Flood control river levee structure at riverway corner

By designing the impact guard and diversion buffer area at the bend of the river, and combining the reinforcement anchor rod, reduction guard baffle and automatic adaptation of the water level, the problem of easy washing and damage at the bend of the river embankment is solved, and the efficient flood resistance and adaptability of the river embankment is achieved.

CN222822165UActive Publication Date: 2025-05-02黑龙江省大庆地区防洪工程管理中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421813186.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2025-05-02
Estimated Expiration
2034-07-29

AI Technical Summary

Technical Problem

The river bank at the bend of the river is easily washed away and damaged when facing floods, resulting in river bank erosion and flooding.

Method used

A flood-proof river embankment structure at the bend of the river channel is designed, including setting up an impact protection body and a diversion buffer area on the inside of the main body of the concave bank embankment, and enhancing the impact resistance and adaptability of the river embankment through reinforcement of anchor rods, speed-reduction protection baffles, wave removal blocks and automatic adaptation to the water level.

Benefits of technology

Effectively slow down the water flow speed, reduce the impact of the water flow on the river bank, prevent river bank erosion, and automatically adapt to water level changes, improve flood control capabilities, and avoid flooding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222822165U_ABST
    Figure CN222822165U_ABST
Patent Text Reader

Abstract

The utility model discloses a flood control river levee structure at a river course corner, and relates to the technical field of water conservancy facilities. An impact protection body is arranged at the position of the inner side wall of the concave bank river levee body, a speed reduction protection baffle is arranged on the inner side wall of the impact protection body, a flow dividing buffering area is arranged on the inner side of the concave bank river levee body, and a plurality of flow dividing openings are formed in the side wall of the impact protection body and communicate with the flow dividing buffering area. And through the design of the flow dividing buffer area, water flow can be divided, and the water flow pressure borne by the position of the impact protection body is relieved. The speed reducing baffle and the wave absorbing block are matched with the speed reducing protection baffle on the impact protection body, so that the water flow speed at the concave bank position is effectively reduced, and the impact of the water flow on the river bank is greatly reduced; through the design of the communicating box, the communicating pipeline, the sliding floating plate and the lifting baffle, the flood control river levee structure can automatically adapt to the change of the water level, the river levee is heightened in the flood period, and flood abuse and disaster formation can be effectively prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy facilities, in particular to a flood control embankment structure at a river bend. Background Art

[0002] In the field of water conservancy, when a river bends, the river bank at the bend is the most severely eroded by the river. When the river bends in urban areas or towns, once a natural disaster such as a sudden rainstorm occurs, the water volume of the river will increase dramatically, which can easily overflow the river bank and threaten the lives and property of residents living near the river.

[0003] The existing river embankment structure at the river bend is generally reinforced with a concrete protective layer to protect the concave bank embankment. However, since the existing protective structure is relatively simple, the protective structure is severely damaged when the water flows at a fast speed at the concave bank for a long time, thereby affecting the service life of the protective structure.

[0004] Therefore, the present application proposes a flood control embankment structure at a river bend to solve the above-mentioned problem. Utility Model Content

[0005] The utility model aims to provide a flood control embankment structure at a river bend, which solves the technical problems raised in the background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a flood control embankment structure at a river bend, comprising a concave bank embankment main body, an impact protection body is arranged at the inner wall position of the concave bank embankment main body, the lower end of the impact protection body extends to below the riverbed silt, a plurality of deceleration protection baffles are fixedly connected to the inner wall of the impact protection body, a reinforcement anchor rod is arranged at one end of the impact protection body close to the concave bank embankment main body, the end of the reinforcement anchor rod away from the concave bank embankment main body extends to the inside of the concave bank embankment main body, a diversion buffer area is arranged on the inner side of the concave bank embankment main body, a plurality of diversion ports are opened on the side wall of the impact protection body, the diversion ports are connected to the diversion buffer area, and a top guide plate is fixedly connected to the upper end of the impact protection body.

[0007] Preferably, the impact protection body and the deceleration protection baffle are both made of concrete material, and the reinforcement anchor rod and the concave bank embankment body are reinforced by pouring concrete.

[0008] Preferably, a slow-setting soil protective layer is provided on the inner side wall of the diversion buffer area, a plurality of deceleration baffles are provided inside the diversion buffer area, and a plurality of water holes are provided on the deceleration baffles.

[0009] Preferably, a plurality of wave-breaking blocks are arranged in the diversion buffer area.

[0010] Preferably, a connecting box is provided in the concave bank embankment body, and a plurality of connecting pipes are fixedly connected to the side wall of the connecting box, and the connecting pipes are connected to the diversion buffer area on the side away from the connecting box, and a sliding float is slidably connected in the connecting box, and a lifting baffle is fixedly connected to the upper end of the sliding float, and the upper end of the lifting baffle passes through the upper side wall of the connecting box, the concave bank embankment body and the impact protection body, and extends to the top of the impact protection body.

[0011] Preferably, the deceleration protection baffle is arc-shaped, and the opening direction of the deceleration protection baffle is opposite to the water flow direction.

[0012] Compared with the related art, the flood control embankment structure at the river bend provided by the utility model has the following beneficial effects:

[0013] 1. The utility model provides a flood control embankment structure at the bend of the river. In this scheme, an impact protection body is arranged on the inner side of the concave bank embankment body, and a diversion buffer area is arranged on the inner wall of the concave bank embankment body. The diversion buffer area and the impact protection body are connected through a diversion port. The design of the diversion buffer area can divert the water flow and reduce the water flow pressure at the impact protection body. At the same time, the deceleration baffle and the wave-breaking block cooperate with the deceleration protection baffle on the impact protection body, so as to effectively slow down the water flow speed at the concave bank position, greatly reduce the impact of the water flow on the embankment, thereby effectively preventing the erosion of the river bank and ensuring that the device can better face the impact of floods on the embankment.

[0014] 2. The utility model provides a flood control embankment structure at the bend of the river channel. A top guide plate is arranged at the upper end of the impact protection body. By setting the arc-shaped top guide plate, the water impacting the upper embankment can be redirected into the river, reducing the scouring effect of the water flow on the embankment. Through the design of the connecting box, connecting pipe, sliding floating plate and lifting baffle, the flood control embankment structure can automatically adapt to the change of water level. When the water level rises, the sliding floating plate rises with the water level, driving the lifting baffle to rise, thereby realizing the heightening of the embankment, which can effectively prevent floods from spreading. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 It is a cross-sectional three-dimensional structural schematic diagram of the utility model;

[0017] Figure 3 for Figure 2 A partial enlarged view of the middle part;

[0018] Figure 4 It is a schematic diagram of the three-dimensional structure of the impact protection body of the utility model;

[0019] Figure 5 for Figure 4 A partial enlarged view of point B in the middle;

[0020] Figure 6 This is a schematic diagram showing the structure of the diversion buffer area of ​​the utility model;

[0021] Figure 7 It is a schematic diagram of the cross-sectional three-dimensional structure of the diversion buffer area of ​​the utility model;

[0022] Figure 8 for Figure 7 A partial enlarged view of point C in the middle.

[0023] In the figure: 1. Concave bank embankment body; 2. Impact protection body; 3. Reinforced anchor rod; 4. Speed ​​reduction protection baffle; 5. Top guide plate; 6. Diversion buffer area; 7. Speed ​​reduction baffle; 8. Wave-breaking block; 9. Diversion port; 10. Connecting box; 11. Sliding float; 12. Lifting baffle; 13. Connecting pipe. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-8The utility model provides a technical solution: a flood control embankment structure at a river bend, comprising a concave bank embankment main body 1, an impact protection body 2 is arranged at the inner wall of the concave bank embankment main body 1, the lower end of the impact protection body 2 extends below the riverbed silt, to ensure the stability of the impact protection body 2, enhance the embankment's resistance to water flow impact, and effectively prevent the erosion of the river bank, a plurality of deceleration protection baffles 4 are fixedly connected to the inner wall of the impact protection body 2, a reinforcement anchor rod 3 is arranged at one end of the impact protection body 2 close to the concave bank embankment main body 1, and the reinforcement anchor rod 3 extends to the inside of the concave bank embankment main body 1 at one end away from the concave bank embankment main body 1, and the concave bank embankment main body 1 is provided with a reinforcement anchor rod 3. A diversion buffer area 6 is provided on the inner side of the main body 1 of the river bank, and a plurality of diversion ports 9 are provided on the side wall of the impact protection body 2, which are connected to the diversion buffer area 6. When the water flow reaches the turning position of the river bank, the water flow can be diverted by the design of the diversion buffer area 6, thereby reducing the water flow pressure on the impact protection body 2. A top guide plate 5 is fixedly connected to the upper end of the impact protection body 2, and the top guide plate 5 is arc-shaped. The upper end of the top guide plate 5 extends toward the center of the river. By setting the arc-shaped top guide plate 5, the water impacting the upper part of the river bank can be redirected into the river, thereby reducing the scouring effect of the water flow on the river bank.

[0026] The impact protection body 2 and the deceleration protection baffle 4 are both made of concrete material. The reinforcement anchor rod 3 and the concave bank embankment body 1 are reinforced by pouring concrete. The impact protection body 2 and the concave bank embankment body 1 are tightly connected by the reinforcement anchor rod 3 to prevent the impact protection body 2 from slipping.

[0027] A slow-setting soil protective layer is arranged on the inner wall of the diversion buffer area 6, and a plurality of deceleration baffles 7 are arranged on the inner side of the diversion buffer area 6, and a plurality of water holes are arranged on the deceleration baffles 7; a plurality of wave-breaking blocks 8 are arranged in the diversion buffer area 6, and the deceleration baffles 7 and the wave-breaking blocks 8 are used to buffer the water flow diverted into the diversion buffer area 6, reduce the speed of the water flow, and achieve the purpose of reducing the impact of the water flow on the river bank;

[0028] A connecting box 10 is provided in the concave bank embankment body 1, and a number of connecting pipes 13 are fixedly connected to the side wall of the connecting box 10. The connecting pipe 13 is connected to the diversion buffer area 6 on the side away from the connecting box 10. A sliding float 11 is slidably connected in the connecting box 10, and a lifting baffle 12 is fixedly connected to the upper end of the sliding float 11. The upper end of the lifting baffle 12 passes through the upper side wall of the connecting box 10, the concave bank embankment body 1 and the impact protection body 2, and extends to the top of the impact protection body 2. Through the design of the connecting box 10, the connecting pipe 13, the sliding float 11 and the lifting baffle 12, the flood control embankment structure can automatically adapt to the change of water level. When the water level rises, the sliding float 11 rises with the water level, driving the lifting baffle 12 to rise, thereby realizing the heightening of the river embankment, which can effectively prevent floods from spreading;

[0029] The deceleration protection baffle 4 is arc-shaped, and the opening direction of the deceleration protection baffle 4 is opposite to the direction of the water flow. The purpose of slowing down the speed of the water flow is achieved by utilizing the collision between the deceleration protection baffle 4 and the water flow.

[0030] Working principle: In this device, an impact protection body 2 is arranged inside the concave bank river bank body 1, and a diversion buffer area 6 is arranged on the inner wall of the concave bank river bank body 1. The diversion buffer area 6 and the impact protection body 2 are connected through a diversion port 9. The design of the diversion buffer area 6 can divert the water flow and reduce the water flow pressure at the impact protection body 2. At the same time, the deceleration baffle 7 and the wave-breaking block 8 cooperate with the deceleration protection baffle 4 on the impact protection body 2, thereby effectively slowing down the water flow speed at the concave bank position, greatly reducing the impact of the water flow on the river bank, thereby effectively preventing the erosion of the river bank, and ensuring that the device can better face the impact of floods on the river bank. A top guide plate 5 is arranged at the upper end of the impact protection body 2. By setting the arc-shaped top guide plate 5, the water above the upper river bank can be redirected to the river, reducing the scouring effect of the water flow on the river bank; through the design of the connecting box 10, the connecting pipe 13, the sliding floating plate 11 and the lifting baffle 12, the flood control river bank structure can automatically adapt to the change of water level. When the water level rises, the sliding floating plate 11 rises with the water level, driving the lifting baffle plate 12 to rise, thereby raising the river bank and effectively preventing floods from causing disasters.

Claims

1. A flood control embankment structure at a river bend, comprising a concave bank embankment body (1), characterized in that: An impact protection body (2) is arranged at the inner wall of the concave bank embankment body (1), the lower end of the impact protection body (2) extends below the riverbed silt, a plurality of deceleration protection baffles (4) are fixedly connected to the inner wall of the impact protection body (2), a reinforcing anchor rod (3) is arranged at one end of the impact protection body (2) close to the concave bank embankment body (1), the end of the reinforcing anchor rod (3) away from the concave bank embankment body (1) extends to the inside of the concave bank embankment body (1), a diversion buffer area (6) is arranged on the inner side of the concave bank embankment body (1), a plurality of diversion ports (9) are opened on the side wall of the impact protection body (2), the diversion ports (9) are connected to the diversion buffer area (6), and a top guide plate (5) is fixedly connected to the upper end of the impact protection body (2).

2. A flood control embankment structure at a river bend according to claim 1, characterized in that: The impact protection body (2) and the deceleration protection baffle (4) are both made of concrete material, and the reinforcement anchor rod (3) and the concave bank embankment body (1) are reinforced by pouring concrete.

3. The flood control embankment structure at a river bend according to claim 1, characterized in that: A slow-setting soil protective layer is provided on the inner wall of the diversion buffer area (6), a plurality of deceleration baffles (7) are provided inside the diversion buffer area (6), and a plurality of water holes are provided on the deceleration baffles (7).

4. A flood control embankment structure at a river bend according to claim 3, characterized in that: A plurality of wave-breaking blocks (8) are arranged in the diversion buffer area (6).

5. The flood control embankment structure at a river bend according to claim 1, characterized in that: A connecting box (10) is arranged in the concave bank embankment body (1), and a plurality of connecting pipes (13) are fixedly connected to the side wall of the connecting box (10). The connecting pipes (13) are connected to the diversion buffer area (6) at the side away from the connecting box (10). A sliding float (11) is slidably connected in the connecting box (10), and a lifting baffle (12) is fixedly connected to the upper end of the sliding float (11). The upper end of the lifting baffle (12) passes through the upper side wall of the connecting box (10), the concave bank embankment body (1) and the impact protection body (2), and extends to the top of the impact protection body (2).

6. The flood control embankment structure at a river bend according to claim 1, characterized in that: The deceleration protection baffle (4) is arc-shaped, and the opening direction of the deceleration protection baffle (4) is opposite to the direction of water flow.