Prefabricated balcony mounting and fixing device
By designing the prefabricated balcony installation fixture, the prefabricated balcony is stabilized by using screw sleeves and adjustable components, the problem of horizontal deviation of the prefabricated balcony after lifting is solved, and positioning accuracy and construction efficiency are improved.
Patent Information
- Application Number
- CN202421488834.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-06-27
AI Technical Summary
In the prior art, prefabricated balcony is prone to horizontal deviation after the lifting is completed, resulting in shaking and deviation problems during construction.
A prefabricated balcony mounting fixture is designed, including a screw sleeve, a first connection piece and an adjustable assembly. By pre-embedding the screw sleeve on the prefabricated exterior wall and the balcony, the first connecting member is connected to the screw sleeve, and the position of the second connecting member is adjusted through an adjustable assembly, the stable positioning of the prefabricated balcony is achieved.
It effectively prevents the prefabricated balcony from horizontally deviating after lifting, reduces the lifting positioning time, and ensures the positioning quality of the prefabricated balcony after concrete pouring and forming.
Smart Images

Figure CN222810180U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of assembled building structures, and in particular relates to a prefabricated balcony installation and fixing device. Background Art
[0002] At present, after the prefabricated balconies in prefabricated buildings are hoisted, they are only supported and fixed by the scaffolding below, but the horizontal displacement cannot be effectively controlled. When the steel bars are tied and other construction processes are carried out on the prefabricated balconies, the prefabricated balconies are easily shaken and dislocated. Utility Model Content
[0003] The purpose of the embodiment of the utility model is to provide a prefabricated balcony installation and fixing device, aiming to solve the problem of horizontal deviation of the prefabricated balcony in the prior art after the installation is completed.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0005] A prefabricated balcony installation and fixing device is used to connect the prefabricated balcony to a prefabricated exterior wall. The prefabricated balcony installation and fixing device comprises a screw sleeve, a first connecting piece and an adjustable component. The screw sleeve is pre-buried in the prefabricated exterior wall and the prefabricated balcony. The adjustable component comprises an adjusting piece and two second connecting pieces. The two ends of the adjusting piece are respectively threadedly connected to the two second connecting pieces, and the thread directions of the two second connecting pieces are opposite. One end of the first connecting piece is threadedly connected to the screw sleeve, and the other end of the first connecting piece is hinged to the end of the second connecting piece away from the adjusting piece.
[0006] Furthermore, the first connecting member includes a screw rod and a connecting portion which are integrally connected, the screw rod is threadedly connected in the screw sleeve, and the connecting portion is hinged to the second connecting member via a pin.
[0007] Furthermore, the connecting portion has a U-shaped groove, and one end of the second connecting member extends into the U-shaped groove.
[0008] Furthermore, the connecting portion has a first through hole passing through the U-shaped groove, the second connecting member has a second through hole at one end away from the adjusting member, and the pin shaft member is detachably provided with the first through hole, the second through hole and the U-shaped groove.
[0009] Furthermore, the pin shaft member includes a bolt and a nut, one end of the screw passes through the first through hole, the second through hole and the U-shaped groove, and the nut is threadedly connected to the bolt and abuts against the connecting portion.
[0010] Furthermore, the screw sleeve embedded in the prefabricated balcony is located on the left and right ends of the prefabricated balcony, and is vertically embedded in the left and right ends of the prefabricated balcony; the screw sleeve embedded in the prefabricated exterior wall is located on the left and right sides of the prefabricated balcony, and is vertically embedded in the outer side surface of the prefabricated exterior wall.
[0011] Furthermore, the screw sleeve includes an integrally formed inner thread sleeve, a baffle and a convex portion, the baffle and the screw portion are respectively connected to the two ends of the inner thread sleeve, the inner thread sleeve is threadedly connected to the first connecting piece, the baffle of the screw sleeve embedded in the prefabricated balcony abuts against the end surface of the prefabricated balcony, the inner thread sleeve and the convex portion of the screw sleeve embedded in the prefabricated balcony extend into the interior of the prefabricated balcony, the baffle of the screw sleeve embedded in the prefabricated exterior wall abuts against the outer side surface of the prefabricated exterior wall, and the inner thread sleeve and the convex portion of the screw sleeve embedded in the prefabricated exterior wall extend into the interior of the prefabricated exterior wall.
[0012] Furthermore, the adjusting member has a through hole, the through hole penetrates the adjusting member along the length direction of the adjusting member, and the second connecting member extends into the through hole.
[0013] Furthermore, the surface of the adjusting member has friction lines.
[0014] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0015] The utility model embeds a screw sleeve in a prefabricated exterior wall and a prefabricated balcony respectively, uses one end of a first connecting piece to be threadedly connected to the screw sleeve, uses one second connecting piece on an adjustable component to be hinged to the first connecting piece connected to the prefabricated balcony, and uses another second connecting piece on the adjustable component to be hinged to the first connecting piece connected to the prefabricated exterior wall. By rotating the adjusting piece on the adjustable component, the two second connecting pieces can be driven to approach or move away from each other at the same time, so as to adjust the installation positioning of the prefabricated balcony. After the prefabricated balcony is positioned, it is not easy to deviate, thereby reducing the hoisting positioning time and ensuring the positioning quality of the prefabricated balcony after concrete casting. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the prefabricated balcony installation and fixing device provided by the embodiment of the utility model;
[0017] Figure 2 It is a schematic diagram of a top view of the structure of the prefabricated balcony installation and fixing device provided in an embodiment of the utility model connecting the prefabricated balcony to the prefabricated exterior wall;
[0018] Figure 3It is a side view structural schematic diagram of the prefabricated balcony installation and fixing device provided by the embodiment of the utility model connecting the prefabricated balcony to the prefabricated exterior wall;
[0019] Figure 4 yes Figure 2 A region in the figure is an enlarged cross-sectional structural diagram;
[0020] Figure 5 yes Figure 3 A schematic diagram of the enlarged cross-sectional structure of the B area;
[0021] Figure 6 yes Figure 1 Schematic diagram of the structure of the adjustable component in.
[0022] The reference numerals in the figures are:
[0023] 100. Prefabricated balcony; 200. Prefabricated exterior wall; 1. Screw sleeve; 11. Internal thread sleeve; 12. Baffle; 13. Protrusion; 2. First connecting member; 21. Screw rod; 22. Connecting portion; 221. U-shaped groove; 222. First through hole; 3. Adjustable component; 31. Adjusting member; 311. Friction pattern; 32. Second connecting member; 321. Second through hole; 4. Pin member; 41. Bolt; 42. Nut. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0025] In the description of the present utility model, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the utility model product is usually placed when used. It is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.
[0026] like Figures 1 to 6As shown, the embodiment of the utility model provides a prefabricated balcony 100 installation and fixing device, which is used to connect the prefabricated balcony 100 to the prefabricated exterior wall 200. The prefabricated balcony 100 installation and fixing device includes a screw sleeve 1, a first connecting member 2 and an adjustable component 3. The screw sleeve 1 is pre-embedded in the prefabricated exterior wall 200 and the prefabricated balcony 100. The adjustable component 3 includes an adjusting member 31 and two second connecting members 32. The two ends of the adjusting member 31 are respectively threadedly connected to the two second connecting members 32, and the thread directions of the two second connecting members 32 are opposite. Specifically, the adjusting member 31 has a through hole, which penetrates the adjusting member 31 along the length direction of the adjusting member 31, and the second connecting member 32 extends into the through hole.
[0027] One end of the first connecting member 2 is threadedly connected to the screw sleeve 1, and the other end of the first connecting member 2 is hinged to the end of the second connecting member 32 away from the adjusting member 31, so that the prefabricated balcony 100 is connected to the prefabricated exterior wall 200 through the first connecting member 2 connected to the adjustable component 3 and the screw sleeve 1 respectively. Since the two ends of the adjusting member 31 are threadedly connected to the second connecting member 32 respectively, the second connecting member 32 is coaxially arranged with the adjusting member 31, and the thread directions of the two second connecting members 32 located on the opposite sides of the adjusting member 31 are opposite, so that the two second connecting members 32 can be moved toward or away from each other at the same time by rotating the adjusting member 31, which plays the role of tightening the first connecting member 2, so that the adjusting member 31 can be used to tighten and position the second connecting member 32 when the prefabricated balcony 100 is hoisted and positioned, and the prefabricated balcony 100 is not easy to deviate after positioning, which reduces the safety risk of on-site construction and avoids the horizontal deviation of the prefabricated balcony 100 caused by other construction processes before concrete pouring after the prefabricated balcony 100 is hoisted.
[0028] In the above embodiment, the first connecting member 2 includes an integrally connected screw 21 and a connecting portion 22, the screw 21 is threadedly connected to the screw sleeve 1, and since the screw sleeve 1 is pre-embedded in the prefabricated balcony 100 and the prefabricated exterior wall 200, the first connecting member 2 can be stably connected to the prefabricated balcony 100 and the prefabricated exterior wall 200. The connecting portion 22 and the second connecting member 32 are hingedly connected by a pin 4, so that the first connecting member 2 can be connected between the screw sleeve 1 and the second connecting member 32, and the connection angle between the first connecting member 2 and the second connecting member 32 can be appropriately adjusted according to the on-site conditions to adapt to prefabricated exterior walls 200 of different sizes. Specifically, the connecting portion 22 has a U-shaped groove 221, and one end of the second connecting member 32 extends into the U-shaped groove 221. The connecting portion 22 has a first through hole 222 passing through the U-shaped groove 221, and the end of the second connecting member 32 away from the adjusting member 31 has a second through hole 321, and the pin member 4 is detachably provided with the first through hole 222, the second through hole 321 and the U-shaped groove 221. Preferably, the pin member 4 includes a bolt 41 and a nut 42, one end of the screw passes through the first through hole 222, the second through hole 321 and the U-shaped groove 221, and the nut 42 is threadedly connected to the bolt 41 and abuts against the connecting portion 22, so that after the construction is completed, the adjustable component 3 and the first connecting member 2 can be detached and used in a turnover manner, thereby reducing the construction cost.
[0029] like Figure 2 and Figure 3 As shown, in this embodiment, the screw sleeve 1 embedded in the prefabricated balcony 100 is located on the left and right ends of the prefabricated balcony 100, and is vertically embedded in the left and right ends of the prefabricated balcony 100; the screw sleeve 1 embedded in the prefabricated exterior wall 200 is located on the left and right sides of the prefabricated balcony 100, and is vertically embedded in the outer side of the prefabricated exterior wall 200. Specifically, the screw sleeve 1 includes an integrally formed inner thread sleeve 11, a baffle 12 and a convex portion 13, the baffle 12 and the screw portion are respectively connected to the two ends of the inner thread sleeve 11, the inner thread sleeve 11 is threadedly connected to the first connecting member 2, the baffle 12 of the screw sleeve 1 embedded in the prefabricated balcony 100 abuts against the end surface of the prefabricated balcony 100, the inner thread sleeve 11 and the convex portion 13 of the screw sleeve 1 embedded in the prefabricated balcony 100 extend into the interior of the prefabricated balcony 100, and the convex portion 13 has threads, To improve the stability of the prefabricated balcony 100, the baffle 12 of the screw sleeve 1 embedded in the prefabricated exterior wall 200 abuts against the outer surface of the prefabricated exterior wall 200, and the inner thread sleeve 11 and the protrusion 13 of the screw sleeve 1 embedded in the prefabricated exterior wall 200 extend into the interior of the prefabricated exterior wall 200. The protrusion 13 has a thread, which improves the stability of the prefabricated exterior wall 200, thereby effectively ensuring the connection stability of the screw sleeve 1 embedded in the prefabricated balcony 100 and the prefabricated exterior wall 200.
[0030] In the above embodiment, the adjusting member 31 is preferably a closed flower basket, and a friction pattern 311 is provided on the surface of the adjusting member 31 to increase the friction force when the adjusting member 31 is rotated by a tool, thereby facilitating the rotation of the adjusting member 31 .
[0031] The installation method of the above-mentioned prefabricated balcony 100 installation fixture is as follows:
[0032] (1) When the prefabricated balcony 100 and the prefabricated exterior wall 200 are produced in the factory, the screw sleeve 1 is embedded according to the detailed design drawings. The positioning deviation during embedding should meet the design requirements. When pouring the concrete of the prefabricated component, it should be ensured that the inner thread sleeve 11 on the screw sleeve 1 is not blocked.
[0033] (2) After the prefabricated exterior wall 200 and the prefabricated balcony 100 are hoisted, the first connecting members 2 are respectively installed in the pre-buried screw sleeves 1 and tightened.
[0034] (3) The two second connecting members 32 are connected and assembled into an adjustable component 3 through the adjusting member 31. The second connecting members 32 at both ends of the adjustable component 3 are respectively connected to the first connecting member 2 through the pin members 4, and then the second connecting members 32 are tightened by rotating the adjusting member 31.
[0035] In summary, the utility model embeds the screw sleeve 1 in the prefabricated exterior wall 200 and the prefabricated balcony 100 respectively, uses one end of the first connecting member 2 to be threadedly connected to the screw sleeve 1, uses one of the second connecting members 32 on the adjustable component 3 to be hinged with the first connecting member 2 connected to the prefabricated balcony 100, and uses another second connecting member 32 on the adjustable component 3 to be hinged with the first connecting member 2 connected to the prefabricated exterior wall 200. By rotating the adjusting member 31 on the adjustable component 3, the two second connecting members 32 can be driven to move closer to or away from each other at the same time to adjust the installation positioning of the prefabricated balcony 100, and it is not easy to deviate after fixing, thereby reducing the time for precise positioning of hoisting and ensuring the positioning quality of the prefabricated balcony 100 after concrete pouring.
[0036] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated balcony installation and fixing device, used to connect the prefabricated balcony to the prefabricated exterior wall, characterized in that: The prefabricated balcony installation and fixing device includes a screw sleeve, a first connecting piece and an adjustable component. The screw sleeve is pre-buried in the prefabricated exterior wall and the prefabricated balcony. The adjustable component includes an adjusting piece and two second connecting pieces. The two ends of the adjusting piece are respectively threadedly connected to the two second connecting pieces, and the thread directions of the two second connecting pieces are opposite. One end of the first connecting piece is threadedly connected to the screw sleeve, and the other end of the first connecting piece is hinged to the end of the second connecting piece away from the adjusting piece.
2. The prefabricated balcony installation and fixing device according to claim 1, characterized in that: The first connecting member includes a screw rod and a connecting portion which are integrally connected. The screw rod is threadedly connected in the screw sleeve. The connecting portion is hinged to the second connecting member via a pin.
3. The prefabricated balcony installation and fixing device according to claim 2, characterized in that: The connecting portion has a U-shaped groove, and one end of the second connecting member extends into the U-shaped groove.
4. The prefabricated balcony installation and fixing device according to claim 3, characterized in that: The connecting part has a first through hole passing through the U-shaped groove, the second connecting member has a second through hole at one end away from the adjusting member, and the pin shaft member is detachably provided to penetrate the first through hole, the second through hole and the U-shaped groove.
5. The prefabricated balcony installation and fixing device according to claim 4, characterized in that: The pin shaft member includes a bolt and a nut, one end of the screw passes through the first through hole, the second through hole and the U-shaped groove, and the nut is threadedly connected to the bolt and abuts against the connecting portion.
6. The prefabricated balcony installation and fixing device according to claim 1, characterized in that: The screw sleeve embedded in the prefabricated balcony is located on the left and right ends of the prefabricated balcony, and is vertically embedded in the left and right ends of the prefabricated balcony; the screw sleeve embedded in the prefabricated exterior wall is located on the left and right sides of the prefabricated balcony, and is vertically embedded in the outer side of the prefabricated exterior wall.
7. The prefabricated balcony installation and fixing device according to claim 1 or 6, characterized in that: The screw sleeve includes an integrally formed inner thread sleeve, a baffle and a convex portion, the baffle and the screw portion are respectively connected to the two ends of the inner thread sleeve, the inner thread sleeve is threadedly connected to the first connecting piece, the baffle of the screw sleeve embedded in the prefabricated balcony abuts against the end surface of the prefabricated balcony, the inner thread sleeve and the convex portion of the screw sleeve embedded in the prefabricated balcony extend into the interior of the prefabricated balcony, the baffle of the screw sleeve embedded in the prefabricated exterior wall abuts against the outer side surface of the prefabricated exterior wall, and the inner thread sleeve and the convex portion of the screw sleeve embedded in the prefabricated exterior wall extend into the interior of the prefabricated exterior wall.
8. The prefabricated balcony installation fixture as claimed in claim 1, characterized in that: The adjusting member is provided with a through hole, the through hole penetrates the adjusting member along the length direction of the adjusting member, and the second connecting member extends into the through hole.
9. The prefabricated balcony installation fixture as claimed in claim 8, characterized in that: The adjusting member has friction patterns on its surface.