Concrete preparation device

By designing a mixing mechanism and cleaning mechanism in the concrete preparation device, using the centrifugal force of water and the coordination of cleaning plates, the problems of dry and uneven mixing of concrete in traditional devices are solved, and more efficient cleaning and stirring effects are achieved.

CN222792432UActive Publication Date: 2025-04-25HUNAN TIANZHU LIUJIAN CONCRETE CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421741553.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2025-04-25
Estimated Expiration
2034-07-23

AI Technical Summary

Technical Problem

The traditional concrete preparation device is not cleaned in time after use, which causes the concrete to dry in the device, affecting the life of the device and causing the stirred concrete to be not uniform enough.

Method used

A concrete preparation device is designed, equipped with a mixing mechanism and a cleaning mechanism. The agitating mechanism includes a first rotating shaft, a support plate, a first gear, a motor, a second gear and a first stirring plate, and the cleaning mechanism includes a water inlet pipe, a cleaning plate and a second water outlet. By combining the centrifugal force of the water and the cleaning plate, the cleaning of the inner cavity of the preparation box is realized.

Benefits of technology

Effectively prevent concrete from drying in the device, extend the device life, and ensure the quality and uniformity of concrete preparation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222792432U_ABST
    Figure CN222792432U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete preparation. The concrete preparation device comprises a preparation box, a feeding port is formed in the upper end face of the preparation box, the lower end face of the preparation box is communicated with a discharging pipe, the preparation box is rotationally connected with a stirring mechanism, and the stirring mechanism comprises a first rotating shaft and a supporting plate; the outer wall of the first rotating shaft is rotationally connected with the upper end face of the preparation box, the supporting plate is communicated with the first rotating shaft, and an inner cavity of the first rotating shaft is rotationally connected with a cleaning mechanism. The stirring mechanism rotates to drive the cleaning plate to rotate to be matched with water discharged from the second water outlet to clean the inner cavity of the preparation box, concrete is prevented from being dried and hardened in the inner cavity of the concrete, the dried and hardened concrete is prevented from influencing the service life of the concrete preparation device, and meanwhile the concrete preparation quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete preparation, in particular to a concrete preparation device. Background Art

[0002] A concrete preparation device is a device for making concrete. The concrete preparation device can mix cement, aggregate, water and admixtures into concrete in a certain proportion. With the continuous development of the construction industry, the demand for concrete has increased, and the concrete preparation device has been further developed.

[0003] After traditional concrete preparation devices evenly mix the raw materials into concrete, the concrete needs to be poured out for use. Since concrete has a certain viscosity, a portion of the concrete in the preparation device will remain in the preparation device. If the preparation device is not cleaned in time after pouring out the concrete, the concrete will dry on the inner wall of the preparation device, which will affect the life of the concrete preparation device over time and also cause the problem of uneven mixing of the concrete. Utility Model Content

[0004] The utility model aims at the deficiencies of the prior art and provides the following technical solutions:

[0005] A concrete preparation device comprises a preparation box, wherein the upper end surface of the preparation box is provided with a feed inlet, and the lower end surface of the preparation box is connected to a discharge pipe, and the preparation box is rotatably connected to a stirring mechanism;

[0006] The stirring mechanism comprises a first rotating shaft and a supporting plate, wherein the outer wall of the first rotating shaft is rotatably connected to the upper end surface of the preparation box, the supporting plate is connected to the first rotating shaft, and the inner cavity of the first rotating shaft is rotatably connected to a cleaning mechanism;

[0007] The cleaning mechanism comprises a water inlet pipe, a cleaning plate and a second water outlet, the water inlet pipe is rotatably connected to the inner cavity of the first rotating shaft, the upper end of the cleaning plate is fixedly connected to the lower end surface of the support plate, and the side of the cleaning plate away from each other overlaps the inner cavity of the preparation box, and the second water outlet is opened at the end of the support plate away from each other.

[0008] As an improvement of the above technical solution, the stirring mechanism includes a first gear, a motor, a second gear and a first stirring plate, the first gear is fixedly connected to the upper end of the outer wall of the first rotating shaft, the lower end of the motor is fixedly connected to the upper end surface of the preparation box, the second gear is fixedly connected to the output end of the motor, and one side of the second gear is meshed with one side of the first gear, and the first stirring plate is fixedly connected to the outer wall of the first rotating shaft.

[0009] As an improvement of the above technical solution, the stirring mechanism includes a second rotating shaft, a second stirring plate and a third gear, the outer wall of the second rotating shaft is rotatably connected to the support plate, the second stirring plate is fixedly connected to the second rotating shaft, the lower end surface of the third gear is fixedly connected to the upper end of the second rotating shaft, and one side of the third gear is meshingly connected to the inner cavity of the preparation box.

[0010] As an improvement of the above technical solution, the cleaning mechanism includes a first water outlet, and the first water outlet is opened on the outer wall of the upper end of the first rotating shaft.

[0011] As an improvement of the above technical solution, a water channel for cleaning the inner cavity of the preparation box is opened inside the support plate.

[0012] Beneficial effects of the utility model:

[0013] 1. The material enters the preparation box through the feed port, and the stirring mechanism is started to stir the material. Water enters the first rotating shaft through the water inlet pipe and is discharged through the first water outlet and the second water outlet. The stirring mechanism rotates to drive the cleaning plate to rotate to cooperate with the water discharged from the second water outlet to clean the inner cavity of the preparation box, thereby preventing the concrete from drying up in the inner cavity of the concrete, preventing the dried concrete from affecting the life of the concrete preparation device and ensuring the quality of concrete preparation.

[0014] 2. Start the motor to drive the second gear to rotate, thereby rotating the first gear and the first rotating shaft. The rotation of the first rotating shaft causes the first stirring plate and the support plate to rotate. The support plate rotates and then the third gear engages with the preparation box, thereby causing the second rotating shaft to revolve while rotating on itself. The rotation of the second rotating shaft drives the second stirring plate to rotate, thereby stirring the concrete, which has a better stirring effect on the concrete. The rotation of the first rotating shaft causes the water in the inner cavity of the first rotating shaft to be discharged through the first water outlet and the second water outlet through centrifugal force, so that the impact force of the water on the material is greater, thereby having a better cleaning effect on the inside of the preparation box. The water is discharged through the second water outlet, and cooperates with the cleaning plate to clean the inner cavity of the preparation box, thereby having a better cleaning effect on the inner cavity of the preparation box. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is the structural diagram of the utility model;

[0016] Figure 2 For this utility model Figure 1 A front view of

[0017] Figure 3 For this utility model Figure 2 A top view of

[0018] Figure 4 For this utility model Figure 3 Sectional view at AA in the middle;

[0019] Figure 5 For this utility model Figure 4 Enlarged view of point B in the middle.

[0020] Figure numerals: 1. preparation box; 2. feed port; 3. stirring mechanism; 301. first rotating shaft; 302. first gear; 303. motor; 304. second gear; 305. first stirring plate; 306. support plate; 307. second rotating shaft; 308. second stirring plate; 309. third gear; 4. cleaning mechanism; 401. water inlet pipe; 402. first water outlet; 403. cleaning plate; 404. second water outlet; 5. discharge pipe. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not used to limit the utility model.

[0022] See also Figure 1-5 The utility model provides a technical solution: a concrete preparation device, comprising a preparation box 1, the upper end surface of the preparation box 1 is provided with a feed port 2, and the lower end surface of the preparation box 1 is connected to a discharge pipe 5, and the preparation box 1 is rotatably connected with a stirring mechanism 3;

[0023] The stirring mechanism 3 includes a first rotating shaft 301 and a supporting plate 306. The outer wall of the first rotating shaft 301 is rotatably connected to the upper end surface of the preparation box 1. The supporting plate 306 is connected to the first rotating shaft 301. The inner cavity of the first rotating shaft 301 is rotatably connected to the cleaning mechanism 4.

[0024] The cleaning mechanism 4 includes a water inlet pipe 401, a cleaning plate 403 and a second water outlet 404. The water inlet pipe 401 is rotatably connected to the inner cavity of the first rotating shaft 301. The upper end of the cleaning plate 403 is fixedly connected to the lower end surface of the support plate 306, and the side of the cleaning plate 403 that is away from each other overlaps the inner cavity of the preparation box 1. The second water outlet 404 is opened at the end of the support plate 306 that is away from each other.

[0025] The material enters the preparation box 1 through the feed port 2, and the stirring mechanism 3 is started to stir the material. Water enters the first rotating shaft 301 through the water inlet pipe 401. The first rotating shaft 301 rotates and the water in the inner cavity of the first rotating shaft 301 is discharged through the first water outlet 402 and the second water outlet 404 through centrifugal force, thereby increasing the impact force of water on the concrete, thereby achieving a better cleaning effect on the inside of the preparation box 1. The water is discharged through the second water outlet 404, and cooperates with the cleaning plate 403 to clean the inner cavity of the preparation box 1, thereby achieving a better cleaning effect on the inner cavity of the preparation box 1.

[0026] Specifically, the stirring mechanism 3 includes a first gear 302, a motor 303, a second gear 304 and a first stirring plate 305. The first gear 302 is fixedly connected to the upper end of the outer wall of the first rotating shaft 301, the lower end of the motor 303 is fixedly connected to the upper end surface of the preparation box 1, the second gear 304 is fixedly connected to the output end of the motor 303, and one side of the second gear 304 is meshed with one side of the first gear 302, and the first stirring plate 305 is fixedly connected to the outer wall of the first rotating shaft 301.

[0027] The starting motor 303 drives the second gear 304 to rotate, and the rotation of the second gear 304 drives the first gear 302 to rotate, thereby causing the first rotating shaft 301 to rotate. The rotation of the first rotating shaft 301 drives the first stirring plate 305 to rotate, thereby the preparation box 1, and the first stirring plate 305 is inclined, and the first stirring plates 305 are multiple and evenly arranged on the surface of the first rotating shaft 301, so as to have a better mixing effect on the concrete.

[0028] Specifically, the stirring mechanism 3 includes a second rotating shaft 307, a second stirring plate 308 and a third gear 309. The outer wall of the second rotating shaft 307 is rotatably connected to the support plate 306, the second stirring plate 308 is fixedly connected to the second rotating shaft 307, the lower end surface of the third gear 309 is fixedly connected to the upper end of the second rotating shaft 307, and one side of the third gear 309 is meshingly connected to the inner cavity of the preparation box 1.

[0029] The support plate 306 rotates to make the third gear 309 mesh with the preparation box 1, so that the second shaft 307 revolves and rotates at the same time. The rotation of the second shaft 307 drives the second stirring plate 308 to rotate, thereby stirring the concrete, thereby stirring the concrete in the preparation box 1 more comprehensively, and achieving a better concrete mixing effect.

[0030] Specifically, the cleaning mechanism 4 includes a first water outlet 402 , and the first water outlet 402 is opened on the outer wall of the upper end of the first rotating shaft 301 .

[0031] The water is discharged from the first water outlet 402 on the surface of the first rotating shaft 301 by the centrifugal force of the first rotating shaft 301 , so that the water cleans the stirring mechanism 3 in the inner cavity of the preparation box 1 , thereby achieving a more comprehensive cleaning of the inner cavity of the preparation box 1 .

[0032] Specifically, a water channel for cleaning the inner cavity of the preparation box 1 is opened inside the support plate 306 .

[0033] The water enters the water channel inside the support plate 306 through the centrifugal force of the first rotating shaft 301, and is discharged from the second water outlet 404 through the water channel, thereby cooperating with the cleaning plate 403, thereby making the cleaning plate 403 have a better cleaning effect on the preparation box 1.

[0034] The above embodiments are only used to illustrate the technical solution of the present invention, but not to limit it.

Claims

1. A concrete preparation device, comprising a preparation box (1), characterized in that: The upper end surface of the preparation box (1) is provided with a feed inlet (2), and the lower end surface of the preparation box (1) is connected to a discharge pipe (5), and the preparation box (1) is rotatably connected to a stirring mechanism (3); The stirring mechanism (3) comprises a first rotating shaft (301) and a supporting plate (306); the outer wall of the first rotating shaft (301) is rotatably connected to the upper end surface of the preparation box (1); the supporting plate (306) is in communication with the first rotating shaft (301); and the inner cavity of the first rotating shaft (301) is rotatably connected to a cleaning mechanism (4); The cleaning mechanism (4) comprises a water inlet pipe (401), a cleaning plate (403) and a second water outlet (404), wherein the water inlet pipe (401) is rotatably connected to the inner cavity of the first rotating shaft (301), the upper end of the cleaning plate (403) is fixedly connected to the lower end surface of the support plate (306), and the side of the cleaning plate (403) that is away from each other overlaps with the inner cavity of the preparation box (1), and the second water outlet (404) is opened at the end of the support plate (306) that is away from each other.

2. A concrete preparation device according to claim 1, characterized in that: The stirring mechanism (3) comprises a first gear (302), a motor (303), a second gear (304) and a first stirring plate (305); the first gear (302) is fixedly connected to the upper end of the outer wall of the first rotating shaft (301); the lower end of the motor (303) is fixedly connected to the upper end surface of the preparation box (1); the second gear (304) is fixedly connected to the output end of the motor (303); one side of the second gear (304) is meshedly connected to one side of the first gear (302); and the first stirring plate (305) is fixedly connected to the outer wall of the first rotating shaft (301).

3. A concrete preparation device according to claim 1, characterized in that: The stirring mechanism (3) comprises a second rotating shaft (307), a second stirring plate (308) and a third gear (309); the outer wall of the second rotating shaft (307) is rotatably connected to the support plate (306); the second stirring plate (308) is fixedly connected to the second rotating shaft (307); the lower end surface of the third gear (309) is fixedly connected to the upper end of the second rotating shaft (307); and one side of the third gear (309) is meshingly connected to the inner cavity of the preparation box (1).

4. A concrete preparation device according to claim 1, characterized in that: The cleaning mechanism (4) comprises a first water outlet (402), and the first water outlet (402) is opened on the outer wall of the upper end of the first rotating shaft (301).

5. A concrete preparation device according to claim 1, characterized in that: A water channel for cleaning the inner cavity of the preparation box (1) is provided inside the support plate (306).