Staggered stacked steel structure module system
By adopting an interlaced stacked steel structure module system in module integrated buildings, the problems of low building space utilization and increased steel use in the prior art are solved, and more efficient steel structure utilization and building space optimization are achieved.
Patent Information
- Application Number
- CN202421802753.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-07-29
AI Technical Summary
In existing module integrated buildings, the bottom-up stacked module structure leads to a lower utilization rate of building space and an increase of about 30% compared to the amount of steel used in traditional steel structure buildings.
The interlaced stacked steel structure module system is adopted to realize interlaced stacking of modules through basic connection nodes, standard interlaced connection nodes and top connection nodes, reducing the amount of steel used in the structure and improving space utilization.
It is achieved while reducing the amount of steel used in the structure and improving the utilization rate of building space, ensuring the reliability of the connection of steel structure modules, the simplicity of structure and the clarity of force transmission paths, and the module system is detachable and easy to construct.
Smart Images

Figure CN222810198U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building engineering, and in particular relates to a staggered stacked steel structure module system. Background Art
[0002] Modular integrated buildings are the direction of change for the industrialization of new buildings, and are developing in the direction of continuously enriching structural systems, continuously improving integration, and continuously improving product standardization.
[0003] However, the modules in the existing modular integrated buildings are stacked from bottom to top, with the modules connected vertically through the connectors in the columns and connected horizontally through the horizontal connecting plates. This stacking method causes the modular integrated buildings to have double columns, double beams, and double plates, resulting in low building space utilization and an increase of about 30% in steel usage compared to traditional steel structure buildings. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the utility model provides a staggered stacked steel structure module system, thereby solving the technical problems that the existing modules have low building space utilization and use about 30% more steel than traditional steel structure buildings.
[0006] (II) Technical solution
[0007] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:
[0008] The utility model provides a staggered stacked steel structure module system, including several layers of module layers connected up and down, the modules in each module layer are arranged at intervals and the modules in two adjacent module layers are arranged staggered, the modules in the bottom module layer are connected to the adjacent two-dimensional bottom plate through a basic connection node, the two adjacent module layers are connected through several standard inter-layer connection nodes, and the modules in the top module layer are connected to the adjacent two-dimensional top plate through a top connection node; the basic connection node includes a first connection member and a second connection member, the first connection member is fixed to the three-dimensional bottom beam of the module, the second connection member is fixed to the steel beam of the two-dimensional bottom plate, the second connection member falls on the first connection member, a first screw rod is partially penetrated in the first connection member, the first screw rod is simultaneously penetrated in the second connection member, the first screw rod and the second screw connected to the first screw rod are penetrated from bottom to top in the second connection member, and the first screw rod is simultaneously penetrated in the first connection member; The standard inter-layer connection node includes a first connection member and a second connection member. The first connection member is fixed to the three-dimensional top beam of the module of the lower module layer, and the second connection member is fixed to the three-dimensional bottom beam of the module of the upper module layer. The second connection member falls on the first connection member. A second screw is passed through the first connection member, and the second screw is also passed through the second connection member. Two second screws connected up and down are passed through the second connection member, and the second screw located below is also passed through the first connection member; the top connection node includes a first connection member and a second connection member. The first connection member is fixed to the three-dimensional top beam of the module, and the second connection member is fixed to the steel beam of the two-dimensional top plate. The second connection member falls on the first connection member. A second screw is passed through the first connection member, and the second screw is fixed to the second connection member. The second screw and the first screw connected to the second screw are passed through the second connection member from bottom to top, and the second screw is also passed through the first connection member.
[0009] Furthermore, a foundation embedded plate is fixed underground where the bottom module layer is located through foundation anchor bars, and a two-dimensional bottom plate connected to the modules in the bottom module layer is fixed to the foundation embedded plate.
[0010] Further, the first connecting member includes a first bottom plate, a first accommodating cavity and a first anti-shear cone are fixed above the first bottom plate, the first accommodating cavity is located in the first area of the first bottom plate, the first anti-shear cone is located in the second area of the first bottom plate, a first top plate is fixed on the top of the first accommodating cavity, a second anti-shear cone is fixed above the first top plate, a first through hole penetrating the first bottom plate is provided on the first anti-shear cone, a second through hole penetrating the first top plate is provided on the second anti-shear cone, and a third through hole is provided on the first area of the first bottom plate; the second connecting member includes a second top plate, a second accommodating cavity is fixed below the second top plate, and the second accommodating cavity is located in the second In the third area of the top plate, a second bottom plate is fixed to the bottom of the second accommodating cavity, a fourth through hole is opened on the fourth area of the second top plate, a fifth through hole is opened on the second bottom plate, and a sixth through hole is opened on the third area of the second top plate, the fourth through hole is adapted to the second anti-shear cone, and the fifth through hole is adapted to the first anti-shear cone; the first connecting member and the second connecting member are arranged in pairs, and when the two are matched, the first bottom plate is located below the second top plate, the first accommodating cavity is located in the fourth area of the second top plate and the second anti-shear cone is penetrated in the fourth through hole, and the second accommodating cavity is located in the second area of the first bottom plate and the first anti-shear cone is penetrated in the fifth through hole.
[0011] Furthermore, the outer end edges of the first anti-shear cone and the second anti-shear cone are both provided with grooves, and correspondingly, the lower edges of the fourth through hole and the fifth through hole are also provided with grooves.
[0012] Furthermore, upper edges of the third through hole and the sixth through hole are both provided with grooves.
[0013] Furthermore, a first single nut is fixed under the first bottom plate in the basic connection node, and the first single nut is coaxially arranged with the first through hole. A second single nut is fixed under the first top plate, and the second single nut is coaxially arranged with the second through hole.
[0014] Furthermore, in the top connection node, a second screw rod that passes through the first connecting member and is fixed to the second connecting member is screwed with a first double nut at the upper end to fix the second screw rod, and a pad is sandwiched between the first double nut and the second shear cone; a second double nut is screwed with a second double nut at the upper end of the first screw rod that passes through the second connecting member to fix the first screw rod.
[0015] Furthermore, the first screw and the second screw are connected via a connecting sleeve, and the second screw and the second screw are connected via a connecting sleeve, and the lower end of the connecting sleeve is against the first shear cone or the second shear cone coaxially below; the inner wall of the connecting sleeve includes a threaded area and a non-threaded area, and the non-threaded area is located in the middle of the threaded area to divide the threaded area into two symmetrical parts above and below.
[0016] Furthermore, a screw guide groove inclined toward the inner hole is provided at the upper end of the connecting sleeve.
[0017] Furthermore, an anti-loosening gasket is arranged between the connecting sleeve and the first anti-shear cone or the second anti-shear cone that abuts against it; an anti-loosening gasket is arranged between the first double nut and the cushion block in the top connecting node, and an anti-loosening gasket is arranged between the second double nut and the second top plate.
[0018] (III) Beneficial effects
[0019] The beneficial effects of the utility model are:
[0020] The utility model provides a staggered stacked steel structure module system, which respectively realizes the basic connection, standard interlayer connection and top connection of the staggered stacked steel structure module system by setting a basic connection node, a standard interlayer connection node and a top connection node composed of a tensile structure mainly including a first screw and a second screw and a shear structure mainly including a first connector and a second connector in the system. Compared with the prior art, it reduces the amount of structural steel and improves the utilization rate of building space, and at the same time meets the characteristics of reliable connection, simple structure, clear force transmission path, detachable and easy construction of steel structure modules. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the basic connection node structure;
[0022] Figure 2 It is a schematic diagram of the standard inter-layer connection node structure;
[0023] Figure 3 It is a schematic diagram of the top connection node structure;
[0024] Figure 4 is a schematic diagram of the structure of the first connecting member;
[0025] Figure 5 is a schematic diagram of the structure of the second connecting member;
[0026] Figure 6 Schematic diagram of the connecting sleeve structure.
[0027] [Description of Reference Numerals]
[0028] 1: module; 101: three-dimensional top beam; 102: three-dimensional bottom beam;
[0029] 2: top connection node; 3: two-dimensional top plate; 4: standard inter-layer connection node; 5: foundation connection node; 6: two-dimensional bottom plate;
[0030] 7: first connector; 701: first bottom plate; 702: first accommodating cavity; 703: first anti-shear cone; 704: first top plate; 705: second anti-shear cone; 706: first through hole; 707: second through hole; 708: third through hole; 709: first single nut; 710: second single nut;
[0031] 8: second connecting member; 801: second top plate; 802: second accommodating cavity; 803: second bottom plate; 804: fourth through hole; 805: fifth through hole; 806: sixth through hole;
[0032] 9: first screw rod; 10: second screw rod; 11: foundation anchor bar; 12: foundation embedded plate; 13: first double nut; 14: spacer block; 15: second double nut;
[0033] 16: connecting sleeve; 1601: threaded area; 1602: non-threaded area; 1603: screw guide groove;
[0034] 17: Anti-loosening gasket. DETAILED DESCRIPTION
[0035] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0036] like Figure 1-6 As shown, the utility model provides a staggered stacked steel structure module system, including several layers of module layers connected up and down, the modules 1 in each module layer are arranged at intervals and the modules 1 in two adjacent module layers are arranged staggered, the modules 1 in the bottom module layer are connected to the adjacent two-dimensional bottom plate 6 through a foundation connection node 5, the two adjacent module layers are connected through several standard inter-layer connection nodes 4, the modules 1 in the top module layer are connected to the adjacent two-dimensional top plate 3 through a top connection node 2, wherein a foundation embedded plate 12 is fixed underground where the bottom module layer is located through foundation anchor bars 11, and the two-dimensional bottom plate 6 is fixed to the foundation embedded plate 12 so that the module system is fixed to the ground.
[0037] Specifically, Figure 1 As shown, the basic connection node 5 includes a first connection member 7 and a second connection member 8. The first connection member 7 is fixed to the three-dimensional bottom beam 102 of the module 1, and the second connection member 8 is fixed to the steel beam of the two-dimensional bottom plate 6. The second connection member 8 falls on the first connection member 7. A first screw rod 9 is partially penetrated in the first connection member 7, and the first screw rod 9 is also penetrated in the second connection member 8. The first screw rod 9 and the second screw rod 10 connected to the first screw rod 9 are penetrated in the second connection member 8 from bottom to top, and the first screw rod 9 is also penetrated in the first connection member 7.
[0038] like Figure 2As shown, the standard inter-layer connection node 4 includes a first connecting member 7 and a second connecting member 8. The first connecting member 7 is fixed to the three-dimensional top beam 101 of the module 1 of the lower module layer, and the second connecting member 8 is fixed to the three-dimensional bottom beam 102 of the module 1 of the upper module layer. The second connecting member 8 falls on the first connecting member 7. The first connecting member 7 is penetrated by a second screw rod 10, and the second screw rod 10 is also penetrated by the second connecting member 8. Two second screw rods 10 connected up and down are penetrated by the second connecting member 8, and the second screw rod 10 located at the bottom is also penetrated by the first connecting member 7.
[0039] like Figure 3 As shown, the top connection node 2 includes a first connection member 7 and a second connection member 8. The first connection member 7 is fixed to the three-dimensional top beam 101 of the module 1, and the second connection member 8 is fixed to the steel beam of the two-dimensional top plate 3. The second connection member 8 falls on the first connection member 7. A second screw 10 is passed through the first connection member 7. The upper end of the second screw 10 is screwed with a first double nut 13. A cushion block 14 is sandwiched between the first double nut 13 and the second shear cone 705, so the second screw 10 is fixed to the second connection member 8 through the first double nut 13 and the cushion block 14. The second connection member 8 is passed through from bottom to top with a second screw 10 and a first screw 9 connected to the second screw 10 through a connecting sleeve 16. The upper end of the first screw 9 is screwed with a second double nut 15. Therefore, the first screw 9 is fixed through the connecting sleeve 16 and the second double nut 15. The second screw 10 is also passed through the first connection member 7.
[0040] like Figure 4 As shown, the first connecting member 7 includes a first bottom plate 701, a first accommodating cavity 702 and a first anti-shear cone 703 are fixed above the first bottom plate 701, the first accommodating cavity 702 is located in the first zone a of the first bottom plate 701, the first anti-shear cone 703 is located in the second zone b of the first bottom plate 701, a first top plate 704 is fixed on the top of the first accommodating cavity 702, a second anti-shear cone 705 is fixed above the first top plate 704, a first through hole 706 penetrating the first bottom plate 701 is opened on the first anti-shear cone 703, a second through hole 707 penetrating the first top plate 704 is opened on the second anti-shear cone 705, and a third through hole 708 is opened on the first zone a of the first bottom plate 701.
[0041] like Figure 5As shown, the second connecting member 8 includes a second top plate 801, a second accommodating cavity 802 is fixed below the second top plate 801, the second accommodating cavity 802 is located in the third zone c of the second top plate 801, a second bottom plate 803 is fixed to the bottom of the second accommodating cavity 802, a fourth through hole 804 is opened on the fourth zone d of the second top plate 801, a fifth through hole 805 is opened on the second bottom plate 803, and a sixth through hole 806 is opened on the third zone c of the second top plate 801, the fourth through hole 804 is adapted to the second anti-shear cone 705, and the fifth through hole 805 is adapted to the first anti-shear cone 703.
[0042] like Figure 1-3 As shown, the first connecting member 7 and the second connecting member 8 are arranged in pairs. When the two are matched, the first bottom plate 701 is located below the second top plate 801, the first accommodating cavity 702 is located in the fourth zone d of the second top plate 801 and the second anti-shear cone 705 is passed through the fourth through hole 804, and the second accommodating cavity 802 is located in the second zone b of the first bottom plate 701 and the first anti-shear cone 703 is passed through the fifth through hole 805.
[0043] Preferably, if Figure 4-5 As shown, the outer edges of the first anti-shear cone 703 and the second anti-shear cone 705 are both provided with grooves, and correspondingly, the lower edges of the fourth through hole 804 and the fifth through hole 805 are also provided with grooves, and when the first connecting member 7 cooperates with the second connecting member 8, the first anti-shear cone 703 and the second anti-shear cone 705 can smoothly penetrate the fifth through hole 805 and the fourth through hole 804. At the same time, the upper edges of the third through hole 708 and the sixth through hole 806 are both provided with grooves, so that the first screw 9 or the second screw 10 can smoothly pass through the third through hole 708 and the sixth through hole 806 from top to bottom, thereby facilitating the splicing of the upper module layer on the lower module layer.
[0044] Preferably, if Figure 1 As shown, a first single nut 709 is fixed under the first bottom plate 701 in the basic connection node 5, and the first single nut 709 is coaxially arranged with the first through hole 706. A second single nut 710 is fixed under the first top plate 704, and the second single nut 710 is coaxially arranged with the second through hole 707. This can prevent the first single nut 709 and the second single nut 710 from loosening after being screwed into the first screw rod 9 by external force, thereby affecting the stability of the system.
[0045] like Figure 1-3As shown, the first screw rod 9 and the second screw rod 10 connected and the second screw rod 10 and the second screw rod 10 connected are connected by a connecting sleeve 16. The inner wall of the connecting sleeve 16 includes a threaded area 1601 and a non-threaded area 1602, and the non-threaded area 1602 is located in the middle of the threaded area 1601 to divide the threaded area 1601 into two upper and lower parts for limiting the first screw rod 9 or the second screw rod 10 in the connecting sleeve 16. Preferably, the non-threaded area 1602 is located in the middle of the threaded area 1601 to divide the threaded area 1601 into two upper and lower symmetrical parts. The lower end of the connecting sleeve 16 is against the first shear cone 703 or the second shear cone 705 coaxial below to resist the shear force on the module system.
[0046] Preferably, if Figure 1-3 , Figure 6 As shown, a screw guide groove 1603 inclined toward the inner hole is provided at the upper end of the connecting sleeve 16 so that the first screw 9 or the second screw 10 cooperating with the threaded area 1601 in the upper inner part of the connecting sleeve 16 can enter the connecting sleeve 16 more smoothly.
[0047] like Figure 1-3 As shown, anti-loosening washers 17 are arranged between the connecting sleeve 16 and the first anti-shear cone 703 or the second anti-shear cone 705 , between the first double nut 13 and the cushion block 14 in the top connecting node 2 , and between the second double nut 15 and the second top plate 801 .
[0048] It should be noted that the length of the first screw 9 is smaller than the vertical height of the first accommodating cavity 702 and the second accommodating cavity 802, and the first screw 9 only appears in the top connection node 2 and the base connection node 5. The length of the second screw 10 is larger than the vertical height of the first accommodating cavity 702 and the second accommodating cavity 802, and the second screw 10 needs to be connected with other second screws 10 or first screws 9 in sequence to penetrate all module layers in the vertical direction to resist the tension exerted on the module system.
[0049] During installation, install the bottom module layer first. Fix the two-dimensional bottom plate 6 first, and then fix the module 1 of the bottom module layer to the two-dimensional bottom plate 6 through the basic connection node 5. The splicing of the basic connection node 5 is to first fix the two first screws 9 to the first connecting member 7 and the second connecting member 8 respectively, and then screw the connecting sleeves 16 on the upper ends of the two first screws 9 respectively, and then insert the two second screws 10 from the top of the module column of the module, position them through the screw guide groove 1603 of the connecting sleeve 16, and screw them to connect with the connecting sleeve 16. The screwing length is the length of the threaded area 1601 of the connecting sleeve 16 located at the top.
[0050] Then, the middle module layer is installed, and the two adjacent module layers are connected by a number of standard inter-layer connection nodes 4. The standard inter-layer connection nodes 4 are spliced by screwing the connection sleeves 16 on the upper ends of the two second screws 10, and then the other two second screws 10 are inserted from the module column top into the screw guide groove 1603 of the connection sleeve 16 for positioning, and then screwed to connect with the connection sleeve 16. The screwing length is the length of the threaded area 1601 of the connection sleeve 16 located at the top.
[0051] Finally, install the top module layer. First install the module 1 of the top module layer, and then fix the two-dimensional top plate 3 to the module 1 of the top module layer through the top connection node 2. The splicing of the top connection node 2 is to set the cushion block 14 on the upper end of the second screw 10 inserted in the first accommodating cavity 702, and then screw the first double nut 13 to fix the second screw 10 to the second connecting member 8. Screw the upper end of the second screw 10 inserted in the second accommodating cavity 802 onto the connecting sleeve 16, and then insert the first screw 9 from the sixth through hole 806 of the second connecting member 8 including the second top plate 801 into the screw guide groove 1603 of the connecting sleeve 16 for positioning, and screw it to connect with the connecting sleeve 16. The screwing length is the length of the threaded area 1601 located above the connecting sleeve 16. Finally, screw the second double nut 15 on the upper end of the first screw 9 to fix the first screw 9.
[0052] In the description of the present utility model, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0053] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0054] In the present utility model, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.
[0055] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0056] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are illustrative and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A staggered stacked steel structure module system, characterized in that: It includes several upper and lower connected module layers, the modules in each module layer are arranged at intervals and the modules in two adjacent module layers are arranged in a staggered manner, the modules in the bottom module layer are connected to the adjacent two-dimensional bottom plate through basic connection nodes, the two adjacent module layers are connected through several standard inter-layer connection nodes, and the modules in the top module layer are connected to the adjacent two-dimensional top plate through top connection nodes; The basic connection node includes a first connection member and a second connection member, the first connection member is fixed to the three-dimensional bottom beam of the module, the second connection member is fixed to the steel beam of the two-dimensional bottom plate, the second connection member falls on the first connection member, a first screw rod is partially penetrated in the first connection member, the first screw rod is also penetrated in the second connection member, the first screw rod and the second screw rod connected to the first screw rod are penetrated in the second connection member from bottom to top, and the first screw rod is also penetrated in the first connection member; The standard inter-layer connection node includes a first connection member and a second connection member, the first connection member is fixed to the three-dimensional top beam of the module of the lower module layer, the second connection member is fixed to the three-dimensional bottom beam of the module of the upper module layer, the second connection member falls on the first connection member, a second screw rod is passed through the first connection member, the second screw rod is also passed through the second connection member, two second screw rods connected up and down are passed through the second connection member, and the second screw rod located at the bottom is also passed through the first connection member; The top connection node includes a first connection member and a second connection member. The first connection member is fixed to the three-dimensional top beam of the module, and the second connection member is fixed to the steel beam of the two-dimensional top plate. The second connection member falls on the first connection member. A second screw is passed through the first connection member, and the second screw is fixed to the second connection member. A second screw and a first screw connected to the second screw are passed through the second connection member from bottom to top, and the second screw is also passed through the first connection member.
2. The staggered stacked steel structure module system according to claim 1 is characterized in that: A foundation embedded plate is fixed underground where the bottom module layer is located through foundation anchor bars, and a two-dimensional bottom plate connected to the modules in the bottom module layer is fixed to the foundation embedded plate.
3. The staggered stacked steel structure module system according to claim 1 is characterized in that: The first connecting member includes a first bottom plate, a first accommodating cavity and a first anti-shear cone are fixed above the first bottom plate, the first accommodating cavity is located in the first area of the first bottom plate, the first anti-shear cone is located in the second area of the first bottom plate, a first top plate is fixed on the top of the first accommodating cavity, a second anti-shear cone is fixed above the first top plate, a first through hole penetrating the first bottom plate is formed on the first anti-shear cone, a second through hole penetrating the first top plate is formed on the second anti-shear cone, and a third through hole is formed on the first area of the first bottom plate; The second connecting member includes a second top plate, a second accommodating cavity is fixed below the second top plate, the second accommodating cavity is located in the third area of the second top plate, a second bottom plate is fixed to the bottom of the second accommodating cavity, a fourth through hole is opened on the fourth area of the second top plate, a fifth through hole is opened on the second bottom plate, a sixth through hole is opened on the third area of the second top plate, the fourth through hole is adapted to the second anti-shear cone, and the fifth through hole is adapted to the first anti-shear cone; The first connecting member and the second connecting member are arranged in pairs. When the two are matched, the first bottom plate is located below the second top plate, the first accommodating cavity is located in the fourth area of the second top plate and the second shear cone is passed through the fourth through hole, and the second accommodating cavity is located in the second area of the first bottom plate and the first shear cone is passed through the fifth through hole.
4. The staggered stacked steel structure module system according to claim 3 is characterized in that: The outer end edges of the first anti-shear cone and the second anti-shear cone are both provided with grooves, and correspondingly, the lower edges of the fourth through hole and the fifth through hole are also provided with grooves.
5. The staggered stacked steel structure module system according to claim 3 is characterized in that: The upper edges of the third through hole and the sixth through hole are both provided with grooves.
6. The staggered stacked steel structure module system according to claim 3 is characterized in that: A first single nut is fixed under the first bottom plate in the basic connection node, and the first single nut is coaxially arranged with the first through hole. A second single nut is fixed under the first top plate, and the second single nut is coaxially arranged with the second through hole.
7. The staggered stacked steel structure module system according to claim 3 is characterized in that: A first double nut is screwed on the upper end of a second screw rod in the top connection node, which is passed through the first connection member and fixed to the second connection member, to fix the second screw rod, and a cushion block is sandwiched between the first double nut and the second shear cone; A second double nut is screwed on the upper end of the first screw rod which passes through the second connecting member to fix the first screw rod.
8. The staggered stacked steel structure module system according to claim 7, characterized in that: The first screw rod and the second screw rod are connected via a connecting sleeve, and the second screw rod and the second screw rod are connected via a connecting sleeve, and the lower end of the connecting sleeve abuts against the first shear cone or the second shear cone coaxially located below; The inner wall of the connecting sleeve comprises a threaded area and a non-threaded area. The non-threaded area is located in the middle of the threaded area and divides the threaded area into two symmetrical parts.
9. The staggered stacked steel structure module system according to claim 8, characterized in that: The upper end of the connecting sleeve is provided with a screw guide groove inclined toward the inner hole.
10. The staggered stacked steel structure module system according to claim 8, characterized in that: An anti-loosening gasket is arranged between the connecting sleeve and the first anti-shear cone or the second anti-shear cone abutting against each other; An anti-loosening gasket is arranged between the first double nut and the cushion block in the top connection node, and an anti-loosening gasket is arranged between the second double nut and the second top plate.