connected to one side of the bottom sealing box 4, and the battery 16 stores electricity. After pressing the button 17 installed on one side of the battery 16, the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9 electrically connected by the button 17 work, and the battery 16 provides power for the operation of the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9. It is only necessary to use a wire with a certain reserved margin to connect the battery 16, the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9, so that the first telescopic pneumatic cylinder 6, the second telescopic pneumatic cylinder 9 and the battery 16 can be electrically connected together.
[0028] When the two connecting sleeves 1 are sleeved on the outside of the water diversion pipe 18, the connecting sleeve 1 installed on the top sealing box 3 is controlled to be located at the top. At this time, the first telescopic pneumatic cylinder 6 fixed inside the top sealing box 3 works to push the upper sealing plate 7 downward. At this time, the second telescopic pneumatic cylinder 9 is located at the bottom of the lower sealing plate 8, and the working second telescopic pneumatic cylinder 9 pushes the lower sealing plate 8 upward, and the upward lower sealing plate 8 and the downward upper sealing plate 7 are sleeved on the outside of the preparation pipe 19 at the same time. A pressure sensor 11 is arranged on the top of the second telescopic pneumatic cylinder 9 fixed inside the bottom sealing box 4, that is, the pressure sensor 11 is arranged on the top of the extension end of the second telescopic pneumatic cylinder 9 and contacts the second telescopic pneumatic cylinder 9, so the second telescopic pneumatic cylinder 9 extends and contacts the pressure sensor 11 to push the lower sealing plate 8 upward, and when the movement of the lower sealing plate 8 is blocked by the preparation pipe 19, the pressure value detected by the pressure sensor 11 increases.
[0029] When the pressure value detected by the pressure sensor 11 reaches a preset value, the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9 electrically connected to the pressure sensor 11 stop working. At this time, the upper sealing plate 7 and the lower sealing plate 8 are sleeved onto the outside of the preparation pipe 19, and the upper sealing plate 7, the lower sealing plate 8, the top sealing box 3 and the bottom sealing box 4 seal the outside of the preparation pipe 19 and the connecting sleeve 1. In addition, the friction between the upper sealing plate 7 and the lower sealing plate 8 and the preparation pipe 19 is relatively small. The upwardly moved preparation pipe 19 can rotate to drive the external threaded pipe 20 to leave the inside of the water diversion pipe 18. After the preparation pipe 19 is out of contact with the upper sealing plate 7 and the lower sealing plate 8, the pressure sensor 11 detects that the pressure value is reduced. At this time, the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9 work again, the upper sealing plate 7 moves down, and the lower sealing plate 8 moves up. After the recessed parts of the upper sealing plate 7 and the lower sealing plate 8 miss each other, the upper sealing plate 7 and the lower sealing plate 8 are moved up. Plate 7 and lower sealing plate 8 form a blocking plate, and upper sealing plate 7, lower sealing plate 8, top sealing box 3 and bottom sealing box 4 seal the two connecting sleeves 1. During this process, the preparation pipe 19 does not leave between the two connecting sleeves 1, and most of the water inside the upward water diversion pipe 18 is guided by the preparation pipe 19, avoiding the situation where water inside the water diversion pipe 18 sprays out after the preparation pipe 19 is disassembled, and quickly seals one end of the water diversion pipe 18, providing time for the staff to replace the preparation pipe 19, thereby reducing the waste of water resources.
[0030] Subsequently, the staff inserts the externally threaded tube 20 fixed at one end of the new preparation pipe 19 between the two connecting sleeves 1. When the externally threaded tube 20 is blocked by the lower sealing plate 8, the staff presses the button 17 for the second time to shrink the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9 to restore the original state. The first telescopic pneumatic cylinder 6 drives the upper sealing plate 7 to reset, and the bottom of the lower sealing plate 8 loses the support of the second telescopic pneumatic cylinder 9 and falls. Subsequently, the preparation pipe 19 is rotated to move toward the water diversion pipe 18, so that the externally threaded tube 20 is rotated and inserted into the water diversion pipe 18, and the preparation pipe 19 and the water diversion pipe 18 are fixed together. In this process, the gap between the preparation pipe 19 and the two connecting sleeves 1 is small, and the water flow sprayed to the outside of the connecting sleeve 1 is small, which will not affect the staff. After the staff aligns the preparation pipe 19 with the water diversion pipe 18, the preparation pipe 19 moves toward the water diversion pipe 18 under the guidance of the two connecting sleeves 1. The water sprayed from the water diversion pipe 18 will not affect the installation of the preparation pipe 19, thereby increasing the speed of installation and fixation of the preparation pipe 19 and the water diversion pipe 18 and reducing the time investment.
[0031] A groove 10 is provided on the outer side of the lower sealing plate 8, and a pressure sensor 11 is arranged inside the groove 10 and fixedly connected to the lower sealing plate 8 to ensure the flatness of the bottom of the lower sealing plate 8 so that the lower sealing plate 8 can move downward stably under the influence of gravity.
[0032] An elastic member 15 is fixedly connected between the two connecting sleeves 1. The elastic member 15 that can be elastically deformed will not affect the connection sleeve 1 being installed on the outside of the water diversion pipe 18, and prevents the two connecting sleeves 1 from being completely separated. A handle 5 is fixedly connected to one side of the top sealing box 3 and the bottom sealing box 4. The top sealing box 3 and the bottom sealing box 4 are both fixedly connected to the adjacent connecting sleeves 1. The handle 5 provides a fulcrum for the staff to operate the connecting sleeve 1, thereby improving the convenience of operating the connecting sleeve 1.
[0033] If hot-melt material is needed to repair the external cracks of the prepared pipe 19, place the hot-melt material on the outside of the prepared pipe 19, then put the two connecting sleeves 1 on the outside of the prepared pipe 19, and control the positions of the top sealing box 3 and the bottom sealing box 4 so that the upper sealing plate 7 and the lower sealing plate 8 are aligned with the hot-melt material. Then, press the control button on one side of the battery 16 to make the first telescopic pneumatic cylinder 6 and the second telescopic pneumatic cylinder 9 work to push the upper sealing plate 7 and the lower sealing plate 8 toward the hot-melt material. At the same time, the working upper sealing plate 7 and the lower sealing plate 8 generate heat to make the hot-melt material stick to the prepared pipe 19. After rotating the two connecting sleeves 1, perform the above work again to complete the repair of the prepared pipe 19.
[0034] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A quick-connect device for municipal pipeline maintenance, comprising a pipeline structure, characterized in that: Two connecting sleeves (1) are arranged on the outside of the pipeline structure, and a rubber pad (2) is fixedly connected to one side of the inside of the two connecting sleeves (1). The two connecting sleeves (1) are provided with a movement groove (12). An upper sealing plate (7) is arranged at the top of the inner cavity of the movement groove (12). A top sealing box (3) is arranged on the outside of the upper sealing plate (7). A first telescopic pneumatic cylinder (6) is arranged inside the top sealing box (3). A lower sealing plate (8) is arranged at the bottom of the inner cavity of the movement groove (12). A pressure sensor (11) is arranged at the bottom of the lower sealing plate (8). A bottom sealing box (4) is sleeved on the outside of the lower sealing plate (8), and a second telescopic pneumatic cylinder (9) is arranged inside the bottom sealing box (4).
2. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: The pipeline structure comprises a water diversion pipeline (18), wherein the water diversion pipeline (18) is internally threadedly connected to an externally threaded pipe (20), and a reserve pipeline (19) is fixedly sleeved on the outside of the externally threaded pipe (20).
3. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: A plurality of threaded holes (13) are provided on the outside of the two connecting sleeves (1), and a fixing bolt (14) is provided on the top of one of the threaded holes (13).
4. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: An elastic member (15) is fixedly connected between the two connecting sleeves (1), a handle (5) is fixedly connected to one side of the top sealing box (3) and the bottom sealing box (4), and the top sealing box (3) and the bottom sealing box (4) are fixedly connected to the adjacent connecting sleeves (1).
5. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: The extending end of the first telescopic pneumatic cylinder (6) is fixedly connected to the upper sealing plate (7), and the first telescopic pneumatic cylinder (6) is fixedly installed inside the top sealing box (3).
6. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: The second telescopic pneumatic cylinder (9) is fixedly installed inside the bottom sealing box (4), the pressure sensor (11) is arranged at the extended end of the second telescopic pneumatic cylinder (9), a groove (10) is opened on the outer side of the lower sealing plate (8), and the pressure sensor (11) is arranged inside the groove (10) and is fixedly connected to the lower sealing plate (8).
7. A quick connection device for municipal pipeline maintenance according to claim 1, characterized in that: A storage battery (16) is fixedly connected to one side of the bottom sealing box (4), and a button (17) is installed on one side of the storage battery (16).
Citation Information
Patent Citations
Quick connecting device for municipal pipeline maintenance
CN214467032U