Structured hoisting structure of ship

By designing a structured ship lifting structure, the existing ship handling operations are solved, the problems of complex, low efficiency and high cost are achieved, and the safety and efficiency of ship lifting are improved, and the strength and safety of the lifting structure are improved.

CN222820242UActive Publication Date: 2025-05-02GUANGDONG COSCO SHIPPING HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421528209.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2025-05-02
Estimated Expiration
2034-06-28

AI Technical Summary

Technical Problem

The existing ship handling operations are complex, limited by the site, facilities and equipment, and are difficult to operate, low efficiency, high cost and low safety.

Method used

Design a structured ship lifting structure, adopting an integrated structure, improving the strength, installation quality and safety of lifting structures, and is suitable for the overall lifting of small and medium-sized ships. The structure includes a lifting ring structural plate, a crane lifting beam and a lifting rigging. The lifting ring structural plate is integrally formed with the ship outer plate, and the strong ribs are aligned with the lifting ring structural plate to form an integral lifting structure.

Benefits of technology

It realizes the safety, efficiency, economical and practicality of ship lifting, reduces construction costs, improves the strength and safety of the lifting structure, simplifies the operation process, and improves the lifting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222820242U_ABST
    Figure CN222820242U_ABST
Patent Text Reader

Abstract

The utility model discloses a ship structured hoisting structure, which relates to the technical field of ship engineering and comprises hoisting ring structural plates symmetrically arranged at the tops of two ship outer plates. Wherein the hanging ring structural plate and the ship outer plate are integrally formed, the reinforcing ribs are aligned with the hanging ring structural plate, and the auxiliary ribs are arranged on the two sides of the reinforcing ribs. According to the ship structuralized hoisting structure, the hoisting ring structural plate and the ship outer plate are integrated, the structure is fixed, temporary arrangement is not needed, repeated use can be achieved, and the construction cost is effectively reduced. The hanging ring structural plate and the reinforcing ribs are located on the same straight line, the reinforcing ribs of the ship outer plate can be directly stressed when the ship is hoisted, and the structural strength of the ship is guaranteed. The hoisting ring structural plate, the crane hoisting beam and the hoisting rigging form a set of hoisting structure, and a ship is integrally hoisted through a land crane or an overwater floating crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ship engineering, in particular to a ship structural hoisting structure. Background Art

[0002] The process of ship construction and operation involves operations such as ship weighing, transfer, loading and unloading, landing and disembarking, and launching.

[0003] CN201810715028.1 discloses a small ship maintenance and lifting device, including a locking device and a transfer device. The locking device includes an adjustment mechanism and a lifting mechanism, and the number of the adjustment mechanisms is two groups. Each group of adjustment mechanisms includes a positioning end block, a fixing plate, a pull rod and a bidirectional cylinder. The two groups of adjustment mechanisms are fixed on both sides of the ship in a mirrored manner; the lifting mechanism includes a lifting strut and a supporting base.

[0004] In the existing ship handling operation process, a series of mechanical equipment such as barges, floating docks, cranes, launching facilities, etc. are sometimes used. The operation is relatively complicated. At the same time, it is limited by the site, facilities and equipment, and the operation is difficult, inefficient, costly and unsafe. Utility Model Content

[0005] The utility model aims to at least solve the technical problems existing in the prior art of "complex operation, limited by sites, facilities and equipment, difficult operation, low efficiency, high cost and low safety". To this end, the utility model proposes a ship structural lifting structure, which adopts an integrated structure, improves the strength of the lifting structure, improves the installation quality and safety, is reusable and has a low construction cost.

[0006] According to some embodiments of the present invention, the ship structured hoisting structure is applied to a ship, wherein the ship comprises a ship outer plate and a ship main deck, wherein the ship outer plate is arranged on both sides of the ship main deck and is provided with strong ribs and auxiliary ribs; and comprises:

[0007] A lifting ring structure plate is symmetrically arranged on the top of the two ship outer plates, and the lifting ring structure plate is arranged along the extension position of the ship outer plates;

[0008] Two groups of crane beams are provided, each of which is arranged above the outer plate of the ship;

[0009] A lifting rigging, with two ends respectively connected to the crane beam and the ring structure plate;

[0010] The lifting ring structure plate is integrally formed with the ship outer plate, the strong ribs are aligned with the lifting ring structure plate, and the auxiliary ribs are arranged on both sides of the strong ribs.

[0011] According to some embodiments of the utility model, the number of the lifting ring structure plates arranged on the outer plate of the ship on a single side is at least four groups.

[0012] According to some embodiments of the utility model, the ring structure plate adopts a steel plate structure, and the thickness of the ring structure plate is 15 mm to 25 mm.

[0013] According to some embodiments of the present invention, the spacing between the lifting ring structure plates on the two outer plates of the ship is equal to the width of the ship.

[0014] According to some embodiments of the utility model, the lifting ear portion of the lifting ring structure plate protrudes from the top end surface of the ship outer plate, and the plate-shaped portion of the lifting ring structure plate is welded to the inner wall of the ship outer plate.

[0015] According to some embodiments of the utility model, the crane beam comprises a short beam and a long beam, and different lengths of the short beam and the long beam are selected according to actual lifting environment.

[0016] According to some embodiments of the utility model, lifting parts are arranged at equal intervals on the long lifting beam and the short lifting beam, and the lifting parts adopt a pulley block structure.

[0017] According to some embodiments of the utility model, the lifting rigging includes an upper steel wire rope, a shackle and a lower steel wire rope, the number of the lower steel wire ropes matches the number of the lifting ring structure plates, the shackles are respectively connected to the upper steel wire rope and the lower steel wire rope, and the upper steel wire rope is connected to the crane beam.

[0018] According to some embodiments of the present invention, the angle between the lower steel wire rope and the horizontal plane is greater than 45°.

[0019] According to some embodiments of the ship structural lifting structure of the utility model, at least the following beneficial effects are achieved: the lifting ring structure plate is integrated with the ship outer plate, the structure is fixed, no temporary setting is required, and it can be used repeatedly, effectively reducing the construction cost. The lifting ring structure plate and the strong ribs are in the same straight line, and the strong ribs of the ship outer plate can be directly stressed during the ship lifting, thereby ensuring the structural strength of the ship. The lifting ring structure plate, the crane beam and the lifting rigging form a set of lifting structures, and the ship is hoisted as a whole by a land crane or a floating crane on the water.

[0020] The simple structural integration design is carried out for small and medium-sized ship structures. The design of integrating the lifting structure into the ship structure is adopted. Without affecting the normal operation of the ship, the ship loading method is expanded to provide a structure that can realize the overall lifting of the ship, can be used repeatedly, and has a relatively fixed structure. It is easy to use and has reliable performance, which overcomes the problems of insufficient conventional ship lifting methods and methods. The lifting structure is safe, efficient, economical and practical, and effectively ensures the safe operation of the ship itself.

[0021] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0023] Figure 1 This is the whole ship hoisting diagram of the utility model;

[0024] Figure 2 This is the starboard side view of the whole ship hoisting of the utility model;

[0025] Figure 3 This is a port side view of the whole ship hoisting of the utility model;

[0026] Figure 4 This is a side view of the whole ship lifting point arrangement of the utility model;

[0027] Figure 5 It is a front view of the utility model;

[0028] Figure 6 This is a development diagram of the outer panel of the utility model;

[0029] Figure 7 This is the node diagram of the outer plate of the utility model.

[0030] Reference numerals:

[0031] Ship 100, ship outer plate 110, ship main deck 120, strong rib 130, auxiliary rib 140,

[0032] Ring structure plate 200,

[0033] Crane beam 300, short beam 310, long beam 320,

[0034] Lifting rigging 400 , upper wire rope 410 , shackle 420 , lower wire rope 430 . DETAILED DESCRIPTION

[0035] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0036] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, top, bottom, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0037] In the description of the present utility model, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0038] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0039] Reference below Figure 1-Figure 7 The ship structural lifting structure according to the embodiment of the utility model is described.

[0040] like Figure 1-Figure 7 As shown, the ship structural lifting structure includes a lifting ring structure plate 200 and a crane beam 300 and a lifting rigging 400 for lifting the ship 100. The ship structural lifting structure of this embodiment is mainly used in the transportation and lifting of small and medium-sized ships 100, and adopts a fused structural design of the ship 100 to increase the overall structural strength of the ship 100, and avoid the lifting operation of the ship 100 repeatedly installing and lifting to affect the structural strength of the ship 100.

[0041] Specifically, the ship 100 includes a ship outer plate 110 and a ship main deck 120. The ship outer plate 110 is arranged on both sides of the ship main deck 120 and is provided with a strong rib 130 and an auxiliary rib 140. The ship 100 can be hoisted and transferred as a whole by a land crane or a floating crane in waters. When the ship 100 is built, the hoisting structure is arranged in advance to facilitate the hoisting and transfer of the ship 100 as a whole according to actual needs after construction.

[0042] The ship structural lifting structure of this embodiment includes a ring structure plate 200, a crane beam 300 and a lifting rigging 400. Specifically, the ring structure plate 200 is symmetrically arranged on the top of the two ship outer plates 110, and the ring structure plate 200 is arranged along the extension position of the ship outer plate 110. The ratio of the spacing between the ring structure plates 200 at the front and rear ends of the ship outer plate 110 on the same side to the length of the ship 100 is ≥0.5. That is, the front and rear distance of the ring structure plate 200 is L, and the design length of the L value is not less than half of the length of the ship 100, ensuring that the center of gravity of the crane beam 300 during the lifting process of the ship 100 is kept within a reasonable range. The same number of ring structure plates 200 are arranged on the ship outer plate 110 on each side of the ship 100, and the arrangement positions are symmetrical.

[0043] Two groups of crane beams 300 are provided, which are respectively arranged above the ship outer plate 110. A lifting rigging 400 is arranged below the crane beams 300. The two ends of the lifting rigging 400 are respectively connected to the crane beams 300 and the eye structure plate 200.

[0044] The ring structure plate 200 is integrally formed with the ship outer plate 110, the strong ribs 130 are aligned with the ring structure plate 200, and the auxiliary ribs 140 are arranged on both sides of the strong ribs 130. That is, the ship outer plate 110 and the ring structure plate 200 of the ship 100 are welded or fused to form a whole during the construction process, forming the overall structure of the ship 100 hoisting.

[0045] The ring structure plate 200 is integrated with the ship outer plate 110, and the structure is fixed, and no temporary setting is required. It can be used repeatedly, which effectively reduces the construction cost. The ring structure plate 200 and the strong ribs 130 are in the same straight line, and the strong ribs 130 of the ship outer plate 110 can be directly stressed when the ship 100 is hoisted, thereby ensuring the structural strength of the ship 100. The ring structure plate 200, the crane beam 300 and the lifting rigging 400 form a set of hoisting structures, and the ship 100 is hoisted as a whole by a land crane or a floating crane on water.

[0046] This embodiment performs a simple structural integration design on the structure of the small and medium-sized ship 100, adopts a design in which the hoisting structure is integrated into the structure of the ship 100, and expands the shipping method of the ship 100 without affecting the normal operation of the ship 100, providing a structure that can realize the overall hoisting of the ship 100, can be used repeatedly, and has a safe and relatively fixed structure. It is easy to use and has reliable performance, overcoming the problems of insufficient hoisting methods and methods of conventional ships 100, and the hoisting structure is safe, efficient, economical and practical, effectively ensuring the safe operation of the ship 100 itself.

[0047] In some embodiments of the present invention, Figure 1-Figure 3 As shown, the number of the ring structure plates 200 provided on the single-side ship outer plate 110 is at least four groups.

[0048] Specifically, when hoisting the ship 100, the ring structure plates 200 are evenly arranged on both sides of the ship 100, that is, on the ship outer plate 110. This achieves the function of balancing the center of gravity of the ship during hoisting and meets the requirement of stable hoisting. The design quantity of the ring structure plates 200 is set according to the weight of the ship 100.

[0049] In some embodiments of the present invention, Figure 7 As shown, the ring structure plate 200 adopts a steel plate structure, and the thickness of the ring structure plate 200 is 15 mm to 25 mm.

[0050] Specifically, the thickness of the ring structure plate 200 can be determined according to the structural specifications of the classification society. The length and width of the ring structure plate 200 are b and h respectively, and the b value is generally the distance between two auxiliary ribs 140, and the h value is approximately equal to the b value, so that the ring structure plate 200 is a square structure as a whole, and the lifting ear of the ring structure plate 200 is on the same straight line as the strong rib 130. The size of the lifting hole of the lifting ear is selected to match the size and specifications of the lifting components.

[0051] In some embodiments of the present invention, Figure 5-Figure 7 As shown, the spacing between the ring structure plates 200 on the two ship outer plates 110 is equal to the width of the ship 100 .

[0052] Specifically, the ring structure plate 200 is arranged at the structural extension position of the ship outer plate 110 on both sides of the ship main deck 120, and the distance between the ship outer plates 110 on both sides is the width value of the ship 100.

[0053] In some embodiments of the present invention, Figure 5-Figure 7 As shown, the lifting ear portion of the lifting ring structure plate 200 protrudes from the top end surface of the ship outer plate 110 , and the plate-shaped portion of the lifting ring structure plate 200 is welded to the inner wall of the ship outer plate 110 .

[0054] Specifically, the shape of the plate-like portion of the ring structure plate 200 is adjusted according to different connection positions with the ship outer plate 110, and its shape can be a square or a long plate. The ring structure plate 200 and the ship outer plate 110 adopt an integral fusion structural design, which is not easy to cause deformation during the hoisting of the ship 100, and it is easy to meet the installation and construction requirements of the ship 100 structure, thereby improving the installation quality.

[0055] In some embodiments of the present invention, Figure 1-Figure 3 As shown, the crane beam 300 includes a short beam 310 and a long beam 320 , and the short beam 310 and the long beam 320 are selected to have different lengths according to the actual lifting environment.

[0056] Specifically, the selection of the short beam 310 and the long beam 320 is determined according to the actual configuration of each crane, that is, they can be all short beams 310 or all long beams 320. During hoisting, the short beam 310 and the long beam 320 are respectively arranged at corresponding positions on the left and right sides of the ship 100.

[0057] In a further embodiment, Figure 1-Figure 3 As shown, lifting parts are arranged at equal intervals on the long lifting beam 320 and the short lifting beam 310, and the lifting parts adopt a pulley block structure.

[0058] Specifically, pulley block structures are provided at both ends of the short lifting beam 310 , and pulley block structures are provided at the middle and both ends of the long lifting beam 320 . In the actual lifting process, pulley block structures at different positions are selected according to the specifications of the ship 100 .

[0059] In some embodiments of the present invention, Figure 1-Figure 3 As shown, the lifting rigging 400 includes an upper steel wire rope 410 , a shackle 420 and a lower steel wire rope 430 . The number of the lower steel wire ropes 430 matches the number of the eye structure plates 200 . The shackle 420 connects the upper steel wire rope 410 and the lower steel wire rope 430 respectively. The upper steel wire rope 410 is connected to the crane beam 300 .

[0060] Specifically, the number of the lifting ring structure plates 200 arranged on the same side ship outer plate 110 is an even number, the lower steel wire rope 430 of each two groups of lifting ring structure plates 200 is connected to a shackle 420, the shackle 420 is connected to an upper steel wire rope 410, and each two groups of upper steel wire ropes 410 are connected to a lifting position of the crane beam 300.

[0061] In a further embodiment, Figure 1-Figure 3 As shown, the angle between the lower wire rope 430 and the horizontal plane is greater than 45°. Specifically, in order to reduce the horizontal force of the lower wire rope 430, the angle between the lower wire rope 430 and the horizontal plane is kept greater than 45° during the hoisting process to improve the hoisting efficiency and stability.

[0062] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0063] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A ship structural hoisting structure, applied to a ship (100), wherein the ship (100) comprises a ship outer plate (110) and a ship main deck (120), wherein the ship outer plate (110) is arranged on both sides of the ship main deck (120) and is provided with strong ribs (130) and auxiliary ribs (140); characterized in that: include: A lifting ring structure plate (200) is symmetrically arranged on the top of the two ship outer plates (110), and the lifting ring structure plate (200) is arranged along the extension position of the ship outer plates (110); Two groups of crane beams (300) are provided, and are respectively arranged above the outer plate (110) of the ship; A lifting rigging (400), the two ends of which are respectively connected to the crane beam (300) and the lifting ring structure plate (200); The lifting ring structure plate (200) and the ship outer plate (110) are integrally formed, the strong ribs (130) are aligned with the lifting ring structure plate (200), and the auxiliary ribs (140) are arranged on both sides of the strong ribs (130).

2. The ship structured hoisting structure according to claim 1, characterized in that: The number of the lifting ring structure plates (200) arranged on a single side of the ship outer plate (110) is at least four groups.

3. The ship structured hoisting structure according to claim 1, characterized in that: The lifting ring structure plate (200) adopts a steel plate structure, and the thickness of the lifting ring structure plate (200) is 15 mm to 25 mm.

4. The ship structured hoisting structure according to claim 1, characterized in that: The spacing between the lifting ring structure plates (200) on the two ship outer plates (110) is equal to the width of the ship (100).

5. The ship structured hoisting structure according to claim 1, characterized in that: The lifting ear portion of the lifting ring structure plate (200) protrudes from the top end surface of the ship outer plate (110), and the plate-shaped portion of the lifting ring structure plate (200) is welded to the inner wall of the ship outer plate (110).

6. The ship structure lifting structure according to any one of claims 1 to 5, characterized in that: The crane beam (300) comprises a short beam (310) and a long beam (320), and the short beam (310) and the long beam (320) are selected to have different lengths according to actual lifting environment.

7. The ship structure hoisting structure according to claim 6, characterized in that: Lifting parts are arranged at equal intervals on the long lifting beam (320) and the short lifting beam (310), and the lifting parts adopt a pulley block structure.

8. The ship structure hoisting structure according to any one of claims 1 to 5, characterized in that: The lifting rigging (400) comprises an upper steel wire rope (410), a shackle (420) and a lower steel wire rope (430), the number of the lower steel wire ropes (430) matches the number of the eye structure plates (200), the shackle (420) respectively connects the upper steel wire rope (410) and the lower steel wire rope (430), and the upper steel wire rope (410) is connected to the crane beam (300).

9. The ship structure hoisting structure according to claim 8, characterized in that: The angle between the lower steel wire rope (430) and the horizontal plane is greater than 45°.