Permeable pavement structure transformed from broken old road

By renovating the permeable pavement structure on the old pavement and using Z-shaped pavement bricks and drainage structures, the problem of poor permeability of cement pavement during heavy rainfall is solved, effectively draining rainwater, and reducing the risk of urban flooding.

CN222781898UActive Publication Date: 2025-04-22BEIJING ZHONGJIAN ENG MONITORING DEPT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421414672.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2025-04-22
Estimated Expiration
2034-06-20

Smart Images

  • Figure CN222781898U_ABST
    Figure CN222781898U_ABST
Patent Text Reader

Abstract

The utility model discloses a permeable pavement structure transformed by crushing old roads, which belongs to the technical field of road construction and comprises a plurality of pavement brick bodies, each pavement brick body comprises an upper brick body and a lower brick body to form a Z-shaped structure, the top of each upper brick body is provided with a plurality of base planes and first drain holes arranged among the base planes, and the top of each lower brick body is provided with a plurality of second drain holes arranged among the base planes. A flowing water slope is arranged between every two adjacent base surfaces, a limiting groove is formed in the top of the side, close to the lower brick body, of the upper brick body, a mounting block is arranged at the top of the side, away from the lower brick body, of the upper brick body, a plurality of clamping grooves are formed in the top of the lower brick body, and second drainage holes are formed in the clamping grooves; a plurality of protruding blocks matched with the clamping grooves are arranged at the bottom of the upper brick body. According to the permeable pavement structure transformed from the broken old road, water on the pavement can be drained in time, the phenomenon of water accumulation on the pavement is reduced, and therefore the possibility of waterlogging in cities is reduced, and the permeable pavement structure is environmentally friendly and convenient to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a permeable pavement structure for reconstructing an old road through crushing. Background Art

[0002] Many cities have chosen cement concrete pavement as their road material, mainly because its cost conforms to the principle of economy and can reduce the cost of road construction. However, in use, affected by traffic load, many cement pavements have problems such as potholes, peeling, cracks and misaligned boards. As the service time is extended, the damaged area is also continuously increasing, and the highway system has formed hidden dangers. Therefore, it is necessary to renovate the existing cement pavement. Pavement crushing technology is used in pavement reconstruction projects, especially for cement pavements. Due to the easy maintenance of asphalt pavements, more and more cement pavements that have reached the overhaul period are gradually being transformed into asphalt pavements. However, according to the material characteristics of asphalt pavement, its waterproof performance is better, so when encountering heavy rainfall, rainwater falls on the road surface, which is not easy to penetrate, and the road surface is prone to large-scale water accumulation, which leads to urban waterlogging. Utility Model Content

[0003] The utility model aims to provide a permeable pavement structure for reconstructing an old road by crushing it, so as to solve the problem of poor water permeability of the existing pavement in the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides a permeable pavement structure for the reconstruction of an old road after being broken, comprising a plurality of pavement brick bodies, wherein the pavement brick bodies comprise an upper brick body and a lower brick body, forming a Z-shaped structure, the top of the upper brick body is provided with a plurality of base surfaces and a first drainage hole arranged between the base surfaces, a water flow slope is arranged between adjacent base surfaces, a limiting groove is arranged on the top of one side of the upper brick body close to the lower brick body, a mounting block is arranged on the top of the side of the upper brick body away from the lower brick body, a plurality of card grooves are arranged on the top of the lower brick body, a second drainage hole is arranged inside the card grooves, and a plurality of protrusions matching the card grooves are arranged on the bottom of the upper brick body.

[0005] Preferably, the first drainage hole and the second drainage hole are respectively communicated with drainage grooves arranged on the inner sides of the bottoms of the upper brick body and the lower brick body.

[0006] Preferably, a groove is formed on the top of the mounting block, and limiting holes are provided on the groove and the limiting groove, and limiting columns are inserted into the limiting holes.

[0007] Preferably, the limiting column includes a column head and a column body arranged at the bottom of the column head, the diameter of the column head is the same as the diameter of the groove, the diameter of the column body is consistent with the diameter of the limiting hole, and the diameter of the column head is larger than the diameter of the column body.

[0008] Preferably, the water flow slope includes a slope peak arranged between adjacent base surfaces and a slope body arranged on both sides of the slope peak, and the slope valley of the slope body is connected to the top of the first drainage hole.

[0009] Preferably, the limiting hole on the limiting groove is communicated with the drainage groove.

[0010] Therefore, the utility model adopts an old road crushing and transformation permeable pavement structure of the above structure, and reduces the possibility of road water accumulation by setting up a plurality of pavement bricks and drainage structures. The connections set between adjacent pavement bricks assemble the plurality of pavement bricks together to prevent the pavement bricks from flipping or moving, thereby avoiding the possibility of internal accumulated water splashing out when pedestrians step on them.

[0011] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of an embodiment of the utility model of an old road crushing and reforming permeable pavement structure;

[0013] Figure 2 It is a side view of an embodiment of the utility model of an old road crushing and reforming permeable pavement structure;

[0014] Figure 3 A schematic diagram of a water flow slope between base surfaces of an embodiment of the utility model;

[0015] Figure 4 A schematic diagram of a limit column in an embodiment of the utility model;

[0016] Reference numerals

[0017] 1. Pavement brick body; 101. Upper brick body; 102. Lower brick body; 2. Base surface; 3. First drainage hole; 4. Water flow slope; 401. Slope peak; 402. Slope body; 5. Limiting groove; 6. Mounting block; 7. Slot; 8. Second drainage hole; 9. Protrusion; 10. Drainage groove; 11. Groove; 12. Limiting hole; 13. Limiting column; 131. Column head; 132. Column body. DETAILED DESCRIPTION

[0018] The technical solution of the utility model is further described below through the accompanying drawings and embodiments.

[0019] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0020] Example

[0021] The technical solutions in the embodiments of the present utility model will be described clearly and completely below in conjunction with the accompanying drawings.

[0022] like Figure 1-4 As shown, a permeable pavement structure for reconstructing an old road from broken bricks comprises a plurality of pavement brick bodies 1, wherein the pavement brick body 1 comprises an upper brick body 101 and a lower brick body 102, forming a Z-shaped structure, which is convenient for assembly and more stable after assembly. A plurality of base surfaces 2 and a first drainage hole 3 arranged between the base surfaces 2 are arranged on the top of the upper brick body 101, and a water flow slope 4 is arranged between adjacent base surfaces 2. A limiting groove 5 is arranged on the top of one side of the upper brick body 101 close to the lower brick body 102, and a mounting block 6 is arranged on the top of the upper brick body 101 away from the lower brick body 102. A groove 11 is arranged on the top of the mounting block 6, and limiting holes 12 are arranged on the groove 11 and the limiting groove 5, and a limiting column 13 is inserted in the limiting hole 12. The limiting column 13 includes a column head 131 and a column body 132 arranged at the bottom of the column head 131. The diameter of the column head 131 is the same as the diameter of the groove 11, and the diameter of the column body 132 is consistent with the diameter of the limiting hole 12, and the diameter of the column head 131 is larger than the diameter of the column body 132. When the limiting column 13 is inserted to fix two adjacent pavement brick bodies 1, the flatness and beauty of the pavement brick bodies 1 are not affected. The limiting hole 12 on the limiting groove 5 is connected with the drainage groove 10. A plurality of card grooves 7 are opened on the top of the lower brick body 102, and a second drainage hole 8 is arranged inside the card groove 7. A plurality of protrusions 9 adapted to the card groove 7 are arranged at the bottom of the upper brick body 101. The first drainage hole 3 and the second drainage hole 8 are respectively connected with the drainage groove 10 arranged on the inner side of the bottom of the upper brick body 101 and the lower brick body 102.

[0023] The water flow slope 4 includes a slope peak 401 arranged between adjacent base surfaces 2 and a slope body 402 arranged on both sides of the slope peak 401. The interval between adjacent base surfaces 2 is set very small, which is sufficient to drain rainwater. If the interval is too large, it will easily cause pedestrians to feel that the road surface is uneven when stepping on it. The slope valley of the slope body 402 is connected to the top of the first drainage hole 3, and the four adjacent slope bodies 402 together form a funnel-like shape to facilitate the discharge of rainwater.

[0024] During specific use, several pavement brick bodies 1 are spliced ​​together to form a permeable pavement structure. During splicing, the upper brick body 101 is overlapped on the lower brick body 102, and the overlaps are in sequence. The mounting block 6 of the rear upper brick body 101 is installed in the limiting groove 5 of the previous upper brick body 101, and the protrusion 9 of the rear upper brick body 101 is inserted into the card groove 7 of the previous lower brick body 102, and then the limiting column 13 is inserted into the limiting hole 12, and the column head 131 is just stuck in the groove 11, and the top of the column head 131 is at the same horizontal plane as the top of the mounting block 6, which does not affect the overall flatness of the pavement brick body 1. After the splicing is completed, when it rains, rainwater flows along the water slope 4 to the first drainage hole 3, and finally is discharged through the drainage groove 10. Rainwater will inevitably flow into the splicing gap, and finally is discharged through the second drainage hole 8 through the drainage groove 10, reducing road surface water.

[0025] Therefore, the utility model adopts the above-mentioned structure to transform the old road into a permeable pavement structure, which can drain the water on the road surface in time, reduce the phenomenon of water accumulation on the road surface, thereby reducing the possibility of urban waterlogging, is green, environmentally friendly and easy to install.

[0026] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that they can still modify or replace the technical solution of the utility model with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the utility model.

Claims

1. An old road crushing and transformation permeable pavement structure, characterized by: The invention comprises a plurality of pavement brick bodies, wherein the pavement brick bodies comprise an upper brick body and a lower brick body, forming a Z-shaped structure; the top of the upper brick body is provided with a plurality of base surfaces and a first drainage hole arranged between the base surfaces, and a water flow slope is arranged between adjacent base surfaces; a limiting groove is arranged on the top of one side of the upper brick body close to the lower brick body, a mounting block is arranged on the top of the side of the upper brick body away from the lower brick body, a plurality of card slots are arranged on the top of the lower brick body, a second drainage hole is arranged inside the card slots, and a plurality of protrusions matching the card slots are arranged on the bottom of the upper brick body.

2. The old road crushing and reconstructing permeable pavement structure according to claim 1 is characterized by: The first drainage hole and the second drainage hole are respectively communicated with drainage grooves arranged on the inner sides of the bottoms of the upper brick body and the lower brick body.

3. The old road crushing and reconstructing permeable pavement structure according to claim 2 is characterized by: A groove is formed on the top of the mounting block, and limiting holes are formed on the groove and the limiting groove, and limiting columns are inserted into the limiting holes.

4. The old road crushing and reconstructing permeable pavement structure according to claim 3 is characterized by: The limiting column includes a column head and a column body arranged at the bottom of the column head, the diameter of the column head is the same as the diameter of the groove, the diameter of the column body is consistent with the diameter of the limiting hole, and the diameter of the column head is larger than the diameter of the column body.

5. The old road crushing and reconstructing permeable pavement structure according to claim 1 is characterized by: The water flow slope includes a slope peak arranged between adjacent base surfaces and a slope body arranged on both sides of the slope peak, and a slope valley of the slope body is connected to the top of the first drainage hole.

6. The old road crushing and reconstructing permeable pavement structure according to claim 3 is characterized by: The limiting hole on the limiting groove is communicated with the drainage groove.