Production line layout for continuously drying flaky natural rubber
By designing a sheet-shaped natural rubber continuous drying production line layout including a creping chip machine, a demetering water device, a cutting machine, a hanging piece, a buffer device, a shuttle vehicle, a heat pump drying library and a conveying device, the problems of low automation and low yield in the prior art are solved, and efficient film drying and production line automation are achieved.
Patent Information
- Application Number
- CN202421463884.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2034-06-25
AI Technical Summary
The existing sheet-shaped natural rubber production process has low degree of automation, low yield, high manual operation strength, and low production efficiency.
A production line layout for continuous drying of sheet natural rubber is designed, including a creping machine, a demetering water device, a cutting machine, a hanging part, a buffer device, a shuttle vehicle, a heat pump drying library and a conveying device to realize the automatic hanger, storage and drying of the film.
Through automated control, product production efficiency is improved, timely monitoring and control of production equipment status is achieved, employee labor intensity is reduced, and product quality is improved.
Smart Images

Figure CN222904594U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rubber primary processing, in particular to a production line layout for continuous drying of sheet-shaped natural rubber. Background Art
[0002] Natural rubber is divided into smoked sheet rubber, standard rubber, crepe rubber and latex according to the manufacturing process and appearance. Smoked sheet rubber is the most representative variety of natural rubber. It was once the variety with the largest consumption and the widest application. Its main use is in the production and manufacturing of rubber tires, cables and conveyor belts. Its production process is mainly to make smoked rubber sheets (RSS3) after filtering, acid coagulation, sheet pressing, drying and smoking. Crepe rubber is mainly made of latex clots or mixed rubber as raw materials, which are washed, pressed and refined into rubber with wrinkles on the surface, and dried naturally or with hot air. Crepe rubber is divided into three types according to the appearance, chemical composition and physical and mechanical properties. The quality is assessed, including white crepe sheets, brown crepe sheets and black crepe sheets. Each type is divided into several grades, and there are thin sheets and thick sheets.
[0003] At present, in the drying process of sheet rubber, due to the uneven skills of workers, the baking process is not properly supervised and the firepower is not well controlled, resulting in the product being not baked well, and the residual moisture causing the film to bubble and become raw, which in turn causes mold and other problems. Production practice shows that in the traditional production process, the qualified rate of finished products of smoked sheet rubber is about 75%, and the qualified rate of grades above RSS3 is about 50%. At the same time, due to the low degree of automation in the natural rubber production process, a large amount of manual labor is required to transport and control materials throughout the production process.
[0004] Therefore, in order to solve the problems of low automation and low yield of the existing flaky natural rubber production process, the inability to timely monitor and control the status of each production equipment during the production process, high manual operation intensity and low production efficiency, it is necessary to develop a method for continuous drying of flaky natural rubber and a production line layout. Summary of the invention
[0005] In order to solve the problems of the prior art, the purpose of the utility model is to provide a production line layout for continuous drying of sheet-shaped natural rubber, which utilizes a sheet creping machine, a surface water removal device, a cutting machine, a sheet assembly device, a sheet hanging device, a buffer device, and a shuttle car to realize the automatic hanging and storage of the creped film; and utilizes a shuttle car and a heat pump drying warehouse to realize the out-of-warehouse and drying of the hanging rod; the specific contents are as follows:
[0006] A production line layout for continuous drying of sheet-shaped natural rubber, comprising: a sheet creping machine, a surface water removal device, a cutting machine, a sheet hanging unit, a buffer device, a shuttle car, a heat pump drying warehouse and a conveying device;
[0007] The crepe machine is installed at the front end of the cutter, and the hanging section is installed at the rear end of the cutter; the buffer device is installed at the rear end of the hanging section; the heat pump drying storehouse and the buffer device are connected through the shuttle vehicle.
[0008] The rubber block is subjected to multi-stage creping by the creping machine to form a film, which is then sent to the cutting machine to be cut into a suitable size for hanging, and then hung by the hanging section. After hanging, it enters the buffer device to adjust the intervals between the registered films, and finally is sent to the heat pump drying warehouse by the shuttle car to be dried. The film is transported between the creping machine, the surface water removal device, the cutting machine, and the hanging section by the conveying device. A positioning block is provided on the conveyor belt of the buffer device, and a circular arc hole with the same diameter as the hanging rod is opened on the top of the positioning block.
[0009] Furthermore, the film hanging part includes a film assembling device, a film pre-pressing device and a film hanging device; the film assembling device is installed on the conveying device; the conveying device includes a bracket, a multi-section conveyor belt, a plurality of conveyor rollers and a plurality of motors; the film assembling device includes a rubber pushing plate, a reciprocating rod, a light rod and a cylinder; the reciprocating rod is arranged on a bracket on one side of the conveying device, and one end thereof extends horizontally to the bracket on the other side of the conveyor belt and is fixedly connected to the rubber pushing plate; the other end of the reciprocating rod is connected to the cylinder; the rubber pushing plate is arranged above the conveyor belt, and its plate surface is parallel to the side surfaces of the brackets on both sides of the conveyor belt; the lower edge of the plate surface of the rubber pushing plate is close to but does not contact the upper surface of the conveyor belt; the light rod is fixedly arranged on the bracket of the conveying device parallel to the reciprocating rod, a through hole is provided on the rubber pushing plate, and the light rod passes through the through hole provided on the rubber pushing plate; the reciprocating rod can be extended and retracted under the drive of the cylinder to drive the rubber pushing plate to move.
[0010] Furthermore, the film pre-pressing device is arranged and installed on the conveying device, including a cylinder, a pressing knife, a pressing seat and a frame; the frame is erected on the bracket of the conveying device across the conveyor belt, the pressing seat is movably installed inside the frame, and the upper surface of the pressing seat is connected to the cylinder; the lower surface of the pressing seat is provided with a pressing groove upward, the length of the pressing groove is the same as the width of the conveyor belt of the conveying device, and the two ends of the pressing groove are flush with the two ends of the conveyor belt; the top of the pressing groove is arc-shaped, and its diameter is the same as the hanging rod used for hanging films; the pressing knife is arranged and installed between two sections of the conveyor belt, directly below the pressing seat; the cutting head of the pressing knife is arc-shaped, which can fit with the gap of the pressing groove, and the direction of the cutting head is upward; the end of the pressing knife without a cutting head is connected to the cylinder; the pressing knife and the pressing seat can extend relative to each other under the drive of the cylinder to pre-press the film located on the conveying device.
[0011] Furthermore, the film hanging device includes a hanging rod conveyor, a motor, and a rod storage box; the end of the conveying device is connected to the middle of the hanging rod conveyor, and the hanging rod conveyor forms a certain angle with the bottom surface; a plurality of hanging rods are arranged in the rod storage box, and are fixedly connected to the lower part of the hanging rod conveyor; the hanging rod conveyor is driven by the motor to transport the hanging rods in the rod storage box upward, and the film hanging from the end of the conveying device is hung on the hanging rods and transported upward.
[0012] Furthermore, the cutting machine includes a cutting machine frame, a cutting knife, and a cylinder. The cutting machine frame is mounted on the bracket of the conveying device across the conveyor belt. The cutting knife is provided with a mounting hole for mounting the cylinder. The cylinder rod of the cylinder is fixedly connected to the cutting knife, so that the cutting knife can cut the film conveyed on the conveying device vertically downward.
[0013] Furthermore, the heat pump drying store comprises a heat pump device, a piping system, a box body and a fan; the piping system is connected to the heat pump device and the box body respectively; and the fan is arranged inside the box body.
[0014] Furthermore, the shuttle vehicle comprises a transverse track and a longitudinal track, a hanging rod support is arranged on the longitudinal track, and a groove matching the diameter of the hanging rod is formed on the upper surface of the hanging rod support.
[0015] Furthermore, the surface water removal device includes an air knife device and a hot air device, and the air knife and hot air are used to remove the surface water of the film.
[0016] After the rubber block is processed by multi-stage creping, a small amount of water-containing sheet rubber is formed; then it is transported by the conveyor belt, and when it passes through the surface water removal device 5, the wind knife device and the hot air device in the surface water removal device 5 blow away the residual moisture on the surface of the film 15; then it passes through the cutter 6, and the cylinder 14 on the cutter 6 drives the cutter 62 to press down to cut the film 15 into a length suitable for hanging film; when the film 15 is transported to the sheet assembly device 1, the conveyor belt changes from a single strip to a double strip arranged in parallel, and the rubber pusher 11 of the sheet assembly device 1 pushes the conveyed film 15 to another parallel conveyor belt, and then the conveyor belt stops conveying and waits for the film 1 on the first conveyor belt to be transported. After being transported again, the two films 15 are combined into a group, and then the film pre-pressing device 2 pre-presses the film 15 on the conveyor belt, and the pressure knife 21 pushes the knife head upward while the pressure seat 22 presses downward, pressing a groove on the lower surface of the film 15; the conveyor belt continues to convey, and when passing the end of the conveyor belt, one end of the film 15 extends out of the end of the conveyor belt and naturally hangs down. At this time, the hanging rod conveyor 31 conveys the hanging rod obliquely upward, and the hanging rod is inserted into the groove pressed on the lower surface of the film 15 from below and hangs the film 15 upward and sends it into the buffer device 7, and then the shuttle car 8 sends the hung film 15 in the buffer device 7 to each heat pump drying warehouse 9 for drying. The heat pump drying warehouse 9 dries the film 15 by hot air.
[0017] The utility model has the following beneficial effects compared with the prior art:
[0018] The utility model utilizes automatic control of sheet rubber production and processing equipment to improve product production efficiency; on the other hand, through full control of the production process, timely monitoring and control of the status of each production equipment is achieved, thereby improving product quality while reducing the labor intensity of employees.
[0019] In this solution, a film pre-pressing device is used to press creases on the film before hanging the film, so that the end of the film can be kept vertically downward when hanging the film, and the distance between the hung film and the adjacent films from top to bottom is kept uniform, further making the entire drying process more uniform and improving the processing quality of the rubber film. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a three-dimensional schematic diagram of the overall structure of the production line of the utility model;
[0021] Figure 2 This is a top view of the overall structure of the production line of the utility model;
[0022] Figure 3 This is a schematic diagram of the three-dimensional structure of the sheet assembly device of the utility model;
[0023] Figure 4 This is a schematic diagram of the bottom three-dimensional structure of the sheet assembly device of the utility model;
[0024] Figure 5 This is a schematic diagram of the installation structure of the film assembly device and the film pre-pressing device of the utility model;
[0025] Figure 6 This is a front cross-sectional view of the film pre-pressing device of the utility model;
[0026] Figure 7 This is a schematic diagram of the film pre-pressing device of the utility model in use;
[0027] Figure 8 This is a schematic diagram of the film pre-pressing device of the utility model in use;
[0028] Fig. 9 This is a schematic diagram of the use status of the film assembly device and the film pre-pressing device of the utility model;
[0029] Fig.10 This is a schematic diagram of the use status of the hanging device of the utility model;
[0030] Fig.11 This is a cross-sectional view of the hanging device of the utility model in use;
[0031] Fig.12This is a front cross-sectional view of the cutting machine described in the utility model.
[0032] In the figure:
[0033] 1—film assembly device, 11—rubber push plate, 12—reciprocating rod, 13—polished rod, 14—cylinder, 15—film;
[0034] 2—film pre-pressing device, 21—pressing knife, 22—pressing seat, 23—frame;
[0035] 3—piece hanging device, 31—rod hanging conveyor, 32—motor, 33—rod storage box;
[0036] 4—crepe machine; 5—water removal device; 6—cutting machine, 61—cutting knife frame, 62—cutting knife;
[0037] 7—caching device, 71—positioning block; 8—shuttle car, 81—transverse track, 82—longitudinal track; 9—heat pump drying
[0038] Storage, 91 - heat pump device, 92 - piping system, 93 - box; 10 - conveying device; DETAILED DESCRIPTION
[0039] In order to make the technical means, creative features and purpose of the present invention easy to understand, the technical solution of the invention is further explained below in combination with one embodiment and specific implementation method of a method for continuous drying of sheet natural rubber and a production line layout provided by the present invention.
[0040] like Figure 1-12 As shown, the specific embodiments given for the invention are as follows:
[0041] A production line layout for continuous drying of sheet-like natural rubber comprises: a sheet creping machine 4, a surface water removal device 5, a cutting machine 6, a sheet hanging part, a buffer device 7, a shuttle vehicle 8, a heat pump drying warehouse 9 and a conveying device 10; a rubber block is subjected to multi-stage creping by the sheet creping machine 4 to form a sheet 15, the sheet 15 is sent to the cutting machine 6 to be cut into a suitable hanging sheet size, and then is hung by the sheet hanging part, and then enters the buffer device 7 to adjust the interval between the hung sheets 15, and finally is sent to the heat pump drying warehouse 9 by the shuttle vehicle 8 to dry the sheet 15; the sheet 15 is conveyed between the sheet creping machine 4, the surface water removal device 5, the cutting machine 6 and the sheet hanging part by the conveying device 10; a positioning block 71 is arranged on the conveying belt of the buffer device 7, and a circular arc hole having the same diameter as the hanging rod is opened on the top of the positioning block 71.
[0042] The film hanging section includes a film assembly device 1, a film pre-pressing device 2 and a film hanging device 3 connected in sequence; the conveyor belt of the conveying device 10 has a width of a single film 15 before the film hanging section, and becomes a width of double films 15 after entering the film hanging section. In the film assembly device 1, two conveyor belts with a width of a single film 15 are combined to form a width of double films 15. The sheet assembling device 1 is installed on the conveying device 10; the conveying device 10 includes a bracket, a plurality of conveying belts, a plurality of conveying rollers and a plurality of motors 32; the sheet assembling device 1 includes a rubber pushing plate 11, a reciprocating rod 12, a polished rod 13 and a cylinder 14; the reciprocating rod 12 is arranged on a bracket on one side of the conveying device 10, and one end of the reciprocating rod 12 extends horizontally to the bracket on the other side of the conveying belt and is fixedly connected to the rubber pushing plate 11; the other end of the reciprocating rod 12 is connected to the cylinder 14; the rubber pushing plate 11 is arranged above the conveying belt, and its plate surface is parallel to the side surfaces of the brackets on both sides of the conveying belt; the lower edge of the plate surface of the rubber pushing plate 11 is close to but does not contact the upper surface of the conveying belt; the polished rod 13 is fixedly arranged on the bracket of the conveying device 10 parallel to the reciprocating rod 12, and a through hole is opened on the rubber pushing plate 11, and the polished rod 13 passes through the through hole opened on the rubber pushing plate 11; the reciprocating rod 12 can be extended and retracted under the drive of the cylinder 14 to drive the rubber pushing plate 11 to move.
[0043] The film pre-pressing device 2 is arranged and installed on the conveying device 10, including a cylinder 14, a pressing knife 21, a pressing seat 22 and a frame 23; the frame 23 is erected on the bracket of the conveying device 10 across the conveyor belt, and the pressing seat 22 is movably installed inside the frame 23, and the upper surface of the pressing seat 22 is connected to the cylinder 14; a pressing groove is opened upward on the lower surface of the pressing seat 22, and the pressing groove has the same width as the conveyor belt of the conveying device 10, and the two ends of the pressing groove are flush with the two ends of the conveyor belt; the top of the pressing groove is arc-shaped, and its diameter is the same as the hanging rod used for hanging films; the pressing knife 21 is arranged and installed between two sections of the conveyor belt, and is located directly below the pressing seat 22; the knife head of the pressing knife 21 is arc-shaped, which can match the gap of the pressing groove, and the knife head is directed upward; the end of the pressing knife 21 without a knife head is connected to the cylinder 14; the pressing knife 21 and the pressing seat 22 can extend relative to each other under the drive of the cylinder 14 to pre-press the film 15 located on the conveying device 10.
[0044] The film hanging device 3 includes a hanging rod conveyor 31, a motor 32, and a rod storage box 33; the end of the conveying device 10 is connected to the middle of the hanging rod conveyor 31, and the hanging rod conveyor 31 forms a certain angle with the bottom surface; a plurality of hanging rods are arranged in the rod storage box 33, and are fixedly connected to the lower part of the hanging rod conveyor 31; the hanging rod conveyor 31 is driven by the motor 32 to transport the hanging rods in the rod storage box 33 upward, and the film 15 hanging from the end of the conveying device 10 is hung on the hanging rods and transported upward.
[0045] The cutting machine 6 includes a cutting frame 61, a cutting knife 62, and a cylinder 14. The cutting frame 61 is mounted on the bracket of the conveying device 10 across the conveyor belt. The cutting knife 62 is provided with a mounting hole for mounting the cylinder 14. The cylinder 14 rod of the cylinder 14 is fixedly connected to the cutting knife 62, so that the cutting knife 62 can vertically downwardly cut the film 15 transported on the conveying device 10. The heat pump drying warehouse 9 includes a heat pump device 91, a pipeline system 92, a box 93 and a fan; the pipeline system 92 is connected to the heat pump device 91 and the box 93 respectively; the fan is arranged inside the box 93. The shuttle 8 includes a transverse track 81 and a longitudinal track 82. The longitudinal track 82 is provided with a hanging rod support, and the upper surface of the hanging rod support is provided with a groove matching the diameter of the hanging rod. The surface water removal device 5 includes a wind knife device and a hot air device, and uses the wind knife and hot air to remove the surface water of the film 15.
[0046] A method for continuously drying sheet-like natural rubber comprises the following steps:
[0047] S1, crepe; the produced rubber block is subjected to multi-stage crepe, and a large amount of water is removed by extrusion; after step S1 multi-stage crepe, the moisture content of the film 15 is ≤35%, and the thickness of the film is 4 to 10 mm;
[0048] S2, removing surface water; removing the residual water on the surface of the sheet film 15 after the multi-stage crepe sheet;
[0049] S3, cutting; cutting the film 15 from which the surface water has been removed to a fixed length; the moisture content of the film 15 after the surface water has been removed in step S2 is ≤15%;
[0050] S4, hanging film; hanging the cut fixed-length film 15; hanging film includes film 15 teaming and pre-pressing, and the cut film 15 is combined by film 15 teaming to facilitate subsequent hanging film; pre-pressing can pre-press creases on the film 15 before hanging film, so that the hanging film makes the film 15 on both sides of the hanging rod vertically downward;
[0051] S5, caching; conveying the hanging rods after hanging the sheets and arranging them in sequence;
[0052] S6, drying; the sequentially arranged films 15 are transported to a drying warehouse for drying; the moisture content of the films 15 after drying in step S6 is ≤1%; the drying temperature range of step S6 is 80 to 90°C.
[0053] After the rubber block is processed by multi-stage creping, a small amount of sheet rubber containing water is formed; then it is transported by the conveyor belt, and when it passes through the surface water removal device 5, the wind knife device and the hot air device in the surface water removal device 5 blow away the residual water on the surface of the film 15; then it passes through the cutter 6, and the cylinder 14 on the cutter 6 drives the cutter 62 to press down to cut the film 15 into a length suitable for hanging film; when the film 15 is transported to the sheet assembly device 1, the conveyor belt changes from a single strip to a double strip arranged in parallel, and the rubber pusher 11 of the sheet assembly device 1 pushes the conveyed film 15 to another parallel conveyor belt, and then the conveyor belt stops conveying and waits for the rubber on the first conveyor belt to be removed. After the film 15 is transported again, two films 15 are combined into a group, and then the film pre-pressing device 2 pre-presses the film 15 on the conveyor belt, and the pressure knife 21 pushes the knife head upward while the pressure seat 22 presses downward, pressing a groove on the lower surface of the film 15; the conveyor belt continues to convey, and when passing the end of the conveyor belt, one end of the film 15 extends out of the end of the conveyor belt and naturally hangs down. At this time, the hanging rod conveyor 31 conveys the hanging rod obliquely upward, and the hanging rod is stuck in the groove pressed on the lower surface of the film 15 and hangs the film 15 upward and sends it into the buffer device 7, and then the shuttle car 8 sends the hung film 15 in the buffer device 7 to each heat pump drying warehouse 9 for drying. The heat pump drying warehouse 9 uses hot air to dry the film 15.
[0054] It should be understood that the above specific embodiments are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. The claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. A production line layout for continuous drying of sheet-like natural rubber, characterized in that: include: A sheet creping machine (4), a surface water removal device (5), a cutting machine (6), a sheet hanging unit, a buffer device (7), a shuttle vehicle (8), a heat pump drying warehouse (9) and a conveying device (10); The creping machine (4) is arranged and installed at the front end of the cutting machine (6), and the hanging section is arranged and installed at the rear end of the cutting machine; the buffer device (7) is arranged and installed at the rear end of the hanging section; the heat pump drying storehouse (9) and the buffer device (7) are connected via the shuttle vehicle (8); The film (15) is transported between the creping machine (4), the surface water removal device (5), the cutting machine (6), and the film hanging section through the conveying device (10); a positioning block (71) is provided on the conveying belt of the buffer device (7), and a circular arc hole having the same diameter as the hanging rod is opened at the top of the positioning block (71).
2. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 1, characterized in that: The film hanging part comprises a film assembly device (1), a film pre-pressing device (2) and a film hanging device (3); the film assembly device (1) is installed on a conveying device (10); the conveying device (10) comprises a bracket, a plurality of conveying belts, a plurality of conveying rollers and a plurality of motors (32); the film assembly device (1) comprises a rubber pushing plate (11), a reciprocating rod (12), a polished rod (13) and a cylinder (14); the reciprocating rod (12) is arranged on a bracket on one side of the conveying device (10), and one end of the reciprocating rod horizontally extends to the bracket on the other side of the conveying belt and is fixedly connected to the rubber pushing plate (11); the reciprocating rod (12) the other end is connected to the cylinder (14); the rubber pushing plate (11) is arranged and installed above the conveyor belt, and its plate surface is parallel to the side surfaces of the brackets on both sides of the conveyor belt; the lower edge of the plate surface of the rubber pushing plate (11) is close to but not in contact with the upper surface of the conveyor belt; the light rod (13) is fixedly arranged and installed on the bracket of the conveying device (10) parallel to the reciprocating rod (12), and a through hole is opened on the rubber pushing plate (11), and the light rod (13) passes through the through hole opened on the rubber pushing plate (11); the reciprocating rod (12) can be extended and retracted under the drive of the cylinder (14) to drive the rubber pushing plate (11) to move.
3. A production line layout for continuous drying of sheet-like natural rubber as claimed in claim 2, characterized in that: The film pre-pressing device (2) is arranged and installed on the conveying device (10), and comprises a cylinder (14), a pressing knife (21), a pressing seat (22) and a frame (23); the frame (23) is erected on a bracket of the conveying device (10) across the conveying belt, the pressing seat (22) is movably installed inside the frame (23), and the upper surface of the pressing seat (22) is connected to the cylinder (14); the lower surface of the pressing seat (22) is provided with a pressing groove upward, the length of the pressing groove is the same as the width of the conveying belt of the conveying device (10), and the pressing groove The two ends are flush with the two ends of the conveyor belt; the top of the pressing groove is arc-shaped, and its diameter is the same as the hanging rod used for hanging films; the pressing knife (21) is arranged and installed between the two sections of the conveyor belt, and is located directly below the pressing seat (22); the knife head of the pressing knife (21) is arc-shaped and can fit in the gap of the pressing groove, and the knife head is directed upward; the end of the pressing knife (21) without the knife head is connected to the cylinder (14); the pressing knife (21) and the pressing seat (22) can extend relative to each other under the drive of the cylinder (14) to pre-press the film (15) located on the conveying device (10).
4. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 2, characterized in that: The film hanging device (3) comprises a hanging rod conveyor (31), a motor (32), and a rod storage box (33); the end of the conveying device (10) is connected to the middle of the hanging rod conveyor (31), and the hanging rod conveyor (31) forms a certain angle with the bottom surface; a plurality of hanging rods are arranged in the rod storage box (33) and are fixedly connected to the lower part of the hanging rod conveyor (31); the hanging rod conveyor (31) is driven by the motor (32) to transport the hanging rods in the rod storage box (33) upward, and the film (15) hanging from the end of the conveying device (10) is hung on the hanging rods and transported upward.
5. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 1, characterized in that: The cutting machine (6) comprises a cutting frame (61), a cutting knife (62), and a cylinder (14). The cutting frame (61) is mounted on a bracket of the conveying device (10) across the conveying belt. The cutting knife (62) is provided with a mounting hole for mounting the cylinder (14). The cylinder (14) rod of the cylinder (14) is fixedly connected to the cutting knife (62), so that the cutting knife (62) can vertically downwardly cut the film (15) conveyed on the conveying device (10).
6. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 1, characterized in that: The heat pump drying storehouse (9) comprises a heat pump device (91), a pipe system (92), a box (93) and a fan; the pipe system (92) is connected to the heat pump device (91) and the box (93) respectively; and the fan is arranged inside the box (93).
7. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 1, characterized in that: The shuttle vehicle (8) comprises a transverse track (81) and a longitudinal track (82). A hanging rod support is arranged on the longitudinal track (82). A groove matching the diameter of the hanging rod is formed on the upper surface of the hanging rod support.
8. The production line layout for continuous drying of sheet-shaped natural rubber according to claim 1, characterized in that: The surface water removal device (5) comprises an air knife device and a hot air device, and uses the air knife and hot air to remove the surface water of the film (15).