Temporary cable guyed cable hanging basket

By designing a temporary cable pulling basket, using an anchoring system and a temporary cable with length adjustment, the problem of degradation of fixed performance of permanent cables in the existing technology in the construction of wide bridges is solved, and higher construction safety and stability are achieved.

CN222796218UActive Publication Date: 2025-04-25山东丰年路桥钢构有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420891856.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2025-04-25
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

In the prior art, permanent cables are mainly used for fixing the hanging basket during bridge construction. However, when the bridge width exceeds 30m, the fixing and stability of the permanent cable to the hanging basket will decrease, resulting in difficult to ensure construction safety and stability.

Method used

A temporary cable traction cable hanging basket is designed, which is fixed under the bridge deck through an anchoring system. The temporary cable is connected to the anchoring system and the bridge tower winch. The length can be adjusted to adapt to the position of the hanging basket after it moves, providing a more stable fixing method.

Benefits of technology

Through the design of the temporary cable traction basket, it can reduce labor intensity, improve construction speed, enhance construction safety and quality stability, and is suitable for bridge construction with a width of more than 30m.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222796218U_ABST
    Figure CN222796218U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of bridge construction, and particularly relates to a temporary cable guy cable hanging basket which comprises an anchoring system, a guy cable hanging basket body, a temporary cable and a winch, the anchoring system is fixedly connected to a bridge floor, the guy cable hanging basket body is arranged below the bridge floor and penetrates through the bridge floor to be connected with the anchoring system, and the winch is arranged on the guy cable hanging basket body. One end of the temporary cable is connected with the front end of the anchoring system, and the other end of the temporary cable is connected with a winch at the top end of a bridge tower; by adopting the temporary cable hanging basket, the labor intensity can be reduced, the influence of a permanent cable on construction is reduced, the construction speed is high, the safety quality can be better ensured, and the construction method is simple and easy to master by constructors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge construction, in particular to a temporary rope-pulling rope hanging basket. Background Art

[0002] Hanging basket construction, also known as construction hanging basket, is a major equipment for the segmented construction of prestressed concrete continuous beams, T-shaped steel structures and cantilever beams. It can move forward as a whole along the track. Hanging basket construction can use: truss hanging basket, triangular hanging basket, prismatic hanging basket and cable-stayed hanging basket and other processes. It is most widely used in bridge construction. In the existing technology, most of the ways to fix the hanging basket on the bridge use permanent cables, but the use of permanent cables is only limited to the cable-stayed construction of bridges with a width of less than 30m. If the width is larger, it will lead to a decrease in the fixation and stability of the permanent cables on the hanging basket. Therefore, a better way is needed to replace the permanent cables to connect and fix the hanging basket to improve the stability of the system and the safety of construction.

[0003] Therefore, in view of the above-mentioned problems, a temporary rope-pulling rope hanging basket is designed in a targeted manner. Utility Model Content

[0004] The utility model aims at the above-mentioned problems and specifically designs a temporary rope hanging basket, which can reduce labor intensity and the influence of permanent ropes on construction through the temporary rope hanging basket, and has a fast construction speed, can better ensure safety and quality, and has a simple construction method and is easy for construction personnel to master.

[0005] To achieve the above-mentioned purpose, the utility model provides a temporary cable pulling rope basket, comprising: an anchoring system, a cable hanging basket, a temporary cable and a winch, the anchoring system is fixedly connected to the bridge deck, the cable hanging basket is arranged below the bridge deck and passes through the bridge deck to be connected to the anchoring system, one end of the temporary cable is connected to the front end of the anchoring system, and the other end of the temporary cable is connected to the winch at the top of the bridge tower.

[0006] In the above manner, the guy wire basket is fixed under the bridge deck through the anchoring system. The temporary cable can fix the guy wire basket by tightening the anchoring system. The other end of the temporary cable is connected to the winch on the top of the bridge tower. The length of the temporary cable can be adjusted to adapt to the position of the guy wire basket after it moves, so as to continue to fix the guy wire basket.

[0007] Furthermore, the anchoring system includes a main longitudinal beam, an upper cross beam and a fastening device, wherein there are two main longitudinal beams which are parallel to each other, one end of the main longitudinal beam is fixedly connected to the bridge deck via a fastening device, the other end of the main longitudinal beam extends out of the bridge deck and is connected to the hanging basket via the fastening device, and the upper cross beam is fixedly connected between the two main longitudinal beams and is located at the end of the main longitudinal beam.

[0008] In the above manner, the upper cross beam between the two main longitudinal beams is a fixed fulcrum for the temporary cable. The length of the upper cross beam is greater than the length of the permanent cable fixed between the upper fulcrums of the guying basket in the prior art, which can provide better stability and safety.

[0009] Furthermore, the guy wire hanging basket comprises: a lower cross beam, a template and hanging legs, the two ends of the lower cross beam are fixedly connected with the hanging legs, the template support is arranged on the upper part of the lower cross beam, and the main longitudinal beam is connected to the lower cross beam through the fastening device. The template is used for supporting and shaping the bridge casting.

[0010] Furthermore, the temporary cable is connected to the upper cross beam via a bottom fixing device.

[0011] Furthermore, the fastening device includes an anchor beam and a steel rod screw, the anchor beam is arranged on the main longitudinal beam, and the steel rod screw passes through the anchor beam and is connected to the hanging basket.

[0012] Furthermore, the bottom fixing device includes a double-ear plate base, a double-pin ear plate, a fork ear, a long pin shaft and a short pin shaft, the double-ear plate base is fixedly connected to the two ends of the upper crossbeam, the double-pin ear plate is connected to the double-ear plate base through the long pin shaft, the fork ear is connected to the double-pin ear plate through the short pin shaft, and the temporary cable is connected to the fork ear. In the above manner, the bottom fixing structure is a universal twist structure, which can provide more degrees of freedom when adjusting the temporary cable.

[0013] Furthermore, the lower cross beam is provided with a protruding connection block, the connection block is located at the front end of the lower cross beam, and the front end of the main longitudinal beam is connected to the connection block through the fastening device. The protruding connection block can more effectively improve the connection stability between the temporary cable and the lower cross beam.

[0014] In summary, the utility model has the following advantages and beneficial technical effects:

[0015] 1. The upper crossbeam on the temporary rope hanging basket of the utility model provides a connection point for the temporary rope, and the upper crossbeam has a larger span, which can make the distance between the two temporary ropes larger, providing better stability and safety;

[0016] 2. The utility model uses a temporary cable-pulling hanging basket to balance the main longitudinal beam and bear the front end load of the concrete beam together with the inclined cable. The temporary cable is hung on the front end of the main beam of the hanging basket, which optimizes the force form and is similar to a double-cable hanging basket. It is easy to control the elevation deviation of the cantilever casting section and can correct the linear error of the closing section at any time to ensure the balance of the hanging basket. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0018] Figure 1 It is a structural schematic diagram of a temporary rope-pulling rope hanging basket of the utility model;

[0019] Figure 2 It is a partial enlarged view of a temporary rope-pulling rope hanging basket of the utility model;

[0020] Figure 3 It is a side view of a temporary rope-pulling rope hanging basket of the utility model;

[0021] Figure 4 It is a structural schematic diagram of a bottom fixing device of a temporary rope-pulling rope hanging basket of the utility model;

[0022] Figure 5 The utility model is a schematic diagram of the installation structure of a temporary rope-pulling rope hanging basket.

[0023] The reference numerals in the accompanying drawings are:

[0024] 1-anchoring system; 11-main longitudinal beam; 12-upper cross beam; 13-fastening device; 14-anchor beam; 15-steel rod screw;

[0025] 2-Gusting rope hanging basket; 21-lower beam; 22-connecting block; 23-template;

[0026] 3-temporary rope; 4-bottom fixing device; 41-double-ear plate base; 42-double-pin ear plate; 43-fork ear; 44-long pin shaft; 45-short pin shaft; 5-winch; 6-bridge deck; 7-bridge tower. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-Figure 5 The utility model is further described in detail, and examples of embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar components or components having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the utility model, and should not be construed as limiting the utility model.

[0028] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, it can be a mechanical connection or an electrical connection, it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] In the description of this embodiment, the terms "upper", "lower", "right", etc., are based on the directions or positions shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0030] like Figure 1 and Figure 5 As shown, it includes: an anchoring system 1, a cable basket 2, a temporary cable 3 and a winch 5. The anchoring system 1 is fixedly connected to the bridge deck 6. The cable basket 2 is arranged below the bridge deck 6 and passes through the bridge deck 6 to be connected to the anchoring system 1. One end of the temporary cable 3 is connected to the front end of the anchoring system 1, and the other end of the temporary cable 3 is connected to the winch 5 at the top of the bridge tower 7.

[0031] like Figure 1 and Figure 2 As shown, the anchoring system 1 includes a main longitudinal beam 11, an upper cross beam 12 and a fastening device 13. There are two main longitudinal beams 11 and they are parallel to each other. One end of the main longitudinal beam 11 is fixedly connected to the bridge deck 6 by the fastening device 13, and the other end of the main longitudinal beam 11 extends out of the bridge deck 6 and is connected to the cable hanging basket 2 by the fastening device 13. The upper cross beam 12 is fixedly connected between the two main longitudinal beams 11 by welding and is located at the end of the main longitudinal beam 11. The upper cross beam 12 extends out of the bridge deck 6.

[0032] like Figure 1 and Figure 2 As shown, the guy wire hanging basket 2 includes a lower cross beam 21 and a template 23. Both ends of the lower cross beam 21 are fixedly connected with hanging legs by welding. The template 23 is supported and arranged on the upper part of the lower cross beam 21. The main longitudinal beam 11 is connected to the lower cross beam 21 by a fastening device 13.

[0033] like Figure 2 and Figure 3 As shown, the temporary cable 3 is connected to the upper cross beam 12 via the bottom fixing device 4 .

[0034] like Figure 2 As shown, the fastening device 13 includes an anchor beam 14 and a steel rod screw 15 . The anchor beam 14 is placed on the main longitudinal beam 11 , and the steel rod screw 15 passes through the anchor beam 14 and is connected to the guy wire basket 2 .

[0035] like Figure 3As shown, the bottom fixing device 4 includes a double-ear plate base 41, a double-pin ear plate 42, a fork ear 43, a long pin shaft 44 and a short pin shaft 45. The double-ear plate base 41 is fixed to the two ends of the upper cross beam 12 by welding or bolting. The double-pin ear plate 42 is connected to the double-ear plate base 41 through the long pin shaft 44, the fork ear 43 is connected to the double-pin ear plate 42 through the short pin shaft 45, and the temporary rope 3 is connected to the fork ear 43.

[0036] like Figure 1 and Figure 2 As shown, a protruding connecting block 22 is provided on the lower cross beam 21, and the connecting block 22 is located at the front end of the lower cross beam 21. The front end of the main longitudinal beam 11 is connected to the connecting block 22 through a fastening device 13, and the rear section of the main longitudinal beam 11 is connected to the cable hanging basket 2 through the fastening device 13. The steel rod screw 15 here passes through the bridge, and the fastening device 13 connecting the front end of the main longitudinal beam 11 with the connecting block 22 is located outside the bridge.

[0037] The working principle of the temporary rope hanging basket of the utility model is:

[0038] The main longitudinal beam 11 is fixed to the bridge deck 6 by a fastening device 13 and passes through the bridge deck 6 to be connected to the cable basket 2 below, so that the cable basket 2 is suspended below the bridge, and the end of the main longitudinal beam 11 extends out of the bridge deck 6. An upper cross beam 12 is welded between the two main longitudinal beams 11 at this end. The two ends of the upper cross beam 12 are connected to the temporary cable 3 through the bottom fixing device 4, and the other end of the temporary cable 3 is fixed to the bridge tower 7. At the same time, the end of the main longitudinal beam 11 close to the upper cross beam 12 is also connected to the cable basket 2 below through the fastening device 13.

[0039] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A temporary rope hanging basket, characterized in that: include: An anchoring system (1), a cable hanging basket (2), a temporary cable (3) and a winch (5), wherein the anchoring system (1) is fixedly connected to a bridge deck (6), the cable hanging basket (2) is arranged below the bridge deck (6) and passes through the bridge deck (6) to be connected to the anchoring system (1), one end of the temporary cable (3) is connected to the front end of the anchoring system (1), and the other end of the temporary cable (3) is connected to the winch (5) at the top of a bridge tower (7).

2. A temporary rope hanging basket according to claim 1, characterized in that: The anchoring system (1) comprises a main longitudinal beam (11), an upper cross beam (12) and a fastening device (13); the main longitudinal beams (11) are two and parallel to each other; one end of the main longitudinal beam (11) is fixedly connected to the bridge deck (6) via the fastening device (13); the other end of the main longitudinal beam (11) extends out of the bridge deck (6) and is connected to the guying basket (2) via the fastening device (13); the upper cross beam (12) is fixedly connected between the two main longitudinal beams (11) and is located at the end of the main longitudinal beam (11).

3. A temporary rope hanging basket according to claim 2, characterized in that: The guy wire hanging basket (2) comprises a lower cross beam (21) and a template (23), the two ends of the lower cross beam (21) are fixedly connected with hanging legs, the template (23) is supported and arranged on the upper part of the lower cross beam (21), and the main longitudinal beam (11) is connected to the lower cross beam (21) via the fastening device (13).

4. A temporary rope hanging basket according to claim 2, characterized in that: The temporary cable (3) is connected to the upper crossbeam (12) via a bottom fixing device (4).

5. A temporary rope hanging basket according to claim 2, characterized in that: The fastening device (13) comprises an anchor beam (14) and a steel rod screw (15); the anchor beam (14) is arranged on the main longitudinal beam (11); and the steel rod screw (15) passes through the anchor beam (14) and is connected to the guy wire basket (2).

6. A temporary rope hanging basket according to claim 4, characterized in that: The bottom fixing device (4) comprises a double-ear plate base (41), a double-pin ear plate (42), a fork ear (43), a long pin shaft (44) and a short pin shaft (45); the double-ear plate base (41) is fixedly connected to both ends of the upper cross beam (12); the double-pin ear plate (42) is connected to the double-ear plate base (41) via the long pin shaft (44); the fork ear (43) is connected to the double-pin ear plate (42) via the short pin shaft (45); and the temporary rope (3) is connected to the fork ear (43).

7. A temporary rope hanging basket according to claim 3, characterized in that: The lower cross beam (21) is provided with a protruding connection block (22), the connection block (22) is located at the front end of the lower cross beam (21), and the front end of the main longitudinal beam (11) is connected to the connection block (22) via the fastening device (13).