Building template connecting frame for civil engineering
By designing a building formwork connection frame including board body connecting frame, auxiliary connecting frame, adjustment board and positioning board, the problem of complex assembly of traditional connecting frames and difficulty in adapting to formwork of different widths is solved, and the rapid installation and disassembly of building formwork is achieved, and the work efficiency is improved.
Patent Information
- Application Number
- CN202421768838.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-25
AI Technical Summary
Traditional building formwork connection frames are complex assembled, not tightly connected, and difficult to adapt to building formwork of different widths, resulting in low installation and disassembly efficiency.
A building formwork connecting frame including a board body connecting frame, auxiliary connecting frame, adjustment board and positioning board is designed. Through sliding installation, adjustable design and the use of extruded locking board, the rapid installation and disassembly of building formwork is achieved.
It realizes the rapid installation and disassembly of building formwork, saves manpower, improves work efficiency, and is suitable for use of building formwork of multiple widths.
Smart Images

Figure CN222797065U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a construction template connecting frame for civil engineering. Background Art
[0002] Building formwork is a temporary supporting structure, which is made according to the design requirements to shape the concrete structure and components into the specified positions and geometric dimensions, maintain their correct positions, and bear the deadweight of the building formwork and the external loads acting on it. The supporting structure is a temporary structure that supports the panels, concrete and construction loads. At present, the connection between the building formwork and the supporting structure is connected by a connecting frame.
[0003] The traditional connecting frame is composed of several steel materials, and the assembly is relatively complicated. The connecting frame is placed outside the building formwork, the connection is not tight, and a separate connecting piece is required between the connecting frame and the supporting structure, which makes the operation more complicated.
[0004] In the related art, reference can be made to the Chinese patent with announcement number CN221168697U, which specifically discloses a construction formwork connecting frame for civil engineering, including a plate body, wherein the plate body is located between two construction formworks and is used to connect the construction formworks on both sides, and the plate body and the construction formworks are fixedly connected by bolts, a back convex strip is connected to the middle of the front side of the plate body, a plurality of connecting parts are movably connected to the back convex strip, and the back convex strip is fixedly connected to the support pipe fitting through the connecting parts.
[0005] A number of movable connecting pieces are arranged on the convex strips of the plate body. Through the connection between the connecting pieces and the supporting pipe fittings, the building formwork and the supporting pipe fittings are connected as a whole, thereby ensuring the overall stability of the building formwork. Compared with the use of the connecting frame in the prior art, the operation is simpler and the connecting pieces can be directly used to connect and fix the supporting pipe fittings.
[0006] The applicant discovered that there were deficiencies in the use of the above-mentioned civil engineering building formwork connecting frame; since the plate body and the building formwork were fixedly connected by multiple bolts, a lot of time was required to install and disassemble the building formwork, resulting in reduced work efficiency, and the plate body in the comparative document could only be used for building formworks of specified widths, reducing its practicality.
[0007] In view of this, the present technical solution proposes a building formwork connecting frame for civil engineering, so as to better solve the above-mentioned problems. Utility Model Content
[0008] The purpose of the utility model is to provide a building template connecting frame for civil engineering in order to solve the above-mentioned problems.
[0009] The technical solution adopted by the utility model is as follows: a construction formwork connecting frame for civil engineering, comprising a plate connecting frame and a construction formwork, an auxiliary connecting plate is slidably installed inside the plate connecting frame, and an adjusting plate is fixed above the auxiliary connecting plate, a positioning plate is adjustably installed above the adjusting plate through a screw rod, the lower part of the plate connecting frame and the positioning plate are clamped in a limiting groove provided inside the construction formwork, and a positioning block is fixed at the relative position of the plate connecting frame and the positioning plate, and the positioning block is plugged into the interior of the construction formwork;
[0010] The plate body connecting frame and the right side of the adjustment plate are fixed with a pipe fitting installation clamp clamped on the supporting pipe fitting, and a threaded rod is fixed on the right side of the pipe fitting installation clamp, an extrusion locking plate is sleeved on the threaded rod and fits the side of the supporting pipe fitting, and a fastening nut is threadedly connected to the extrusion locking plate for extrusion limiting.
[0011] In a preferred embodiment, the lower part of the plate connecting frame is an L-shaped structure, and the horizontal plate below the plate connecting frame has the same length as the positioning plate.
[0012] In a preferred embodiment, guide rods are inserted into both sides of the interior of the adjustment plate, and the guide rods are fixedly connected to the positioning plate.
[0013] In a preferred embodiment, a turntable is rotatably mounted in the middle of the positioning plate, and a screw rod is fixed below the turntable, and the screw rod is threadedly connected to a threaded hole provided inside the adjustment plate.
[0014] In a preferred embodiment, positioning grooves communicating with the limiting grooves are provided at the upper and lower parts of the interior of the building template, and the positioning blocks are inserted into the positioning grooves.
[0015] In a preferred embodiment, the pipe fitting installation clamp is a U-shaped structure, and the pipe fitting installation clamp is adapted to the clamping position of the supporting pipe fitting.
[0016] In a preferred embodiment, through holes for use with the threaded rod are opened at the front and rear of the limiting groove, and the threaded rod is inserted into the through holes, and the diameter of the fastening nut is larger than the inner diameter of the through hole inside the extrusion locking plate.
[0017] To sum up, due to the adoption of the above-mentioned technical scheme, the beneficial effects of the utility model are: it is easy to quickly install a group of building templates, making it more convenient to disassemble and assemble a group of building templates, saving manpower, increasing work efficiency, and suitable for the installation and use of building templates of various widths.
[0018] 1. In the utility model, the pipe fitting installation clamp fixed on the right side of the plate body connecting frame is first clamped under the supporting pipe fitting, and then the extrusion locking plate is sleeved on the threaded rod and the fastening nut is threadedly connected to the threaded rod to position the extrusion locking plate. At this time, the pipe fitting installation clamp can be positioned on the supporting pipe fitting, and the pipe fitting installation clamp fixed on the right side of the adjustment plate is also clamped on the supporting pipe fitting, and a set of limiting grooves provided inside the building templates are placed on the horizontal plate below the plate body connecting frame, and at the same time, the positioning blocks on the horizontal plate are inserted into the limiting grooves provided inside the building templates. At this time, the preliminary installation and limiting of a set of building templates are completed.
[0019] 2. In the utility model, the position of the positioning plate is adjusted according to the height of the building template, so that the positioning plate is inserted into the limit groove provided above the building template, and the positioning block fixed at the bottom of the positioning plate is inserted into the upper positioning groove, and then the threaded rod on the pipe fitting installation clamp fixed on the right side of the adjustment plate is sleeved with an extrusion locking plate and a fastening nut is threadedly installed on the threaded rod, so that the pipe fitting installation clamp above the right side of the adjustment plate can be positioned above the supporting pipe fitting.
[0020] 3. In the utility model, when disassembling the building template, the turntable is rotated to one side so that the screw rod drives the positioning plate to move upward, and the positioning block fixed at the bottom of the positioning plate can be separated from the positioning groove above the inside of the building template. After the positioning plate is moved to a certain height, a group of building templates can be lifted upward, so that the positioning groove below the building template is separated from the positioning block on the horizontal plate below the plate body connecting frame, and the building template can be removed. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the structure of the utility model from the first perspective;
[0022] Figure 2 This is a schematic diagram of the structure of the utility model from a second viewing angle;
[0023] Figure 3 This is a schematic diagram of the installation structure of the building template and the connecting frame of the utility model;
[0024] Figure 4 For this utility model Figure 1 A schematic diagram of the enlarged structure of the middle A area;
[0025] Figure 5 For this utility model Figure 1 Schematic diagram of the enlarged structure of region B in the middle.
[0026] Markings in the figure: 1-plate connecting frame; 2-adjusting plate; 3-auxiliary connecting plate; 4-guide rod; 5-positioning plate; 6-turntable; 7-screw rod; 8-positioning block; 9-building template; 10-limiting groove; 11-positioning groove; 12-pipe fitting installation clamp; 13-support pipe fitting; 14-threaded rod; 15-extrusion locking plate; 16-fastening nut. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model will be clearly and completely described below in combination with the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] The following will be combined Figure 1-Figure 5 A construction formwork connecting frame for civil engineering according to an embodiment of the utility model is described in detail.
[0029] refer to Figure 1 , 3 As shown in Figure 4, a building template connection frame for civil engineering includes a plate body connection frame 1 and a building template 9, an auxiliary connection plate 3 is slidably installed inside the plate body connection frame 1, and an adjustment plate 2 is fixed above the auxiliary connection plate 3, and a positioning plate 5 is adjustably installed above the adjustment plate 2 through a screw rod 7, the bottom of the plate body connection frame 1 is an L-shaped structure, and the horizontal plate below the plate body connection frame 1 is the same length as the positioning plate 5, guide rods 4 are inserted on both sides of the inside of the adjustment plate 2, and the guide rods 4 are fixedly connected to the positioning plate 5, and the middle of the positioning plate 5 A turntable 6 is rotatably installed on the part, and a screw rod 7 is fixed below the turntable 6. The screw rod 7 is threadedly connected to a threaded hole opened inside the adjusting plate 2. The bottom of the plate connecting frame 1 and the positioning plate 5 are clamped in a limiting groove 10 opened inside the building template 9, and a positioning block 8 is fixed at the relative position of the plate connecting frame 1 and the positioning plate 5, and the positioning block 8 is inserted into the inside of the building template 9. Positioning grooves 11 connected with the limiting grooves 10 are opened up and down inside the building template 9, and the positioning block 8 is inserted into the positioning groove 11.
[0030] refer to Figure 1 , 2As shown in Figure 5, the right sides of the plate connecting frame 1 and the adjusting plate 2 are fixed with a pipe fitting installation clamp 12 which is clamped on the supporting pipe fitting 13. The pipe fitting installation clamp 12 is a U-shaped structure, and the pipe fitting installation clamp 12 is adapted to the clamping position of the supporting pipe fitting 13. A threaded rod 14 is fixed on the right side of the pipe fitting installation clamp 12. An extrusion locking plate 15 is sleeved on the threaded rod 14 and fits with the side of the supporting pipe fitting 13. A fastening nut 16 for extrusion limiting the extrusion locking plate 15 is threadedly connected to the threaded rod 14. Through holes for cooperating with the threaded rod 14 are opened in the front and back of the limiting groove 10, and the threaded rod 14 is inserted in the through hole. The diameter of the fastening nut 16 is larger than the inner diameter of the through hole inside the extrusion locking plate 15.
[0031] The advantages of this application are: it is easy to quickly install a group of building templates 9, making it more convenient to disassemble and assemble a group of building templates 9, saving manpower, increasing work efficiency, and being suitable for the installation and use of building templates 9 of various widths.
[0032] Working principle: When installing the building formwork 9, first clamp the pipe installation clamp 12 fixed on the right side of the plate body connecting frame 1 under the supporting pipe 13, then put the extrusion locking plate 15 on the threaded rod 14 and thread the fastening nut 16 on the threaded rod 14 to position the extrusion locking plate 15. At this time, the pipe installation clamp 12 can be positioned on the supporting pipe 13, and the pipe installation clamp 12 fixed on the right side of the adjustment plate 2 is also clamped on the supporting pipe 13. Place a set of limiting grooves 10 opened inside the building formwork 9 on the horizontal plate below the plate body connecting frame 1, and at the same time, the positioning block 8 on the horizontal plate is inserted into the limiting groove 10 opened inside the building formwork 9. At this time, the preliminary installation and limiting of a set of building formworks 9 are completed.
[0033] The position of the positioning plate 5 is adjusted according to the height of the building template 9, so that the positioning plate 5 is inserted into the limiting groove 10 provided above the building template 9, and the positioning block 8 fixed at the bottom of the positioning plate 5 is inserted into the upper positioning groove 11, and then the threaded rod 14 on the pipe fitting installation clamp 12 fixed on the right side of the adjustment plate 2 is sleeved with an extrusion locking plate 15 and a fastening nut 16 is threadedly installed on the threaded rod 14, so that the pipe fitting installation clamp 12 above the right side of the adjustment plate 2 can be positioned above the supporting pipe 13.
[0034] When disassembling the building template 9, the turntable 6 is rotated to one side so that the screw rod 7 drives the positioning plate 5 to move upward, and the positioning block 8 fixed at the bottom of the positioning plate 5 can be separated from the positioning groove 11 above the inside of the building template 9. After the positioning plate 5 is moved to a certain height, a group of building templates 9 can be lifted upward so that the positioning groove 11 below the building template 9 is separated from the positioning block 8 on the horizontal plate below the plate connecting frame 1, and the building template 9 can be removed.
[0035] The above-mentioned embodiments only express several implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the utility model patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.
Claims
1. A building formwork connecting frame for civil engineering, comprising a plate connecting frame (1) and a building formwork (9), characterized in that: An auxiliary connecting plate (3) is slidably mounted inside the plate connecting frame (1), and an adjusting plate (2) is fixed above the auxiliary connecting plate (3); a positioning plate (5) is adjustably mounted above the adjusting plate (2) via a screw rod (7); the lower part of the plate connecting frame (1) and the positioning plate (5) are clamped in a limiting groove (10) provided inside the building template (9); a positioning block (8) is fixed at the relative position of the plate connecting frame (1) and the positioning plate (5), and the positioning block (8) is plugged into the interior of the building template (9); The right sides of the plate body connecting frame (1) and the adjusting plate (2) are both fixed with a pipe fitting installation clamp (12) clamped on the supporting pipe fitting (13), and the right side of the pipe fitting installation clamp (12) is fixed with a threaded rod (14), the threaded rod (14) is sleeved with an extrusion locking plate (15) and fits with the side of the supporting pipe fitting (13), and the threaded rod (14) is threadedly connected with a fastening nut (16) used for extrusion limiting the extrusion locking plate (15).
2. A civil engineering building formwork connection frame as claimed in claim 1, characterized in that: The lower part of the plate body connecting frame (1) is an L-shaped structure, and the horizontal plate below the plate body connecting frame (1) and the positioning plate (5) are of the same length.
3. A civil engineering building formwork connection frame as claimed in claim 1, characterized in that: Guide rods (4) are inserted into the two sides of the interior of the adjustment plate (2), and the guide rods (4) are fixedly connected to the positioning plate (5).
4. A civil engineering building formwork connection frame as claimed in claim 3, characterized in that: A turntable (6) is rotatably mounted in the middle of the positioning plate (5), and a screw rod (7) is fixed below the turntable (6). The screw rod (7) is threadedly connected to a threaded hole provided inside the adjustment plate (2).
5. A civil engineering building formwork connection frame as claimed in claim 1, characterized in that: The interior of the building template (9) is provided with positioning grooves (11) connected to the limiting groove (10) at the top and bottom, and the positioning block (8) is inserted into the positioning groove (11).
6. A civil engineering building formwork connection frame as claimed in claim 1, characterized in that: The pipe fitting installation clamp (12) is a U-shaped structure, and the pipe fitting installation clamp (12) is adapted to the clamping position of the supporting pipe fitting (13).
7. A civil engineering building formwork connection frame as claimed in claim 1, characterized in that: The limiting groove (10) is provided with through holes at the front and rear ends thereof for use with the threaded rod (14), and the threaded rod (14) is inserted into the through holes. The diameter of the fastening nut (16) is larger than the inner diameter of the through hole inside the extrusion locking plate (15).
Citation Information
Patent Citations
Building template connecting frame for civil engineering
CN221168697U