Waterproof structure for joint of basement bottom plate and side wall
By setting up a multi-layer waterproof structure at the connection between the basement base and the side wall, and using the top pressure technology of the pressing plate and hemispherical block, the problem of insufficient continuity and stability of the waterproof layer in the prior art is solved, and efficient long-term waterproofing effect is achieved.
Patent Information
- Application Number
- CN202421809513.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-07-29
AI Technical Summary
The prior art is difficult to ensure the continuity and stability of the waterproof layer at the connection between the basement basement floor and the side wall, resulting in water seepage and water leakage, and the long-term waterproofing effect is not ideal.
A waterproof structure including a first waterproof coil material, a second waterproof coil material and a first waterproof layer is adopted, and the connection strength and fit reliability of the waterproof coil material are improved by the top pressure of the pressing plate and the hemispherical block.
Through the setting of multi-layer waterproof structures and top pressure technology, the waterproof performance at the connection between the basement floor and the side wall is significantly improved, ensuring long-term waterproofing effect, and reducing the need for later rework.
Smart Images

Figure CN222834966U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of green building waterproofing, in particular to a waterproof structure at the connection between a basement floor and a side wall. Background Art
[0002] Green buildings, during their entire life cycle, save resources, protect the environment, reduce pollution, provide people with healthy, applicable, and efficient use of space, and maximize the realization of high-quality buildings that are in harmony with nature. At present, during the construction of basements in green buildings, the connection between the floor and the side wall is a weak link in waterproofing. People usually use the method of adding waterproof membranes or applying waterproof coatings at the connection between the floor and the side wall to strengthen waterproofing.
[0003] The above traditional waterproofing methods are difficult to ensure the continuity and stability of the waterproof layer when constructing the connection between the basement floor and the side wall. For example, the connection between adjacent waterproof membranes may cause seepage and leakage due to loose adhesion. At the same time, due to the limitations of materials and construction methods, the long-term waterproofing effect is often not ideal. Utility Model Content
[0004] The utility model provides a waterproof structure for the connection between the basement floor and the side wall. The specific technical scheme is as follows:
[0005] A waterproof structure for the connection between a basement floor and a side wall comprises a floor, a side wall cast on the top of the floor, and a waterproof mechanism arranged between the floor and the water-facing surface of the side wall, the waterproof mechanism comprising a first waterproof roll fixedly arranged on the top of the floor, and a second waterproof roll fixedly arranged on the water-facing surface of the side wall, the top end of the first waterproof roll extending to the water-facing surface of the side wall, the bottom end of the second waterproof roll extending to the top of the first waterproof roll of the floor, a pressure plate is provided at the connection between the floor and the side wall, and a plurality of hemispherical blocks are fixedly provided on the outer wall of the pressure plate for improving the connection strength of the first waterproof roll and the second waterproof roll by top pressure.
[0006] By adopting the above technical solution, the first waterproof membrane and the second waterproof membrane can be more firmly attached through the top pressure of the pressing plate and the hemispherical block, thereby ensuring the continuity and stability of the waterproof structure such as the waterproof membrane.
[0007] Optionally, a construction joint is formed at the bottom end of the side wall, and a waterstop is provided inside the side wall for stopping water from the construction joint. A first waterproof layer is fixed between the bottom plate, the side wall and the outer wall of the waterproof mechanism, and the pressure plate and several of the hemispherical blocks are located inside the first waterproof layer.
[0008] By adopting the above technical solution, the first waterproof layer can be formed by the solidification of the waterproof mortar after pouring to further waterproof the connection between the bottom plate and the side wall, and the first waterproof layer formed after solidification will fix the pressure plate and the hemispherical block.
[0009] Optionally, a permanent protective wall is fixedly provided on the water-facing surface of the first waterproof layer of the base plate, a temporary protective wall is fixedly provided on the top of the first waterproof layer on one side close to the permanent protective wall, a fine stone concrete protective layer is fixedly provided between the top of the first waterproof layer of the base plate and the temporary protective wall, and a second waterproof layer is fixedly provided between the water-facing surface of the first waterproof layer of the side wall and the top of the fine stone concrete protective layer.
[0010] By adopting the above technical solution, the permanent protection wall and the temporary protection wall can provide certain protection for the water-facing surface of the basement floor, making it difficult for water to seep in and leak into the floor.
[0011] Optionally, a concrete base layer is fixedly provided between the bottom of the first waterproof layer of the base plate and the bottom of the permanent protective wall, and a cushion layer is fixedly provided at the bottom of the concrete base layer.
[0012] By adopting the above technical solution, the cushion layer can be a soil layer of the foundation, and the concrete base layer formed by pouring can stably support structures such as the bottom plate on the cushion layer.
[0013] In summary, the present invention has at least one of the following beneficial effects:
[0014] 1. Through the setting of multiple waterproof structures such as the first waterproof membrane, the second waterproof membrane and the first waterproof layer, the waterproof performance of the connection between the basement floor and the side wall can be improved, the long-term waterproof effect is good, and the probability of using mechanical equipment for repair due to leakage in the later period is reduced. It is energy-saving and convenient, and the first waterproof membrane and the second waterproof membrane can be more firmly attached through the top pressure of the pressure plate and the hemispherical block, thereby ensuring the continuity and stability of waterproof structures such as waterproof membranes.
[0015] 2. The construction joint can be waterproofed by the waterstop, so that the outer surface of the hemispherical block is an arc surface, which can reduce the contact area between itself and the first waterproof membrane and other waterproof mechanisms, which can not only increase the top pressure on the waterproof mechanism, but also not easily damage the first waterproof membrane and other waterproof mechanisms, which is convenient and practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 The utility model Figure 1 An enlarged view of the structure of the connection between the first waterproof membrane and the second waterproof membrane.
[0018] Explanation of the reference numerals in the drawings: 1. Bottom plate; 11. Side wall; 12. Construction joint; 13. Waterstop; 2. First waterproof membrane; 21. Second waterproof membrane; 22. First waterproof layer; 23. Pressure plate; 24. Hemispherical block; 3. Permanent protective wall; 31. Temporary protective wall; 32. Fine stone concrete protective layer; 33. Second waterproof layer; 4. Concrete base; 5. Cushion layer. DETAILED DESCRIPTION
[0019] The following is combined with Figure 1-2 The utility model is described in further detail.
[0020] The utility model embodiment discloses a waterproof structure at the connection between the basement floor and the side wall, referring to Figure 1 , including a bottom plate 1, a side wall 11 cast on the top of the bottom plate 1, and a waterproof mechanism arranged between the bottom plate 1 and the water-facing surface of the side wall 11. The bottom plate 1 and the side wall 11 are the basement bottom plate and side wall of the green building respectively. The waterproof mechanism can waterproof the connection between the bottom plate 1 and the water-facing surface of the side wall 11. Figure 1 The area pointed by the middle arrow is the water-facing surface.
[0021] Reference Figure 1 A construction joint 12 is formed at the bottom end of the side wall 11, and a waterstop 13 for water-stopping the construction joint 12 is arranged inside the side wall 11. The side wall 11 is cast in sections due to existing design requirements or construction needs, and the construction joint 12 is a joint formed between the concrete cast first and the concrete cast later. The upper and lower ends of the waterstop 13 are bent and tilted toward the outside, which can effectively block the water penetrating inward. This is a public technology that can stop and waterproof the construction joint 12. The waterstop 13 is pre-buried in the construction joint 12 of the side wall 11 during the building casting construction.
[0022] Reference Figure 1-2 The waterproof mechanism includes a first waterproof roll material 2 fixed on the top of the bottom plate 1, and a second waterproof roll material 21 fixed on the water-facing surface of the side wall 11. The top end of the first waterproof roll material 2 extends to the water-facing surface of the side wall 11, and the bottom end of the second waterproof roll material 21 extends to the top of the first waterproof roll material 2 of the bottom plate 1, so that the first waterproof roll material 2 can initially cover the connection between the bottom plate 1 and the side wall 11, and the second waterproof roll material 21 can cover the connection between the bottom plate 1 and the side wall 11 again, thereby doubly waterproofing the connection between the bottom plate 1 and the side wall 11.
[0023] Reference Figure 1-2A pressure plate 23 is provided at the connection between the bottom plate 1 and the side wall 11, and a plurality of hemispherical blocks 24 are fixedly provided on the outer wall of the pressure plate 23 for improving the connection strength between the first waterproof membrane 2 and the second waterproof membrane 21 by top pressure. The pressure plate 23 can be squeezed by an external heavy object, and the connection between the first waterproof membrane 2 and the second waterproof membrane 21 is pressed by the plurality of hemispherical blocks 24 to improve the connection strength and the reliability of the fit between the first waterproof membrane 2 and the second waterproof membrane 21, thereby ensuring the continuity and stability of the waterproof mechanism composed of the first waterproof membrane 2 and the second waterproof membrane 21.
[0024] Reference Figure 1-2 A first waterproof layer 22 is fixedly provided between the bottom plate 1, the side wall 11 and the outer wall of the waterproof mechanism, and a pressing plate 23 and a plurality of hemispherical blocks 24 are located inside the first waterproof layer 22. The first waterproof layer 22 can be formed by solidifying the waterproof mortar after pouring to further waterproof the connection between the bottom plate 1 and the side wall 11, and the first waterproof layer 22 formed after solidification will fix the pressing plate 23 and the hemispherical blocks 24. When the first waterproof layer 22 solidifies, the external heavy objects that squeeze the pressing plate 23 can be removed, and the holes formed on the first waterproof layer 22 after the removal can be filled with waterproof mortar.
[0025] Reference Figure 1 A permanent protective wall 3 is fixedly arranged on the water-facing surface of the first waterproof layer 22 of the base plate 1, and a temporary protective wall 31 is fixedly arranged on the top of one side of the first waterproof layer 22 close to the permanent protective wall 3. The permanent protective wall 3 and the temporary protective wall 31 can provide certain protection for the water-facing surface of the basement base plate 1, so that the base plate 1 is not prone to water seepage and leakage.
[0026] Reference Figure 1 A fine stone concrete protective layer 32 is fixedly provided between the top of the first waterproof layer 22 of the bottom plate 1 and the temporary protective wall 31 , and the fine stone concrete protective layer 32 can cover and protect the first waterproof layer 22 of the bottom plate 1 .
[0027] Reference Figure 1 A second waterproof layer 33 is fixedly arranged between the water-facing surface of the first waterproof layer 22 of the side wall 11 and the top of the fine stone concrete protective layer 32 . The second waterproof layer 33 can also be formed by solidifying waterproof mortar to further waterproof the side wall 11 .
[0028] Reference Figure 1 A concrete base layer 4 is fixedly provided between the bottom of the first waterproof layer 22 of the base plate 1 and the bottom of the permanent protection wall 3. A cushion layer 5 is fixedly provided at the bottom of the concrete base layer 4. The cushion layer 5 can be a soil layer of the foundation. The concrete base layer 4 formed by pouring can stably support the base plate 1 and other structures on the cushion layer 5.
[0029] The implementation principle of the waterproof structure at the connection between the basement floor and the side wall of the utility model is as follows:
[0030] By setting up various waterproof structures such as the first waterproof coiled material 2, the second waterproof coiled material 21, the first waterproof layer 22 and the second waterproof layer 33, the waterproof performance of the connection between the basement floor 1 and the side wall 11 can be improved;
[0031] The pressing plate 23 can be pressed at the connection between the first waterproof membrane 2 and the second waterproof membrane 21 through a plurality of hemispherical blocks 24, thereby improving the connection strength and reliability of the fit between the first waterproof membrane 2 and the second waterproof membrane 21, thereby ensuring the continuity and stability of the waterproof mechanism composed of the first waterproof membrane 2 and the second waterproof membrane 21, and making the connection between adjacent waterproof membranes less prone to water leakage and seepage.
[0032] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A waterproof structure for the connection between a basement floor and a side wall, comprising a floor (1), a side wall (11) cast on the top of the floor (1), and a waterproof mechanism provided between the floor (1) and the water-facing surface of the side wall (11), characterized in that: The waterproof mechanism comprises a first waterproof roll (2) fixedly arranged on the top of a bottom plate (1), and a second waterproof roll (21) fixedly arranged on the water-facing surface of a side wall (11), wherein the top end of the first waterproof roll (2) is extended to the water-facing surface of the side wall (11), and the bottom end of the second waterproof roll (21) is extended to the top of the first waterproof roll (2) of the bottom plate (1), and a pressure plate (23) is provided at the connection between the bottom plate (1) and the side wall (11), and a plurality of hemispherical blocks (24) are fixedly provided on the outer wall of the pressure plate (23) for improving the connection strength between the first waterproof roll (2) and the second waterproof roll (21) by top pressure.
2. A waterproof structure for the connection between the basement floor and the side wall according to claim 1, characterized in that: A construction joint (12) is formed at the bottom end of the side wall body (11), and a water stop strip (13) for stopping water from the construction joint (12) is provided inside the side wall body (11).
3. The waterproof structure at the connection between the basement floor and the side wall according to claim 1, characterized in that: A first waterproof layer (22) is fixedly provided between the bottom plate (1), the side wall (11) and the outer wall of the waterproof mechanism, and the pressing plate (23) and the plurality of hemispherical blocks (24) are located inside the first waterproof layer (22).
4. A waterproof structure for the connection between the basement floor and the side wall according to claim 3, characterized in that: A permanent protective wall (3) is fixedly provided on the water-facing surface of the first waterproof layer (22) of the bottom plate (1), and a temporary protective wall (31) is fixedly provided on the top of one side of the first waterproof layer (22) close to the permanent protective wall (3).
5. The waterproof structure for the connection between the basement floor and the side wall according to claim 4, characterized in that: A fine stone concrete protective layer (32) is fixedly provided between the top of the first waterproof layer (22) of the base plate (1) and the temporary protective wall (31).
6. A waterproof structure for the connection between the basement floor and the side wall according to claim 5, characterized in that: A second waterproof layer (33) is fixedly provided between the water-facing surface of the first waterproof layer (22) of the side wall (11) and the top of the fine stone concrete protective layer (32).
7. A waterproof structure for the connection between the basement floor and the side wall according to claim 6, characterized in that: A concrete base layer (4) is fixedly provided between the bottom of the first waterproof layer (22) of the base plate (1) and the bottom of the permanent protection wall (3).
8. The waterproof structure for the connection between the basement floor and the side wall according to claim 7, characterized in that: A cushion layer (5) is fixedly provided at the bottom of the concrete base layer (4).