Device for improving plane position and perpendicularity precision of SA-grade steel guardrail embedded part
By designing a device including positioning steel plates and adjustment screws, the problem of difficult to ensure positioning accuracy when installing steel guardrail embedded bolts is solved, and high-precision positioning of embedded parts and improvement of construction efficiency is achieved.
Patent Information
- Application Number
- CN202421506072.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2034-06-28
AI Technical Summary
During the existing construction, the installed steel guardrail embedded bolts require frequent measurement and adjustment, which makes it difficult to ensure the positioning accuracy and affect the construction progress and safety.
A device including a first positioning steel plate, a second positioning steel plate, a positioning steel plate mounting frame and an adjustment screw are designed. By adjusting the plane position of the positioning steel plate mounting frame and the position of the screw, precise positioning of the horizontal and vertical directions of the embedded bolts can be achieved.
The plane position and verticality accuracy of the steel guardrail embedded parts is significantly improved, the time for adjusting and positioning of embedded bolts is reduced, and the construction efficiency and progress are improved.
Smart Images

Figure CN222908555U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a device for improving the flat position and perpendicularity accuracy of the embedded parts of SA - level steel guardrails, belonging to the technical field of building construction. Background Technique
[0002] The bridge can separate motor vehicles, non - motor vehicles and pedestrians through the bridge guardrail, longitudinally separate the road in the cross - section, so that motor vehicles, non - motor vehicles and pedestrians drive in separate lanes, improving the safety of road traffic and improving traffic order. The accuracy of the embedded bolts of the bridge steel guardrail is an important link to ensure the installation quality of the steel guardrail. If the installation quality of the embedded bolts of the steel guardrail is poor, problems such as too large installation spacing and poor linearity of the steel guardrail will occur, and it will directly affect traffic safety. In the existing construction, when installing the embedded bolts of the steel guardrail, construction workers need to continuously measure and adjust the installation position of the embedded bolts. The construction is troublesome, the bolt adjustment and positioning time is long, which affects the construction progress, and it is not easy to ensure the positioning accuracy of the embedded bolts. Content of the Utility Model
[0003] Aiming at the above - mentioned defects existing in the prior art, the utility model provides a device with a simple structure, which can effectively improve the flat position and perpendicularity accuracy of the embedded parts of the steel guardrail and can improve the construction efficiency.
[0004] The utility model is realized by the following technical scheme: A device for improving the flat position and perpendicularity accuracy of the embedded parts of SA - level steel guardrails, characterized in that: it includes a first positioning steel plate, a second positioning steel plate, a positioning steel plate mounting frame, and four adjusting screws. The positioning steel plate mounting frame is a rectangular frame structure welded by section steel. Both long sides of the positioning steel plate mounting frame are angle steel parts. Strip - shaped grooves are arranged at both ends of both long sides of the positioning steel plate mounting frame. The first positioning steel plate and the second positioning steel plate are respectively connected to both ends of the positioning steel plate mounting frame through bolts in cooperation with the strip - shaped grooves arranged on both long sides of the positioning steel plate mounting frame. Bolt holes corresponding to the embedded bolts of the steel guardrail are arranged on both the first positioning steel plate and the second positioning steel plate. An adjusting nut is fixed at each of the four corner ends of the positioning steel plate mounting frame. The axis of the adjusting nut is perpendicular to the mounting surface of the first positioning steel plate and the second positioning steel plate. The four adjusting screws are respectively thread - connected to the four adjusting nuts.
[0005] In the present utility model, the distance between the first positioning steel plate and the second positioning steel plate can be adjusted according to the designed distance between two steel guardrail embedded parts. After the distance between the two positioning steel plates is adjusted, they can be fixed on the positioning steel plate mounting frame through bolts. When the present utility model is in use, the positioning steel plate mounting frame is arranged at the designed position of the steel guardrail embedded bolts. The four adjusting screws respectively support on the concrete ground on both sides of the embedded part mounting groove. The steel guardrail embedded bolts to be embedded are all passed through the bolt holes on the first positioning steel plate and the second positioning steel plate. By adjusting the plane position of the positioning steel plate mounting frame, the horizontal position of the embedded bolts can be accurately positioned. By adjusting the four adjusting screws at the four corners of the positioning steel plate mounting frame, the verticality of the embedded bolts can be adjusted. After adjustment, the embedded bolts are welded and fixed together with the structural steel bars in the embedded part mounting groove. After the embedded bolts are fixed, the device can be removed.
[0006] Further, both long sides of the positioning steel plate mounting frame are angle steel parts. The use of angle steel parts for both long sides of the positioning steel plate mounting frame can not only ensure the structural strength of the positioning steel plate mounting frame and prevent it from being deformed easily, but also facilitate the installation and fixation of the first positioning steel plate and the second positioning steel plate.
[0007] Further, to ensure that the adjusting screws can support on the concrete ground on both sides of the embedded part mounting groove, the width of the positioning steel plate mounting frame is 350 mm - 500 mm.
[0008] The beneficial effects of the present utility model are as follows: The structure of the present utility model is simple, and the installation and operation are convenient. The guardrail embedded bolts only need to be fixed on the two positioning steel plates in advance. By adjusting the plane position of the positioning steel plate mounting frame, the accurate positioning of the horizontal position of the embedded bolts can be realized. By adjusting the four screws at the four corners of the positioning steel plate mounting frame, the accurate vertical positioning of the embedded bolts can be achieved. It can not only greatly improve the installation accuracy of the embedded bolts, but also greatly reduce the time for adjusting and positioning the embedded bolts, with high construction efficiency and accelerated construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 is the structural schematic diagram of the present utility model;
[0010] Figure 2 is Figure 1 the top view schematic diagram of
[0011] In the figure, 1. positioning steel plate mounting frame, 1-1. long side of the positioning steel plate mounting frame, 1-2. first strip-shaped groove, 1-3. second strip-shaped groove, 2. first positioning steel plate, 2-1. bolt hole, 3. first fixing bolt, 4. second positioning steel plate, 4-1. bolt hole, 5. second fixing bolt, 6. adjusting nut, 7. adjusting screw. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0012] The present utility model will be further described below by means of non-limiting embodiments in conjunction with the accompanying drawings:
[0013] As shown in the accompanying drawings, a device for improving the flat position and perpendicularity accuracy of the embedded parts of SA-grade steel guardrails includes a positioning steel plate mounting frame 1, a first positioning steel plate 2, a second positioning steel plate 4, and four adjusting screws 7. The positioning steel plate mounting frame 1 is a rectangular frame structure welded by profiled steel. In this embodiment, the two long sides 1-1 of the positioning steel plate mounting frame 1 are preferably made of angle steel. At the upper parts of the two ends of the two long sides of the positioning steel plate mounting frame 1, a first strip-shaped groove 1-2 and a second strip-shaped groove 1-3 are respectively provided. The two ends of the first positioning steel plate 2 are respectively connected with the first strip-shaped groove 1-2 provided at one end of the two long sides of the positioning steel plate mounting frame 1 through two first fixing bolts 3 in a matching manner. The two ends of the second positioning steel plate 4 are respectively connected with the second strip-shaped groove 1-3 provided at the other end of the two long sides of the positioning steel plate mounting frame 1 through two second fixing bolts 5 in a matching manner. After loosening the first fixing bolt 3 and the second fixing bolt 5, the positions of the first positioning steel plate 2 and the second positioning steel plate 4 on the positioning steel plate mounting frame 1 can be adjusted. Bolt holes 2-1 and bolt holes 4-1 corresponding to the embedded bolts of the steel guardrail are respectively provided on the first positioning steel plate 2 and the second positioning steel plate 4. A M18 adjusting nut 6 is fixed at each of the four corner ends of the positioning steel plate mounting frame 1. The axis of the adjusting nut 6 is perpendicular to the mounting surfaces of the first positioning steel plate 2 and the second positioning steel plate 4. The diameter of the adjusting screw 7 is M18, and the four adjusting screws 7 are respectively threadedly connected with the four adjusting nuts 6.
[0014] In the present utility model, the length of the positioning steel plate mounting frame 1 is 1.5 m - 2 m, and its width is 350 mm - 500 mm. Both the first positioning steel plate 2 and the second positioning steel plate 4 are 300*330*10 mm steel plates.
[0015] To ensure the accurate position of the embedded bolts of the SA-grade steel guardrail, the manufacturing accuracy of the positioning steel plate mounting frame 1 and each positioning steel plate should be ensured.
[0016] When the utility model is in use, the distance between the first positioning steel plate 2 and the second positioning steel plate 4 is adjusted according to the designed distance between two steel guardrail embedded parts. After the adjustment is completed, the first positioning steel plate 2 and the second positioning steel plate 4 are respectively fixed on the positioning steel plate mounting frame 1 through the first fixing bolt and the second fixing bolt. The positioning steel plate mounting frame 1 is placed at the designed position of the steel guardrail embedded bolt. The first positioning steel plate 2 and the second positioning steel plate 4 respectively correspond to the designed positions of the two embedded parts. The lower ends of the four adjusting screws 7 are respectively supported on the concrete ground on both sides of the embedded part installation groove. The steel guardrail embedded bolts to be embedded are all passed through the bolt holes on the first positioning steel plate 2 and the second positioning steel plate 4 and fixed. By adjusting the plane position of the positioning steel plate mounting frame 1, the horizontal position of the embedded bolt is adjusted and accurately positioned. The verticality of the embedded bolt is adjusted by adjusting the four adjusting screws 7 at the four corners of the positioning steel plate mounting frame 1. After the adjustment is completed, the embedded bolt is welded and fixed together with the structural steel bars in the embedded part installation groove. After the embedded bolt is fixed, the device can be removed, and the removed device can be reused.
[0017] The utility model has a simple structure, is convenient for processing and manufacturing, has a low cost, and has a high manufacturing precision, and can effectively ensure the positioning accuracy of the embedded bolt. By using the utility model in construction, the plane position and verticality precision of the steel guardrail embedded bolt can be greatly improved. The construction is simple and convenient, the construction efficiency can be improved, and it is beneficial to accelerating the construction progress.
[0018] The other parts in this embodiment are all prior arts and will not be elaborated here.
Claims
1. A device for improving the plane position and verticality accuracy of SA-grade steel guardrail embedded parts, characterized by: It includes a first positioning steel plate, a second positioning steel plate, a positioning steel plate mounting frame, and four adjusting screws. The positioning steel plate mounting frame is a rectangular frame structure welded from steel sections. Both ends of the two long sides of the positioning steel plate mounting frame are provided with strip grooves. The first positioning steel plate and the second positioning steel plate are respectively connected to the two ends of the positioning steel plate mounting frame by bolts and the strip grooves provided on the two long sides of the positioning steel plate mounting frame. The first positioning steel plate and the second positioning steel plate are both provided with bolt holes corresponding to the embedded bolts of the steel guardrail. An adjusting nut is respectively fixed at the four corner ends of the positioning steel plate mounting frame. The axis of the adjusting nut is perpendicular to the mounting surface of the first positioning steel plate and the second positioning steel plate. The four adjusting screws are respectively threadedly connected to the four adjusting nuts.
2. The device for improving the plane position and verticality accuracy of SA-grade steel guardrail embedded parts according to claim 1 is characterized in that: The two long sides of the positioning steel plate mounting frame are both angle steel pieces.
3. The device for improving the plane position and verticality accuracy of SA-grade steel guardrail embedded parts according to claim 1 or 2, characterized in that: The width of the positioning steel plate mounting frame is 350mm-500mm.