Movable scaffold board support for installing evaporative condenser steel structure
By designing a mobile scaffolding bracket for installation of evaporative condenser steel structures, the problems of long-term construction, large workload and insufficient stability and safety of traditional scaffolding are solved, rapid construction, construction efficiency and safety are improved, and costs are reduced.
Patent Information
- Application Number
- CN202421773702.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2025-05-16
- Estimated Expiration
- 2034-07-25
AI Technical Summary
During the installation of traditional evaporative condenser steel structures, construction workers need to use a large number of ordinary scaffolding, which takes a long time and a large amount of work. As the construction height increases, the stability and safety of scaffolding face greater challenges.
A mobile scaffolding bracket is designed, including a horizontal rail bracket, a vertical rail bracket, a support bracket and n-shaped legs. It is connected through welding to form a stable rectangular cavity structure. The bracket can be directly hoisted to the upper part of the middle box, simplifying the construction and dismantling process.
It greatly saves time and labor costs, improves construction efficiency, enhances the stability and anti-slip capacity of the bracket, ensures construction safety, and reduces material usage and construction costs.
Smart Images

Figure CN222879169U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of scaffolding, in particular to a mobile scaffolding board bracket used for installing a steel structure of an evaporative condenser. Background Art
[0002] In the traditional installation process of evaporative condenser steel structure, construction workers usually need to use a large number of ordinary scaffolding pipes and scaffolding boards to build a working platform. This traditional scaffolding construction method is not only time-consuming and labor-intensive, but also easily increases the workers' idle time due to the cumbersome operations during the installation and dismantling process. In addition, as the construction height increases, the stability and safety of the scaffolding also face greater challenges. In view of this, this application is specially proposed. Utility Model Content
[0003] This application proposes a mobile scaffolding support for the installation of an evaporative condenser steel structure to solve the technical problems that the traditional scaffolding construction method in the prior art is not only time-consuming and labor-intensive, but also easily increases the workers' idle time due to the cumbersome operations during the installation and removal process. In addition, as the construction height increases, the stability and safety of the scaffolding also face greater challenges. The above technical objectives of the utility model are achieved through the following technical solutions:
[0004] A movable scaffolding support for installing an evaporative condenser steel structure comprises a cross-rail support, a vertical rail support, a support frame, and support legs. The number of the cross-rail supports is two. The vertical rail supports are evenly spaced between the cross-rail supports on both sides. A rectangular cavity is formed between the vertical rail supports and the cross-rail supports. The support frames are respectively arranged at two side positions of the bottom of the cross-rail supports on both sides. The support legs are all arranged at the bottom of the support frames, and the support legs are in an N-shape.
[0005] Preferably, a step is provided between the two support frames.
[0006] Preferably, the steps are all located directly below one of the vertical rail supports.
[0007] Preferably, the height of the support frame and the support legs is 1.6-1.65m.
[0008] Preferably, the transverse rail bracket, the vertical rail bracket and the supporting frame are all connected by welding.
[0009] Preferably, the number of the vertical rail brackets is five.
[0010] Compared with the prior art, the beneficial effects of the present invention include:
[0011] This mobile scaffolding bracket can be directly hoisted to the sprinkler main pipe on the upper part of the middle box by a crane, without the need for tedious construction and dismantling work like traditional scaffolding, which greatly saves time and labor costs. Construction workers can quickly stand on the bracket to install and weld the upper steel frame, improving construction efficiency;
[0012] The support adopts a stable structure consisting of a horizontal rail support, a vertical rail support, a support frame and a support foot. The stability and load-bearing capacity of the overall structure are ensured by welding. At the same time, the N-shaped support foot design increases the contact area with the ground and improves the support's anti-slip and anti-overturning capabilities. In addition, the setting of the ladder facilitates the construction workers to move safely between different heights, further enhancing the safety of the operation;
[0013] This mobile scaffolding bracket adopts an optimized design to reduce the amount of materials used. At the same time, since the bracket can be reused, the construction cost is reduced. In addition, the installation and removal workload of the scaffolding pipe is reduced, which further reduces the construction cost and time cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] In the figure: 1. horizontal rail bracket; 2. vertical rail bracket; 3. support frame; 4. support foot; 5. ladder. DETAILED DESCRIPTION
[0016] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0017] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0018] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.
[0019] Please see attached Figure 1 A mobile scaffolding support for installing an evaporative condenser steel structure includes a cross rail support 1, a vertical rail support 2, a support frame 3, and a support leg 4. The number of cross rail supports 1 is two, and the vertical rail supports 2 are evenly spaced between the cross rail supports 1 on both sides. The number of vertical rail supports 2 is five. The cross rail supports 1, the vertical rail supports 2 and the support frame 3 are all welded. A rectangular cavity is formed between the vertical rail supports 2 and the cross rail supports 1. The support frames 3 are respectively arranged on both sides of the bottom of the cross rail supports 1 on both sides. The support legs 4 are all arranged at the bottom of the support frames 3. The height of the support frames 3 and the support legs 4 is 1.6-1.65m, and the support legs 4 are in an N-shape.
[0020] With the above technical solution, the horizontal rail bracket 1 serves as the lateral support of the main frame, providing a stable horizontal platform foundation. The two horizontal rail brackets 1 are respectively installed at both ends of the installation area of the evaporative condenser steel structure to ensure the lateral stability of the entire bracket system. The vertical rail bracket 2 is evenly spaced between the two horizontal rail brackets 1 to form multiple support points. The vertical rail bracket 2 not only enhances the rigidity of the overall structure, but also constitutes the boundary of the rectangular cavity, providing a safe working space for construction personnel. The horizontal rail and the vertical rail are connected by welding or other fastening methods to ensure that the structure is stable and not easy to deform.
[0021] The support frame 3 is arranged on both sides of the bottom of the cross rail support 1. Its main function is to bear the weight of the entire scaffolding support and the construction personnel, tools and materials on it, and transfer them safely to the ground. The support leg 4 is installed at the bottom of the support frame 3. The N-shaped design enhances the contact area and stability with the ground, effectively preventing the support from slipping or overturning during operation, and ensuring construction safety.
[0022] The height of the support frame 3 and the support leg 4 is designed to be 1.62m, which can not only ensure that the construction workers have enough comfort and operating space when working on the scaffolding, but also ensure the stability and safety of the support structure;
[0023] The cross rail bracket 1, the vertical rail bracket 2 and the support frame 3 are connected by welding, and the structure is firm and the connection strength is high; the five vertical rail brackets 2 are evenly distributed between the cross rail bracket 1, forming a plurality of effective support points, effectively dispersing the weight of the scaffolding bracket and the load thereon, and improving the bearing capacity and stability of the whole structure. At the same time, the appropriate number of vertical rails also helps to maintain the lightweight design of the bracket, which is convenient for lifting and transportation.
[0024] In some embodiments, a step 5 is provided between the two support frames 3, and the step 5 is located directly below one of the vertical rail brackets 2. The step 5 is provided between the two support frames 3 to facilitate the construction workers to climb, and the step 5 is located directly below one of the vertical rail brackets 2, which ensures the compactness of the structure and facilitates the construction workers to quickly reach the required working height, thereby ensuring the safety of the construction workers during the up and down process.
[0025] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. A mobile scaffolding support for installing an evaporative condenser steel structure, characterized in that: The invention comprises a cross-rail support (1), a vertical rail support (2), a support frame (3), and support feet (4); the number of the cross-rail supports (1) is two; the vertical rail supports (2) are evenly spaced between the cross-rail supports (1) on both sides; a rectangular cavity is formed between the vertical rail supports (2) and the cross-rail support (1); the support frames (3) are respectively arranged at two side positions of the bottom of the cross-rail supports (1) on both sides; the support feet (4) are all arranged at the bottom of the support frames (3); and the support feet (4) are in an N-shape.
2. A mobile scaffolding support for installing an evaporative condenser steel structure according to claim 1, characterized in that: A step (5) is provided between the two support frames (3).
3. A mobile scaffolding support for installing an evaporative condenser steel structure according to claim 2, characterized in that: The steps (5) are all located directly below one of the vertical rail supports (2).
4. A mobile scaffolding support for installing an evaporative condenser steel structure according to claim 1, characterized in that: The height of the support frame (3) and the support legs (4) is 1.6-1.65 m.
5. The mobile scaffolding support for installing the steel structure of an evaporative condenser according to claim 1, characterized in that: The transverse rail bracket (1), the vertical rail bracket (2) and the support frame (3) are all connected by welding.
6. The mobile scaffolding support for installing the steel structure of an evaporative condenser according to claim 1, characterized in that: The number of the vertical rail brackets (2) is five.