Dry wall seam digging, grouting and pointing integrated device

By designing an integrated device for clear water wall joint digging, grouting and grouting, the problems of poor construction quality, low efficiency and waste of materials in the clear water wall joint grouting process are solved, and efficient and environmentally friendly construction results are achieved.

CN222782419UActive Publication Date: 2025-04-22CHINA RAILWAY ELECTRIFICATION BUREAU GROUP NO 2 ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421463651.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2025-04-22
Estimated Expiration
2034-06-25

AI Technical Summary

Technical Problem

The prior art has problems of poor construction quality, low efficiency and waste of materials in the grouting process of clean water walls, resulting in environmental pollution.

Method used

An integrated device for grouting and grouting in clean water wall is designed, including a slurry conveying pipe, a screw conveying rod, a grouting gun nozzle, a screw cutting piece and a movable grouting ball. Through the cooperation of the screw conveying rod and a hand drill, uniform injection of mortar and beautification of grouting are achieved.

Benefits of technology

It improves construction efficiency and quality, reduces material waste and environmental pollution, reduces construction costs, and is simple to operate and is suitable for non-professional jobs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222782419U_ABST
    Figure CN222782419U_ABST
Patent Text Reader

Abstract

The utility model provides a dry wall seam digging, grouting and pointing integrated device which comprises a slurry conveying pipe, a spiral conveying rod is coaxially arranged in the slurry conveying pipe, a spiral conveying plate is arranged on a rod body of the spiral conveying rod, an opening is formed in the upper portion of the slurry conveying pipe and connected with a slurry storage bin, and a vertical grip is fixedly connected to the lower portion of the slurry conveying pipe. A grouting gun nozzle is arranged at the front end of the grout conveying pipe, a bearing is arranged at the rear end of the grout conveying pipe to be connected with a spiral conveying rod, the spiral conveying rod is connected with the output end of the electric hand drill, and a slotting piece and a movable pointing ball are arranged on the left side and the right side of the grouting gun nozzle respectively. The end of the connecting part extends forwards to be sequentially provided with a discharging part and a cleaning part, a first cavity is formed in an opening in the side, away from the grouting gun nozzle, of the discharging part, discharging openings are formed in the upper side and the lower side of the first cavity, the front end of the cleaning part is closed, and a second cavity connected with the first cavity is formed in the cleaning part. And the construction cost can be greatly reduced while the construction efficiency and the construction quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of housing construction engineering, and specifically relates to an integrated device for hollowing, grouting and grouting of clear water walls. Background Art

[0002] In some high-speed rail projects, the four power houses and their attached walls are plain walls. The masonry quality of the plain walls will directly affect the overall effect of the house attachments. It was found during construction that the main reason for the poor quality of the plain walls is the overall grouting process in the later stage. The existing technology uses wire to dig out the joints and uses a grouting shovel and a trowel to cooperate with a support plate to fill the joints. Professional workers are required to carry out the grouting work. Not only is the construction quality of the plain walls poor and the construction efficiency is low, but there is also a problem of material waste. The waste of building materials such as cement and sand will also cause environmental pollution. Therefore, an integrated device for digging, grouting and grouting of plain walls is urgently needed to improve the overall construction quality of the walls, speed up the construction progress, and save construction costs. Utility Model Content

[0003] The utility model aims to provide an integrated device for hollowing, grouting and grouting of drywall to solve the above technical problems.

[0004] The utility model is implemented by the following technical solutions:

[0005] The invention discloses an integrated device for grouting and grouting of exposed concrete walls, comprising a grouting pipe, a spiral conveying rod coaxially arranged in the grouting pipe, a spiral conveying plate arranged on the rod body of the spiral conveying rod, an opening arranged on the top of the grouting pipe and connected to a slurry storage bin, a vertical grip fixedly connected to the bottom of the grouting pipe, a conical grouting gun nozzle for grouting arranged at the front end of the grouting pipe, a bearing arranged at the rear end of the grouting pipe and connected to the spiral conveying rod, the spiral conveying rod is connected to the output end of a hand drill, a grouting piece for grouting and cleaning of mortar joints and a movable grouting ball for grouting and beautifying mortar joints are respectively arranged on the left and right sides of the grouting gun nozzle, the grouting piece comprises a connecting part connected to the grouting gun nozzle, the end of the connecting part extends forward and is sequentially provided with a discharging part and a cleaning part, the discharging part is provided with a first cavity at an opening on a side away from the grouting gun nozzle, the upper and lower sides of the first cavity are provided with discharging openings, the front end of the cleaning part is closed, and a second cavity connected to the first cavity is arranged inside the cleaning part.

[0006] Furthermore, the cleaning portion has an arc-shaped side wall, and the arc-shaped side wall is tangentially connected to the upper and lower side walls of the discharge portion.

[0007] Furthermore, the rear of the movable grouting ball is fixedly connected to the fixed rod, the rear end of the fixed rod is movably connected to the grouting gun nozzle, a tension spring is connected between the rod body of the fixed rod and the grouting gun nozzle, and the tension spring constrains the movable grouting ball to fit tightly against the wall joint to perform grouting and closing work.

[0008] Furthermore, a mounting base is provided on the outside of the grouting gun nozzle, and the mounting base is composed of two parallel plates. The rear end of the fixing rod is pivotally connected to the mounting base, and the two ends of the tension spring are respectively embedded in the spring groove provided on one side of the grouting gun nozzle of the mounting base and the spring groove provided in the middle of the fixing rod.

[0009] Furthermore, the grouting gun nozzle is rotatably connected to the grouting pipe.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] The device is easy to operate and can use the existing electric hand drill to realize the grouting process. It has low requirements on the quality of personnel. The mortar joints are first cleaned by using the grooving parts, and then the mortar is injected into the mortar joints by using the grouting gun nozzle, and then the grouting is achieved by using the movable grouting ball. While improving the construction efficiency and construction quality, the construction cost can be greatly reduced. It has significant advantages in the construction of clear water walls and is worthy of further promotion and application in the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the structure of the utility model;

[0013] Figure 2 It is a cutaway schematic diagram of the utility model;

[0014] Figure 3 It is a front view of the utility model;

[0015] Figure 4 It is a top view of the utility model;

[0016] Figure 5 It is a structural schematic diagram of the grouting gun nozzle of the utility model.

[0017] In the figure: 1-slurry delivery pipe, 2-screw delivery rod, 3-slurry storage bin, 4-vertical handle, 5-grouting gun nozzle, 6-bearing, 7-hand electric drill, 8-grooving piece, 81-connecting part, 82-discharging part, 83-cleaning part, 9-movable jointing ball, 10-tension spring, 11-installation base. DETAILED DESCRIPTION

[0018] In order to better understand the purpose, structure and function of the utility model, the following is a further detailed description of an integrated device for hollowing, grouting and grouting of a dry wall of the utility model in conjunction with the accompanying drawings.

[0019] like Figure 1~Figure 5As shown, an integrated device for hollowing and grouting joints of a clear water wall comprises a grouting pipe 1, a spiral conveying rod 2 is coaxially arranged in the grouting pipe 1, a spiral conveying plate is arranged on the rod body of the spiral conveying rod 2, an opening is arranged above the grouting pipe 1 and connected to a grouting bin 3, a vertical grip 4 is fixedly connected below the grouting pipe 1, a conical grouting gun nozzle 5 for grouting is arranged at the front end of the grouting pipe 1, a bearing 6 is arranged at the rear end of the grouting pipe 1 to connect to the spiral conveying rod 2, the spiral conveying rod 2 is connected to the output end of a hand drill 7, and the grouting The left and right sides of the gun nozzle 5 are respectively provided with a grooving piece 8 for grooving and cleaning the mortar joints and a movable grouting ball 9 for grouting and beautifying the mortar joints. The grooving piece 8 includes a connecting part 81 connected to the grouting gun nozzle 5, and the end of the connecting part 81 extends forward and is successively provided with a discharge part 82 and a cleaning part 83. The discharge part 82 is provided with a first cavity at an opening on one side away from the grouting gun nozzle 5, and discharge ports are provided on the upper and lower sides of the first cavity. The front end of the cleaning part 83 is closed, and a second cavity connected to the first cavity is provided inside it.

[0020] The slurry storage bin 3 is used to store mortar materials and introduce them into the slurry delivery pipe 1. The hand drill 7 is connected to the spiral conveying rod 2 through the bearing 6 and is on the same central axis. The spiral conveying rod 2 plays the role of conveying mortar materials, stabilizing the device, and transmitting power. The bearing 6 plays the role of transmitting force and positioning, and ensures the stability of the device position during the rapid rotation of the hand drill 7. The hand drill 7, as a power component, also has a fixing function, so that the device can continue to work stably after the grouting operation begins. The vertical handle 4 is located in the lower center of the slurry storage bin 3. The vertical handle 4 provides support and plays the role of stabilizing the device. The grooving piece 8 can first clean up the excess mortar in the mortar joint to make the depth of the mortar joint uniform. The grouting gun nozzle 5 can evenly inject the mortar conveyed by the spiral conveying rod 2 into the mortar joint to complete the grouting construction. The movable grouting ball 9 plays the role of grouting and grouting to ensure the construction is beautiful and neat.

[0021] In this embodiment, the grouting gun nozzle 5 can be rotated, and the grouting and grouting construction of different vertical and horizontal joints can be carried out by rotating the grouting gun nozzle 5. The grouting member 8 arranged on the outside of the grouting gun nozzle 5 has a cleaning portion 83 that is 5 mm longer than the top of the grouting gun nozzle 5. The cleaning portion 83 has an arc-shaped side wall, and the arc-shaped side wall is tangentially connected to the upper and lower side walls of the discharge portion 82. The cleaning portion 83 is used to perform the grouting work, that is, to remove the excess mortar in the mortar joint to make the depth of the mortar joint uniform, and the excess mortar is introduced from the second cavity into the first cavity and discharged from the discharge port, thereby facilitating the grouting construction.

[0022] The movable grouting ball 9 arranged outside the grouting gun nozzle 5 is 10 mm longer than the top of the grouting gun nozzle 5, the rear of the movable grouting ball 9 is fixedly connected to the fixed rod, the rear end of the fixed rod is movably connected to the grouting gun nozzle 5, and a tension spring 10 is connected between the rod body of the fixed rod and the grouting gun nozzle 5 to provide a tensile force to constrain the movable grouting ball 9 to be close to the wall seam for grouting and grouting. Specifically, a mounting base 11 is arranged outside the grouting gun nozzle 5, the mounting base 11 is composed of two parallel plates, the rear end of the fixed rod is pivotally connected to the mounting base 11, and the two ends of the tension spring 10 are respectively embedded in the spring groove arranged on one side of the grouting gun nozzle 5 and the spring groove arranged in the middle of the fixed rod.

[0023] When in use, the rear end of the spiral conveying rod 2 is inserted into the hand drill 7. Before grouting, the device is checked to check whether each component is operating normally. After it is operating normally, the filling and grouting can be performed. Before grouting, pre-grouting should be performed to check whether the grouting amount is uniform. The formal grouting can be performed after the grouting amount is uniform. Before grouting and grouting, hold the vertical handle 4 by hand to make the grouting process as a whole stable and orderly. During the preparation work, the grouting gun nozzle 5 is brought about 5mm close to the wall seam so that the seam-cutting piece 8 is close to the mortar seam, and then the hand drill 7 is started to accelerate the rotation of the bearing 6 and the spiral conveying rod 2. When moving the device to work, the excess mortar in the mortar seam is first cleaned through the seam-cutting piece 8 in front of the moving direction of the grouting gun nozzle 5 to make the depth of the mortar seam uniform, so that the grouting gun nozzle 5 can inject the grouting mortar into the mortar seam. While the mortar is injected into the mortar seam of the wall, the device is moved smoothly along the mortar seam, and the movable grouting ball 9 behind the moving direction of the grouting gun nozzle 5 is used to perform the grouting and grouting closing work during the movement of the device.

[0024] The device has low processing and manufacturing costs, is easy to carry and fix, and is convenient and quick to construct. It has the characteristics of high one-time success rate and high construction efficiency, and can effectively avoid the problem of increased construction costs caused by rework. It also greatly reduces the demand for professional jobs. Workers only need simple training and guidance on site to be competent for this job, which greatly saves labor costs. The device can also avoid the increase in costs caused by material waste. The use of this device can directly reduce the use of mortar, which is of great significance in green construction such as environmental protection and energy conservation and emission reduction.

[0025] This device has achieved remarkable results in practical application. It avoids material waste, reduces the secondary rework rate to almost zero, saves labor costs, has high construction efficiency, and has good social, economic and environmental protection benefits. It provides reliable theoretical support and valuable construction experience for other similar wall constructions, and plays a positive role in reducing costs and increasing efficiency in the building construction industry.

[0026] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application belong to the scope protected by the present invention.

Claims

1. An integrated device for hollowing, grouting and grouting of drywall, characterized in that: The invention comprises a slurry delivery pipe (1), wherein a spiral delivery rod (2) is coaxially arranged in the slurry delivery pipe (1), a spiral delivery plate is arranged on the rod body of the spiral delivery rod (2), an opening is arranged on the top of the slurry delivery pipe (1) and connected to a slurry storage bin (3), a vertical grip (4) is fixedly connected to the bottom of the slurry delivery pipe (1), a conical grouting gun nozzle (5) for grouting is arranged on the front end of the slurry delivery pipe (1), a bearing (6) is arranged on the rear end of the slurry delivery pipe (1) and connected to the spiral delivery rod (2), the spiral delivery rod (2) is connected to the output end of a hand electric drill (7), and the left end of the grouting gun nozzle (5) is connected to the output end of the hand electric drill (7), and the left end of the grouting gun nozzle (5) is connected to the output end of the hand electric drill (7). The right sides are respectively provided with a grooving piece (8) for grooving and cleaning the mortar joints and a movable grouting ball (9) for grouting and beautifying the mortar joints. The grooving piece (8) comprises a connecting portion (81) connected to the grouting gun nozzle (5). The end of the connecting portion (81) extends forward and is provided with a discharge portion (82) and a cleaning portion (83) in sequence. The discharge portion (82) is provided with a first cavity at an opening on a side away from the grouting gun nozzle (5). The upper and lower sides of the first cavity are provided with discharge ports. The front end of the cleaning portion (83) is closed, and a second cavity connected to the first cavity is provided therein.

2. The integrated device for hollowing, grouting and grouting of drywall according to claim 1 is characterized in that: The cleaning portion (83) has an arc-shaped side wall, and the arc-shaped side wall is tangentially connected to the upper and lower side walls of the discharge portion (82).

3. The integrated device for hollowing, grouting and grouting of drywall according to claim 1 is characterized in that: The rear of the movable grouting ball (9) is fixedly connected to a fixed rod, the rear end of the fixed rod is movably connected to a grouting gun nozzle (5), a tension spring (10) is connected between the rod body of the fixed rod and the grouting gun nozzle (5), and the tension spring (10) constrains the movable grouting ball (9) to be close to the wall joint to perform grouting and closing work.

4. The integrated device for hollowing, grouting and grouting of drywall according to claim 3 is characterized in that: A mounting base (11) is arranged outside the grouting gun nozzle (5), and the mounting base (11) is composed of two parallel plates. The rear end of the fixing rod is pivotally connected to the mounting base (11), and the two ends of the tension spring (10) are respectively embedded in a spring groove arranged on one side of the grouting gun nozzle (5) of the mounting base (11) and a spring groove arranged in the middle of the fixing rod.

5. The integrated device for hollowing, grouting and grouting of drywall according to any one of claims 1 to 4, characterized in that: The grouting gun nozzle (5) is rotatably connected to the grouting pipe (1).