Tool for rapidly laying concrete curing film

By using tools of arc-shaped traction frames and rope pulling systems, the problem of difficulty in laying curing films within the center of larger concrete laying areas is solved, and the rapid and convenient laying of curing films on large concrete surfaces is achieved, and the laying efficiency and quality are improved.

CN222771915UActive Publication Date: 2025-04-18CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421294669.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2025-04-18
Estimated Expiration
2034-06-07

AI Technical Summary

Technical Problem

It is difficult for the prior art to effectively lay the curing film within the center of a larger concrete laying area, resulting in the inability to fully cover the concrete surface and prone to dryness and cracks, affecting the quality of the concrete.

Method used

A tool including an arc-shaped pulling frame, inserting rod, elastic member and draw rope is adopted. By opening both ends of the pulling frame, inserting the inserting rod into the port of the curing film roll, pulling the pulling frame with the draw rope, pulling the curing film roll rolling on the concrete surface for laying, and expanding the laying range by adjusting the draw rope length or connecting the draw rope.

Benefits of technology

It realizes the rapid and convenient laying of curing films on larger concrete surfaces, expands the operating range, avoids secondary surface collection and station adjustments caused by workers' trampling, and improves the convenience and efficiency of laying of curing films on large concrete surfaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222771915U_ABST
    Figure CN222771915U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete curing, in particular to a tool for quickly laying a concrete curing film, which comprises an arc-shaped traction frame, a pull rope is bound at the bending part of the traction frame, insertion rods are arranged at the two ends of the traction frame, the suspension ends of the two insertion rods are oppositely arranged, and an elastic piece is jointly pulled between the two ends of the traction frame. For a large concrete floor, the maintenance film roller can be placed on one side of the concrete floor by adjusting the length of the binding pull rope or continuously connecting the pull rope, and a worker stands on the other side to pull the maintenance film roller. In this way, the operation range of curing film laying can be greatly expanded, and the convenience of large concrete ground curing film laying is greatly improved. In the traction process, the two end openings of the traction frame have the buckling tendency through the elastic pieces, so that the insertion rods are stably inserted into the two ends of the curing film winding drum, and then the curing film winding drum is prevented from falling off in the traction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of concrete curing, and in particular to a tool for rapid laying of concrete curing membranes. Background Art

[0002] Concrete construction is an indispensable process in current infrastructure construction, and concrete maintenance is a key point that affects the quality control of the main concrete project. Film maintenance is a maintenance method that covers concrete structures or components. After the initial setting of concrete and before the final setting, the concrete maintenance film is manually laid to make the concrete maintenance film and the concrete surface closely combined, promote the hydration effect of concrete, and play a significant role in preventing cracks and moisturizing during the concrete maintenance process.

[0003] For large concrete floors, due to the large net depth of the main building, it is impossible to ensure that the film can be covered smoothly. In addition, the newly laid concrete floor has not yet solidified, and the marks left by people walking on the finished concrete will affect the appearance of the concrete surface. The workers in the middle cannot get close, making it difficult to lay the maintenance film in this area. If the concrete surface cannot be fully covered, the concrete surface will crack due to inadequate maintenance, affecting the quality of the concrete.

[0004] In the patent document with the announcement number CN 216076419 U, a concrete curing film covering tool is disclosed, including a push rod, a surface collecting drag plate for smoothing the concrete surface is provided at the lower end of the push rod, a film covering roller for winding the ground film is provided behind the surface collecting drag plate, a rolling tube is passed through the film covering roller, a traction frame for connecting the rolling tube and the push rod is provided between the rolling tube and the push rod, and a fixed frame is provided on the push rod along its length direction, and the upper end of the traction frame is passed through and hung in the fixed frame and can move and rotate back and forth in the fixed frame. When in use, the worker pulls the push rod and uses the rolling of the film covering roller to cover the curing film on the concrete surface. Although this method saves some effort for the workers in film covering and makes film covering faster, there is still a problem: for larger concrete paving areas, the central range is still inaccessible.

[0005] To this end, the present application provides a tool for rapid laying of concrete curing membrane to increase the coverage of the membrane. Utility Model Content

[0006] The purpose of the present application is to solve the problems existing in the prior art and to propose a tool for rapid laying of concrete curing membrane.

[0007] In order to achieve the above purpose, this application adopts the following technical solutions:

[0008] A tool for rapid laying of concrete curing membrane comprises an arc-shaped traction frame, a pulling rope is bound to the bent portion of the traction frame, plug rods are arranged at both ends of the traction frame, the suspended ends of the two plug rods are arranged oppositely, and an elastic member is pulled between the two ends of the traction frame.

[0009] Preferably, it also includes two shaft sleeves and a pressure roller, and the side walls of the shaft sleeves are fixed with mounting rods.

[0010] Preferably, the inner sides of both ends of the traction frame are provided with hanging ears, the two hanging ears are buckled with rings, and the elastic member is arranged between the two rings.

[0011] Preferably, the elastic member is any one of an elastic rope and a spring.

[0012] Preferably, a fixing sleeve is provided at the center of the bent portion of the traction frame, a hook is screwed onto a thread on the side wall of the fixing sleeve, and the pull rope is tied to the hook.

[0013] Preferably, the fixing sleeve is a C-shaped open sleeve.

[0014] Preferably, both side walls of the opening of the fixing sleeve are provided with extension platforms, and the two extension platforms are locked by fasteners.

[0015] Preferably, a U-shaped inserting rack is provided on the side wall of the fixing sleeve, and the hook can be detached from the inserting rack.

[0016] Compared with the prior art, the present application provides a tool for rapid laying of concrete curing membrane, which has the following beneficial effects:

[0017] 1. When in use, open both ends of the traction frame so that the rods on both sides are respectively inserted into the two ports of the curing film roll. By pulling the traction frame with a pull rope, the curing film roll can be pulled to roll on the concrete surface, thereby laying the curing film. The curing film roll can be inserted and removed by stretching the traction frame, which is easy to operate. For larger concrete floors, by adjusting the length of the binding rope or connecting the rope, the operating range of the curing film laying can be greatly expanded, greatly improving the convenience of laying the curing film on large concrete floors. In this way, not only is it avoided that the workers step on it and cause unnecessary secondary finishing, which leads to increased construction costs, but it also reduces the workers' own position adjustments, and the coverage is in place with one pull.

[0018] 2. An elastic member is provided between the two ends of the traction frame. During the pulling process, the elastic member makes the two ends of the traction frame tend to buckle, so that the insertion rod is firmly inserted into the two ends of the curing film roll, thereby preventing the curing film roll from falling off during the pulling process.

[0019] 3. The application has a simple structure, is easy to make, and is small and flexible.

[0020] Other advantages, objectives and features of the present application will be described in the following description to some extent; and will be apparent to those skilled in the art based on the following examination and study to some extent; or, may be taught from the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a three-dimensional schematic diagram of this application.

[0022] Figure 2 For this application Figure 1 Local schematic diagram of point A.

[0023] Figure 3 For this application Figure 1 Partial schematic diagram of point B.

[0024] Figure 4 Schematic diagram of two installation positions of the pressure roller of this application.

[0025] Figure 5 It is a three-dimensional schematic diagram of removing the curing film roll of the present application.

[0026] Figure 6 For this application Figure 5 Partial schematic diagram at point C.

[0027] In the figure: 1, traction frame; 2, insertion rod; 3, elastic member; 4, hanging ear; 5, collar; 6, shaft sleeve; 7, mounting rod; 8, pressure roller; 9, fixing sleeve; 10, insertion frame; 11, hook; 12, curing film reel. DETAILED DESCRIPTION

[0028] The following will be combined with the attached examples of the present application Figure 1-6 , the technical solutions in the embodiments of the present application are described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments.

[0029] In order to solve the problems existing in the prior art, the present embodiment provides a tool for quickly laying concrete curing membrane, including an arc-shaped traction frame 1, a pull rope is tied to the bent portion of the traction frame 1, and insertion rods 2 are provided at both ends of the traction frame 1. The suspended ends of the two insertion rods 2 are arranged opposite to each other, and an elastic member 3 is pulled between the two ends of the traction frame 1.

[0030] Principle details of this embodiment:

[0031] A tool for rapid laying of concrete curing membranes, comprising an arc-shaped traction frame 1, which can be C-shaped or V-shaped, and is made of a tough material, such as round steel metal (diameter not exceeding 10 mm) such as stainless steel bars, aluminum bars, or tough plastic. A pull rope is tied to the bent portion of the traction frame 1, and the two ends of the traction frame 1 are horizontally bent to form two insertion rods 2, the suspension ends of the two insertion rods 2 are arranged oppositely and the axes coincide, and the two ends of the traction frame 1 near the insertion rods 2 are jointly pulled with elastic members 3.

[0032] When in use, open the two ends of the traction frame 1 so that the insertion rods 2 on both sides are respectively inserted into the two ends of the curing film reel 12. Place the curing film reel 12 on the concrete surface, and pull the traction frame 1 by pulling the rope to pull the curing film reel 12 to roll on the concrete surface, so as to lay the curing film. For larger concrete floors, by adjusting the length of the binding rope, or connecting the rope, the curing film drum can be placed on one side of the concrete floor, and the worker stands on the other side to pull. In this way, the operating range of curing film laying can be greatly expanded, and the convenience of curing film laying on large concrete floors is greatly improved. In this way, not only is it avoided that the workers step on it and cause unnecessary secondary surface collection, which leads to increased construction costs, but it also reduces the workers' own position adjustment, and the coverage is in place with one pull. The curing film reel 12 can be inserted and removed by stretching the traction frame 1, which is easy to operate. And during the pulling process, the two ends of the traction frame 1 tend to be buckled through the elastic member 3, so that the insertion rod 2 is firmly inserted into the two ends of the curing film reel 12, thereby preventing the curing film reel 12 from falling off during the pulling process.

[0033] In this embodiment, the traction frame 1 can be made by processing through equipment or by workers randomly selecting materials from waste gas materials, which is very convenient. It has a simple structure, is easy to make, is compact and flexible, and can be made locally and processed at any time. When using the equipment in this solution, operators can effectively control the paving area of ​​the film, and the appearance quality of the concrete can also be improved, greatly improving the acceptance rate of concrete projects.

[0034] In the present application, the traction frame 1 has various sizes and can adapt to the application of curing film covering with different widths.

[0035] In a further embodiment of the present invention, two sleeves 6 and a pressure roller 8 are further included. The side walls of the sleeves 6 are fixed with mounting rods 7. Insertion holes are provided at both ends of the pressure roller 8. During installation, the two sleeves 6 are pressed against the two ends of the curing film reel 12 with their opposite sides, and against the bent connection between the traction frame 1 and the insertion rod 2 with their opposite sides, thereby limiting the sleeves 6 and preventing them from deflecting or shaking during the pulling process.

[0036] This embodiment has two usage states:

[0037] The first type: the pressure roller 8 is located in front of the curing film reel 12 in the direction of travel: the pressure roller 8 is plugged into the two plug rods 2, and the curing film reel 12 is plugged into the two mounting rods 7. During the pulling process, the pressure roller 8 will flatten the concrete floor within the curing film laying range to prevent the curing film from being scratched by punctures.

[0038] The second type: the pressure roller 8 is located at the rear side of the curing film reel 12 in the direction of travel: the pressure roller 8 is plugged into the two mounting rods 7, and the curing film reel 12 is plugged into the two plugging rods 2. During the pulling process, the pressure roller 8 will roll over the surface of the laid curing film, so that the curing film and the concrete are closely attached to prevent the loose attachment from being blown away by the wind and affecting the laying effect.

[0039] Preferably, two sets of shaft sleeves 6 and mounting rods 7, that is, two sets of pressure rollers 8, one each before and after the curing film reel 12, can be provided to achieve the above two effects.

[0040] In a further embodiment of the present invention, the inner sides of both ends of the traction frame 1 are provided with hanging ears 4, and the two hanging ears 4 are buckled with collars 5, and the elastic member 3 is arranged between the two collars 5. The elastic member 3 is detachable and easy to replace. In addition, before the traction frame 1 is stretched, the collar 5 on one side of the elastic member 3 is removed from the hanging ears 4, which can also reduce the stretching resistance.

[0041] In a further embodiment of this solution, the elastic member 3 is any one of an elastic rope and a spring, which can meet the tightening requirements and are also convenient to obtain.

[0042] In a further embodiment of the present invention, a fixing sleeve 9 is provided at the center of the bent portion of the traction frame 1, and a hook 11 is screwed on the side wall of the fixing sleeve 9, and the pull rope is tied to the hook 11. The hook 11 prevents the tied end of the pull rope from being offset during the pulling process, and also allows the pulling force to be located on the center line of the traction frame 1 to avoid pulling deviation. Moreover, the hook 11 is spirally installed on the traction frame 1, and can be removed and replaced after being deformed due to long-term pulling use.

[0043] In a further embodiment of the present invention, the fixing sleeve 9 is a C-shaped open sleeve. The fixing sleeve 9 has a certain toughness and can be opened and stretched to be removed, which is convenient and quick.

[0044] In a further embodiment of the present invention, the two side walls of the opening of the fixing sleeve 9 are provided with extension platforms, and the two extension platforms are provided with through holes, and bolts are inserted into the two through holes, and nuts are installed on the bolts to abut against the bottom wall of the lower extension platform. The fixing sleeve 9 is more firmly installed by the bolt and nut connection to avoid the phenomenon of active deviation.

[0045] In a further embodiment of the present solution, a U-shaped inserting bracket 10 is provided on the side wall of the fixing sleeve 9, a threaded hole is provided in the center of the inserting bracket 10, and a thread is provided at the bottom end of the hook 11, so that the hook 11 can be detachably installed on the inserting bracket 10. The inserting bracket 10 is arranged opposite to the opening of the fixing sleeve 9, and does not affect the expansion of the opening of the fixing sleeve 9. The arrangement of the inserting bracket 10 also increases the installation size of the hook 11, and the installation stability of the hook 11 can be improved by screwing a nut at the bottom end of the hook 11 on the lower side of the inserting bracket 10.

[0046] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and application concept of the present application, which should be covered by the protection scope of the present application.

[0047] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0048] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A tool for rapid laying of concrete curing membrane, characterized in that: It comprises an arc-shaped traction frame (1), a pulling rope is tied to the bent portion of the traction frame (1), plug rods (2) are provided at both ends of the traction frame (1), the suspended ends of the two plug rods (2) are arranged opposite to each other, and an elastic member (3) is pulled between the two ends of the traction frame (1); It also includes two shaft sleeves (6) and a pressure roller (8), and the side walls of the shaft sleeves (6) are fixed with mounting rods (7); The inner sides of both ends of the traction frame (1) are provided with hanging ears (4), and the two hanging ears (4) are both buckled with a sleeve ring (5), and the elastic member (3) is arranged between the two sleeve rings (5).

2. A tool for rapid laying of concrete curing membrane according to claim 1, characterized in that: The elastic member (3) is any one of an elastic rope and a spring.

3. A tool for rapid laying of concrete curing membrane according to claim 1, characterized in that: The center sleeve of the bent portion of the traction frame (1) is provided with a fixing sleeve (9), a hook (11) is screwed onto a thread on the side wall of the fixing sleeve (9), and a pull rope is tied to the hook (11).

4. A tool for rapid laying of concrete curing membrane according to claim 3, characterized in that: The fixing sleeve (9) is a C-shaped open sleeve.

5. A tool for rapid laying of concrete curing membrane according to claim 4, characterized in that: Both side walls of the opening of the fixing sleeve (9) are provided with extension platforms, and the two extension platforms are locked by fasteners.

6. A tool for rapid laying of concrete curing membrane according to claim 3, characterized in that: A U-shaped inserting frame (10) is provided on the side wall of the fixing sleeve (9), and the hook (11) can be detachably mounted on the inserting frame (10).

Citation Information

Patent Citations

  • Concrete curing film covering tool

    CN216076419U