Electric building rock-entering all-in-one machine

By adding pneumatic sub-hole hammer devices to the power construction rotary drilling rig, the problem of low drilling efficiency of lightweight power construction rotary drilling rig during hard rock formation construction is solved, and efficient crushing of rocks and large-diameter pile construction is achieved, reducing construction costs.

CN222782599UActive Publication Date: 2025-04-22TYSIM PILING EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421707625.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2025-04-22
Estimated Expiration
2034-07-18

AI Technical Summary

Technical Problem

When the lightweight power construction rotary drilling rig is constructed, the drilling efficiency is low and the drilling teeth is severe, resulting in a significant increase in construction costs. Especially when the hard rock exceeds 60Mpa, the drilling efficiency is extremely low or even impossible to drill.

Method used

An integrated machine for building rocks was designed to add a pneumatic submersible hammer device to the power construction rotary drilling rig, and use the pneumatic submersible hammer impact to crush the rocks, and achieve large-diameter pile construction work through supporting construction methods.

Benefits of technology

It improves drilling efficiency, reduces drilling teeth losses, effectively improves construction efficiency, realizes multi-energy of one machine, and reduces customer construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222782599U_ABST
    Figure CN222782599U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cast-in-situ bored pile construction, in particular to an electric construction rock entering all-in-one machine which comprises an electric construction rotary drilling rig, a dust removal system is arranged on one side of the electric construction rotary drilling rig, a gas circuit steel pipe is fixedly installed on one side of the dust removal system, and a gas pipe is fixedly installed at one end of the gas circuit steel pipe. A pneumatic down-the-hole hammer device is additionally arranged on the basis of an electric construction rotary drilling rig, rock is impacted and crushed by utilizing an impact acting mode of the pneumatic down-the-hole hammer, the problem that the electric construction drilling rig cannot efficiently enter the rock for drilling due to factors such as light weight and small pressure is solved, and large-diameter piling construction operation is realized by setting a matched construction method. The matched pneumatic down-the-hole hammer device is seamlessly connected with the electric construction rotary drilling rig, rapid switching is achieved, switching between a down-the-hole hammer drilling tool and a rotary drilling method drilling tool is achieved by additionally arranging an adapter, convenience and rapidness are achieved, the drilling efficiency is greatly improved, the construction efficiency is effectively improved, multiple functions are achieved through one machine, and the construction cost of customers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bored pile construction, in particular to an electric construction rock-penetrating integrated machine. Background Art

[0002] At present, rotary drilling rigs are widely used in foundation drilling projects, and their construction efficiency and quality have been recognized. In the past two decades, rotary drilling rigs have become commonly used equipment for bored pile construction. Rotary drilling rigs can be used with various drilling tools to meet construction operations in different geological conditions, from soft soil layers to sandy soil layers, gravel layers, weathered rock layers, hard rocks, etc.

[0003] In recent years, rotary drilling rigs have gradually been widely used in power construction foundation construction. Since power construction has higher requirements for drilling rigs: light weight of the whole machine, overall transportation, etc., ordinary rotary drilling rigs cannot meet the construction requirements or even reach the construction site.

[0004] Based on the above, when lightweight electric power rotary drilling rigs encounter hard rock formations, the drilling efficiency is low and the drill teeth are seriously worn, resulting in a significant increase in construction costs. When the hard rock exceeds 60Mpa, the drilling efficiency is extremely low or even impossible to drill. Therefore, a device is needed that can efficiently solve the problem of electric power rotary drilling rigs entering the rock. Utility Model Content

[0005] The utility model aims to provide an all-in-one electric construction rock drilling machine, which has the characteristics of convenience, speed and improved drilling efficiency.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an electric construction rock drilling integrated machine, comprising an electric construction rotary drilling rig, a dust removal system is arranged on one side of the electric construction rotary drilling rig, a gas line steel pipe is fixedly installed on one side of the dust removal system, a gas pipe is fixedly installed on one end of the gas line steel pipe, a swivel joint is installed on the end of the gas pipe away from the gas line steel pipe, a drill rod is connected to the bottom of the swivel joint, and a down-the-hole hammer drill tool is installed on the lower end of the drill rod;

[0007] The lower end of the drill rod is connected and installed with a hexagonal to square joint, and the bottom of the hexagonal to square joint is connected and installed with a rotary drilling tool;

[0008] The dust removal system mainly includes a water pump, a water tank, related pipelines, and a throttle valve.

[0009] In order to remove dust, as a preferred embodiment of the utility model, the water pump is fixedly installed on the water tank, the water pump is connected to relevant pipelines, and the relevant pipelines are connected and installed with the throttle valve.

[0010] In order to remove dust, as a preferred embodiment of the utility model, the relevant pipelines are connected and installed with the gas pipeline steel pipe.

[0011] In order to switch the construction mode, as an electric construction rock-penetrating integrated machine of the utility model, the down-the-hole hammer drill and the rotary drilling drill are preferably connected and installed independently to the bottom of the drill rod, and the down-the-hole hammer drill and the rotary drilling drill are used independently.

[0012] For the convenience of adjustment, as a preferred embodiment of the utility model of an electric construction rock drilling rig, a frame is provided on the right side of the electric construction rotary drilling rig, and the frame is controlled to rotate by a hydraulic telescopic rod, and the air pipe is installed on one side of the frame.

[0013] In order to facilitate movement, as a preferred electric construction rock drilling rig of the utility model, the electric construction rotary drilling rig is provided with driving power through crawler wheels at the bottom.

[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0015] A pneumatic down-the-hole hammer device is added to the electric power construction rotary drilling rig, and the pneumatic down-the-hole hammer is used to impact and break the rock, solving the problem that the electric power construction drilling rig cannot drill into the rock efficiently due to factors such as light weight and low pressure. By setting up supporting construction methods, large-diameter pile construction operations can be achieved. The supporting pneumatic down-the-hole hammer device is seamlessly connected with the electric power construction rotary drilling rig to achieve fast switching. By adding a conversion joint, the switch between the down-the-hole hammer drill tool and the rotary drilling method drill tool can be achieved, which is convenient and fast, greatly improving the drilling efficiency, effectively improving the construction efficiency, achieving multi-functions in one machine, and reducing the customer's construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a diagram of the rock-penetrating integrated machine of the utility model;

[0017] Figure 2 This is a diagram of the utility model where the down-the-hole hammer method is switched to the rotary drilling method;

[0018] Figure 3 This is a diagram of the utility model's rotary drilling method switching to a down-the-hole hammer method;

[0019] Figure 4 A schematic diagram of an extension section is added to the utility model;

[0020] Figure 5 This is a schematic diagram of the construction of the utility model of down-the-hole hammer plum blossom pile;

[0021] Figure 6 It is a schematic diagram of graded drilling of the rotary drilling method of the utility model.

[0022] In the figure: 1. Electric Power Construction rotary drilling rig; 2. Dust removal system; 3. Gas pipeline steel pipe; 4. Gas pipe; 5. Rotary joint; 6. Drill rod; 7. Down-the-hole hammer drill tool; 8. Hexagonal to square joint; 9. Rotary drilling tool. DETAILED DESCRIPTION

[0023] See also Figures 1 to 6 An electric power construction rock drilling machine comprises an electric power construction rotary drilling rig 1, a dust removal system 2 is arranged on one side of the electric power construction rotary drilling rig 1, a gas line steel pipe 3 is fixedly installed on one side of the dust removal system 2, a gas pipe 4 is fixedly installed on one end of the gas line steel pipe 3, a rotary joint 5 is installed on the end of the gas pipe 4 away from the gas line steel pipe 3, a drill rod 6 is connected to the bottom of the rotary joint 5, and a down-the-hole hammer drill 7 is installed on the lower end of the drill rod 6;

[0024] The lower end of the drill rod 6 is connected and installed with a hexagonal to square joint 8, and the bottom of the hexagonal to square joint 8 is connected and installed with a rotary drilling tool 9;

[0025] The dust removal system 2 mainly includes a water pump, a water tank, related pipelines, and a throttle valve.

[0026] In this embodiment: the drill rod 6 of the electric construction rotary drilling rig 1 is replaced with a pneumatic down-the-hole hammer drill rod, so that the drill rod 6 can be used for two purposes, and an air duct is set in the middle to realize air transmission; the drill rod 6 can achieve greater drilling depth by adding an extension section, and the depth depends on the air volume of the matching air compressor and the maximum lifting force of the main winch. The dust removal system 2 mainly includes a water pump, a water tank, related pipelines, a throttle valve, and software control to realize water pump flow control, and adjust the water flow according to the size of the borehole diameter, etc. The water in the water tank is set according to a certain flow rate through the water pump, and the water is transported to the air duct pipeline, and finally transported to the bottom of the down-the-hole hammer. Through the action of compressed air, the water is discharged from the down-the-hole hammer exhaust duct in a water mist state and mixed with dust to achieve dust reduction.

[0027] Among them, an airway swivel joint is arranged on the top of the drill pipe 4, and the drill pipe 6 is connected to the swivel joint 5 through a hexagonal joint 8 and a side axial pin shaft to realize the torque transmission and lifting force transmission of the drill pipe 6. The swivel joint 5 is divided into an external non-rotating body and a rotating body with an airway arranged inside to realize airway transmission. An interface for connecting with the main winch wire rope is arranged on the top to realize the connection between the wire rope and the swivel joint 5.

[0028] As a technical optimization solution of the utility model, the water pump is fixedly installed with the water tank, the water pump is connected with the relevant pipelines, the relevant pipelines are connected and installed with the throttle valve; the relevant pipelines are connected and installed with the gas line steel pipe 3.

[0029] In this embodiment: the dust removal system 2 is provided to control the flow of the water pump, and the water is discharged from the exhaust air duct of the down-the-hole hammer in the form of water mist, and mixed with the dust to achieve dust reduction.

[0030] As a technical optimization solution of the utility model, the down-the-hole hammer drill 7 and the rotary drilling tool 9 are independently connected and installed to the bottom of the drill rod 6, and the down-the-hole hammer drill 7 and the rotary drilling tool 9 are used independently.

[0031] In the present embodiment: based on the electric power construction rotary drilling rig 1, a pneumatic down-the-hole hammer device is added, and the pneumatic down-the-hole hammer is used to impact and break the rock, so as to solve the problem that the electric power construction drilling rig cannot drill into the rock efficiently due to its light weight and small applied pressure. The matching pneumatic down-the-hole hammer device is seamlessly connected with the electric power construction rotary drilling rig 1 to achieve fast switching. By adding a conversion joint, the down-the-hole hammer drill tool 7 and the rotary drilling drill tool 9 can be switched, which is convenient and fast, and improves the construction efficiency.

[0032] As a technical optimization solution of the utility model, a frame is arranged on the right side of the electric power construction rotary drilling rig 1, and the frame is controlled to rotate by a hydraulic telescopic rod, and the air pipe 4 is installed on one side of the frame.

[0033] In this embodiment: the inclination angle of the air pipe 4 is controlled by the hydraulic telescopic rod, and the rotation of the air pipe 4 can be controlled so that the drill rod 6 installed on one side can be aligned with the ground for construction.

[0034] As a technical optimization solution of the utility model, the bottom of the electric power construction rotary drilling rig 1 is provided with driving power through crawler wheels.

[0035] In this embodiment: the movement of the crawler wheels can provide driving power for the driving movement of the electric power construction rotary drilling rig 1.

[0036] In order to solve the large diameter pile hole operation of electric power construction foundation, a construction method is proposed:

[0037] Plum blossom pile construction is carried out by matching pneumatic down-the-hole hammers, and reasonable matching is carried out according to the diameter of the pile hole and the diameter of the down-the-hole hammer head. Usually, in order to reduce the equipment's requirements for the air volume of the air compressor, the diameter of the down-the-hole hammer head is generally between 300-400mm; according to the different diameters of the pile holes, when switching to rotary drilling construction, the hole can be drilled in one go or a graded drilling method can be used to achieve large-diameter pile hole operations.

[0038] Among them, it is necessary to explain how to add the connection structure:

[0039] Add air duct pipeline on the side of the main engine of the electric construction drilling rig (preferably using hard steel pipe);

[0040] An air pipe (preferably a rubber hose) bracket is added to the side of the main engine mast body to realize the transition connection between the hard steel pipe and the air duct rubber hose in the bracket area and the air duct rubber hose from the bracket to the swivel joint 5 on the top of the drill pipe 6, so as to prevent the rubber hose from being too long and causing scratches and interference, etc. At the same time, a rubber hose bracket roller is arranged on the mast body to guide and protect the rubber hose;

[0041] The drill rod 6 is replaced with a hollow single-layer drill rod, and both ends of the drill rod 6 adopt hexagonal head interfaces;

[0042] The lifting device of the electric construction drilling rig is replaced with an airway swivel joint, which connects the main winch wire rope and the drill rod 6, and is connected to the airway hose to realize the compressed air to the hollow tube of the drill rod and then to the working part of the impactor;

[0043] Dust removal system 2: The water in the water tank is pumped to the airway hose and then transported to the bottom of the down-the-hole hammer along with the compressed air; the dust generated by the down-the-hole hammer is atomized by water to reduce dust pollution;

[0044] In order to cooperate with the down-the-hole hammer construction operation, in the down-the-hole hammer construction mode, the power head speed and pressure are optimized and adjusted according to construction requirements.

[0045] Working principle: During construction, the down-the-hole hammer drill 7 and the rotary drilling tool 9 are used in coordination with each other according to actual needs. First, an airway swivel joint is set on the top of the drill rod 4. The drill rod 6 is connected to the swivel joint 5 through a hexagonal joint 8 and a side axial pin shaft to realize the torque transmission and lifting force transmission of the drill rod 6. The swivel joint 5 is divided into an external non-rotating body and a rotating body with an airway set inside to realize airway transmission. An interface for connecting the main winch wire rope is set on the top to realize the connection between the wire rope and the swivel joint 5. The drill rod 6 of machine 1 is replaced with a pneumatic down-the-hole hammer drill. The drill rod 6 can be used for two purposes. An air duct is set in the middle to realize air transmission. The drill rod 6 can achieve greater drilling depth by adding an extension section. The construction depth depends on the air volume of the matching air compressor and the maximum lifting force of the main winch. The water in the water tank is set according to a certain flow rate through a water pump, and the water is transported to the air duct pipeline and finally to the bottom of the down-the-hole hammer drill 7. Through the action of compressed air, the water is discharged from the exhaust air duct of the down-the-hole hammer drill 7 in the form of water mist and mixed with dust to achieve dust reduction.

[0046] The standard parts used in the utility model can be purchased from the market, and special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of various parts adopt the conventional means such as mature rivets and welding in the prior art. Machinery, parts and equipment all adopt conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field. All electrical equipment in the utility model are powered by an external power supply.

[0047] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An all-in-one electric construction rock penetration machine, characterized in that: The invention comprises an electric power construction rotary drilling rig (1), wherein a dust removal system (2) is arranged on one side of the electric power construction rotary drilling rig (1), a gas line steel pipe (3) is fixedly installed on one side of the dust removal system (2), a gas pipe (4) is fixedly installed on one end of the gas line steel pipe (3), a swivel joint (5) is installed on the end of the gas pipe (4) away from the gas line steel pipe (3), a drill rod (6) is connected to the bottom of the swivel joint (5), and a down-the-hole hammer drill tool (7) is installed on the lower end of the drill rod (6); A hexagonal to square joint (8) is connected and installed at the lower end of the drill rod (6), and a rotary drilling tool (9) is connected and installed at the bottom of the hexagonal to square joint (8); The dust removal system (2) mainly comprises a water pump, a water tank, relevant pipelines, and a throttle valve.

2. The integrated electric construction and rock penetration machine according to claim 1, characterized in that: The water pump is fixedly installed on the water tank, the water pump is connected to relevant pipelines, and the relevant pipelines are connected and installed with the throttle valve.

3. The integrated electric construction and rock penetration machine according to claim 1, characterized in that: The related pipelines are connected and installed with the gas line steel pipe (3).

4. The integrated electric construction and rock penetration machine according to claim 1, characterized in that: The down-the-hole hammer drill (7) and the rotary drilling tool (9) are independently connected and installed to the bottom of the drill rod (6), and the down-the-hole hammer drill (7) and the rotary drilling tool (9) are used independently.

5. The integrated electric construction and rock penetration machine according to claim 1, characterized in that: A frame is arranged on the right side of the electric power construction rotary drilling rig (1), and the frame is controlled to rotate by a hydraulic telescopic rod, and the air pipe (4) is installed on one side of the frame.

6. The integrated electric construction and rock penetration machine according to claim 1, characterized in that: The bottom of the electric power construction rotary drilling rig (1) is provided with driving power through crawler wheels.