Steel structure floor support plate and steel beam connecting structure

By setting up embedded bolts on the steel beam and opening holes on the floor bearing plate, the tie connection between the floor bearing plate and the steel beam is solved, and the problem of the existing connection method requiring lower support is solved, the construction cost and construction period are reduced, and construction safety and efficiency are improved.

CN222909055UActive Publication Date: 2025-05-27SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421074148.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-05-27
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

The existing connection method of steel structure floor bearing plates and steel beams requires a lower support system, resulting in high construction costs, long construction periods and large labor investment.

Method used

A steel structure floor bearing plate and steel beam connection structure is designed. By setting embedded bolts on the steel beam and opening holes on the floor bearing plate, the alignment and plugging of the embedded bolts and holes is used to realize the tie connection between the floor bearing plate and the steel beam.

Benefits of technology

The effective connection between the floor bearing plate and the steel beam can be achieved without lower support, reducing construction costs, reducing labor investment, speeding up construction progress, and ensuring construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222909055U_ABST
    Figure CN222909055U_ABST
Patent Text Reader

Abstract

The utility model relates to a steel structure floor support plate and steel beam connecting structure, steel beams comprise main steel beams and secondary steel beams, the main steel beams are connected end to end to form a peripheral frame, the secondary steel beams are erected in the peripheral frame and divide an area enclosed by the peripheral frame into a plurality of support plate areas, and floor support plates correspondingly cover the support plate areas; a plurality of holes are formed in the edge of the floor bearing plate, and a plurality of embedded studs corresponding to the holes are arranged on the main steel beams and the secondary steel beams forming the bearing plate area respectively. The embedded studs are arranged on the steel beam, the holes are formed in the floor support plate, and the construction effect that the lower portion of the floor support plate does not need to be supported when concrete is poured on the floor support plate for the second time is achieved by means of aligned insertion connection of the embedded studs and the holes, so that the cost of manpower, materials, machines and the like increased due to the fact that a supporting system is additionally arranged is avoided, and the construction efficiency is improved. And meanwhile, the operation safety is also improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a connection structure of a steel structure floor deck and a steel beam. Background Art

[0002] Steel structures are widely used in various projects such as buildings, bridges, and gymnasiums due to their excellent mechanical properties, durability, reliability, and reusability, meeting the requirements of sustainable development. At the same time, prefabricated floor decks have the characteristics of fast construction speed, fewer joints, and better load-bearing performance, and are also widely used in buildings. Prefabricated steel structure floor decks have the further advantages of high strength and no support compared to concrete prefabricated floor decks.

[0003] During implementation, the main connection methods between steel beams and prefabricated floor decking include the following three methods: cast-in-place connection, grouting connection and welding connection. All three methods require the construction of the lower support system for the floor decking, and the support system can only be dismantled after the connection is completed, which requires more workers, prolongs the construction period and increases the construction cost.

[0004] Therefore, how to provide a steel structure floor deck and steel beam connection structure that can achieve effective connection between the floor deck and the steel beam without the need for lower support is a technical problem that needs to be urgently solved by technical personnel in this field. Utility Model Content

[0005] The utility model provides a steel structure floor deck and steel beam connection structure to solve the above technical problems.

[0006] In order to solve the above technical problems, the utility model provides a steel structure floor decking and steel beam connection structure, the steel beam comprises a main steel beam and a secondary steel beam, the main steel beam is connected end to end to form an outer frame, the secondary steel beam is erected inside the outer frame, the area enclosed by the outer frame is divided into a plurality of decking areas, and the floor decking is correspondingly covered on the decking areas; a plurality of holes are opened on the edge of the floor decking, and a plurality of pre-embedded bolts corresponding to the holes are respectively provided on the main steel beam and the secondary steel beam constituting the decking area.

[0007] Preferably, the embedded bolts are welded to the main steel beam and the secondary steel beam.

[0008] Preferably, the floor decking comprises a steel plate and a steel truss, the steel plate is laid above the decking area, and the holes are opened on the edge of the steel plate; the steel truss is made of steel bars spliced ​​in a corrugated form, and the steel truss is fixed to the steel plate.

[0009] Preferably, the thickness of the steel plate is 0.5±0.1 mm.

[0010] Preferably, the steel truss is composed of a first steel bar, a second steel bar and a third steel bar, the first steel bar includes a flange section and a diagonal bracing section, the flange section is fitted with the steel plate, and the diagonal bracing section extends obliquely upward along the end of the flange section; the two first steel bars are symmetrically arranged and spliced ​​at the top; the second steel bar is horizontally arranged at the top splicing of the two first steel bars; the third steel bar is horizontally arranged at the connection between the flange section and the diagonal bracing section.

[0011] Preferably, after the embedded bolts are aligned and connected with the steel beams, the steel trusses are tied and fixed with the embedded bolts.

[0012] Preferably, after the embedded bolts are aligned and connected with the steel beams, the embedded bolts are fixed to the holes by welding.

[0013] Compared with the prior art, the steel structure floor deck and steel beam connection structure provided by the utility model has the following advantages:

[0014] 1. The utility model sets embedded bolts on the steel beam and opens holes on the floor decking plate, and uses the embedded bolts and the holes to achieve the connection between the floor decking plate and the steel beam, so as to ensure that when the upper part of the floor decking plate is poured with concrete, the floor decking plate has sufficient strength to meet the needs of the construction load, ensure the construction safety, reduce the input of labor, materials, etc., and also reduce the cost and speed up the construction progress;

[0015] 2. The steel beams and floor decking plates in the utility model are easy to manufacture and can be prefabricated in the factory, which reduces high-altitude operations and ensures the connection quality of the prefabricated bolts on the steel beams. After the steel plates are connected with the embedded bolts on the steel beams, the steel trusses can be directly laid, and the construction is convenient and quick. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a plan view of the connection structure between the steel structure floor deck and the steel beam in a specific implementation manner of the utility model;

[0017] Figure 2 It is an elevation view of the connection structure between the steel structure floor deck and the steel beam in a specific implementation manner of the utility model;

[0018] Figure 3 This is a schematic diagram of the connection between the steel beam and the embedded bolts in a specific implementation manner of the utility model;

[0019] Figure 4 It is a schematic diagram of the elevation structure of a floor decking plate in a specific implementation manner of the utility model.

[0020] In the figure: 10-steel beam, 11-main steel beam, 12-secondary steel beam, 13-embedded bolts, 20-floor decking, 21-steel plate, 22-steel truss, 23-first steel bar, 24-second steel bar, 25-third steel bar. DETAILED DESCRIPTION

[0021] In order to describe the technical solution of the above utility model in more detail, specific embodiments are listed below to demonstrate the technical effect; it should be emphasized that these embodiments are used to illustrate the utility model but not to limit the scope of the utility model.

[0022] The utility model provides a steel structure floor deck and steel beam connection structure, such as Figures 1 to 4 As shown, the steel beam 10 includes a main steel beam 11 and a secondary steel beam 12. The main steel beam 11 is connected end to end to form a peripheral frame. In this embodiment, the peripheral frame is rectangular. Figure 1 As shown; the secondary steel beam 12 is set inside the outer frame, and the area enclosed by the outer frame is divided into a plurality of support plate areas. In this embodiment, the support plate area is also rectangular, such as Figure 1 As shown; the floor decking plate 20 corresponds to the covering area of ​​the decking plate; the edge of the floor decking plate 20 is provided with a plurality of holes ( Figure 1 The holes overlap with the embedded bolts 13), and the main steel beams 11 and the secondary steel beams 12 constituting the deck area are respectively provided with a plurality of embedded bolts 13 corresponding to the holes. The utility model provides embedded bolts 13 on the steel beams 10, and opens holes on the floor deck 20, and utilizes the aligned insertion of the embedded bolts 13 and the holes, so as to facilitate the timely connection of the holes with the embedded bolts 13 on the steel beams 10 during the construction of the floor deck 20 of the steel structure, thereby improving the integrity and stability of the steel beams 10 and the floor deck 20, and then ensuring that when the upper part of the floor deck 20 is poured with concrete, the floor deck 20 has sufficient strength to meet the needs of the construction load, thereby ensuring construction safety, reducing the input of labor and materials, etc., and also reducing costs and accelerating the construction progress.

[0023] In some embodiments, please refer to Figure 3 , the embedded bolts 13 are welded to the main steel beams 11 and the secondary steel beams 12. Specifically, when the steel beams 10 of the steel structure are prefabricated, mounting holes for installing the embedded bolts 13 can be reserved on the steel beams 10, and the embedded bolts 13 can be bolted or welded in the mounting holes later. That is, the embedded bolts 13 can be installed on the ground before the steel beams 10 are hoisted, thereby reducing high-altitude operations and better ensuring the connection quality of the embedded bolts 13 on the steel beams 10.

[0024] In some embodiments, please refer to Figure 4The floor deck 20 includes a steel plate 21 and a steel truss 22. The steel plate 21 is laid above the deck area, and the holes are opened on the edge of the steel plate 21. The steel truss 22 is made of steel bars spliced ​​in a corrugated form, and the steel truss 22 is fixed on the steel plate 21, that is, the steel truss 22 has a certain vertical height to form a space for pouring concrete. In addition, it should be noted that the steel truss 22 can be pre-made according to the size of the floor deck 20, and the steel truss 22 can be directly laid after the steel plate 21 is connected to the embedded bolts 13, which is convenient and quick to install.

[0025] In some embodiments, the thickness of the steel plate 21 is 0.5±0.1 mm, which can provide sufficient support for the upper steel frame truss 22 and concrete pouring without causing material waste.

[0026] In some embodiments, please refer to Figure 4 The steel truss 22 is composed of a first steel bar 23, a second steel bar 24 and a third steel bar 25. The first steel bar 23 includes a flange section and a diagonal bracing section. The flange section is attached to the steel plate 21 (such as fixed by welding), and the diagonal bracing section extends obliquely upward along the end of the flange section. The two first steel bars 23 are symmetrically arranged and spliced ​​at the top. The second steel bar 24 is horizontally arranged at the top splicing of the two first steel bars 23. The third steel bar 25 is horizontally arranged at the connection between the flange section and the diagonal bracing section. Through the above combination, the steel truss 22 structure is obtained. When pouring concrete on the steel plate 21, a better tie can be formed to ensure that the steel beam 10 is firmly connected to the floor deck 20.

[0027] In some embodiments, after the embedded bolts 13 are aligned and connected with the steel beam 10, the steel truss 22 can be tied and fixed with the embedded bolts 13. Through the secondary tying, the connection between the steel beam 10 and the floor deck 20 is further ensured to be firm.

[0028] In some embodiments, after the embedded bolts 13 are aligned and connected with the steel beam 10, the embedded bolts 13 can be welded and fixed to the holes. By welding and fixing the embedded bolts 13 to the holes, it is further ensured that the steel beam 10 and the floor decking plate 20 are firmly connected.

[0029] The utility model achieves the purpose of transmitting the pressure of the floor deck 20 to the steel beam 10 by inserting the steel beam 10 and the floor deck 20 through the embedded bolts 13 and the holes, combining the secondary reinforcement binding of the steel truss 22 and the embedded bolts 13, or the welding of the embedded bolts 13 and the holes, ensuring that when pouring concrete on the floor deck 20, there is no need to add a support system at the bottom of the floor deck 20, thereby reducing costs and improving safety.

[0030] The specific implementation process of the steel structure floor deck and steel beam connection structure provided by the utility model can adopt the following scheme:

[0031] First, the embedded bolts 13 are pre-set on the steel beam 10; the steel plate 21 and the steel truss 22 are integrally prefabricated into a floor deck 20 with a width of 500 to 1000 mm, and spliced ​​according to the overall floor width requirements;

[0032] Second, the embedded bolts 13 on the steel beam 10 are inserted into the corresponding holes on the steel plate 21 to complete the connection between the floor decking plate 20 and the steel beam 10. After the connection, the steel truss 22 and the embedded bolts 13 can be tied for a second time or the embedded bolts 13 and the holes on the floor decking plate 20 can be welded and reinforced, thereby effectively improving the strength of the connection;

[0033] Third, after the hidden inspection of the steel bars and the like is qualified, the upper part of the floor decking 20 can be poured with concrete, and the lower part of the floor decking 20 is free of support, and subsequent maintenance and decoration construction can be carried out.

[0034] In summary, the utility model provides a steel structure floor decking and steel beam connection structure, wherein the steel beam 10 includes a main steel beam 11 and a secondary steel beam 12, wherein the main steel beam 11 is connected end to end to form an outer frame, and the secondary steel beam 12 is erected inside the outer frame to divide the area enclosed by the outer frame into a plurality of decking areas, and the floor decking 20 is correspondingly covered on the decking areas; a plurality of holes are opened on the edge of the floor decking 20, and a plurality of pre-embedded bolts 13 corresponding to the holes are respectively provided on the main steel beam 11 and the secondary steel beam 12 constituting the decking area. The utility model arranges embedded bolts 13 on the steel beam 10 and opens holes on the floor decking 20, and utilizes the aligned insertion of the embedded bolts 13 and the holes to facilitate timely connection of the holes with the embedded bolts 13 on the steel beam 10 during the construction of the floor decking 20 of the steel structure, thereby improving the integrity and stability of the steel beam 10 and the floor decking 20, and then ensuring that when the concrete is poured on the upper part of the floor decking 20, the floor decking 20 has sufficient strength to meet the needs of the construction load, thereby ensuring construction safety, reducing the investment in labor, materials, etc., and also reducing costs and accelerating the construction progress.

[0035] Obviously, those skilled in the art can make various changes and modifications to the utility model without departing from the spirit and scope of the utility model. Thus, if these modifications and variations of the utility model fall within the scope of the claims of the utility model and their equivalents, the utility model is also intended to include these modifications and variations.

Claims

1. A steel structure floor deck and steel beam connection structure, characterized in that: The steel beams include a main steel beam and a secondary steel beam. The main steel beams are connected end to end to form an outer frame. The secondary steel beams are erected inside the outer frame to divide the area enclosed by the outer frame into a number of deck areas. The floor decks are correspondingly covered on the deck areas. A number of holes are opened on the edges of the floor decks. The main steel beams and secondary steel beams that constitute the deck areas are respectively provided with a number of embedded bolts corresponding to the holes.

2. The steel structure floor deck and steel beam connection structure according to claim 1, characterized in that: The embedded bolts are welded to the main steel beam and the secondary steel beam.

3. The steel structure floor deck and steel beam connection structure according to claim 1, characterized in that: The floor decking plate includes a steel plate and a steel truss. The steel plate is laid above the decking plate area, and the holes are opened on the edge of the steel plate. The steel truss is made of steel bars spliced ​​in a corrugated form, and the steel truss is fixed to the steel plate.

4. The steel structure floor deck and steel beam connection structure as claimed in claim 3, characterized in that: The thickness of the steel plate is 0.5±0.1 mm.

5. The steel structure floor deck and steel beam connection structure as claimed in claim 3, characterized in that: The steel bar truss is composed of a first steel bar, a second steel bar and a third steel bar, wherein the first steel bar includes a flange section and a diagonal bracing section, wherein the flange section is in contact with the steel plate, and the diagonal bracing section extends diagonally upward along the end of the flange section; the two first steel bars are symmetrically arranged and spliced ​​at the top; the second steel bar is horizontally arranged at the top splicing point of the two first steel bars; and the third steel bar is horizontally arranged at the connection between the flange section and the diagonal bracing section.

6. The steel structure floor deck and steel beam connection structure as claimed in claim 3, characterized in that: After the embedded bolts are aligned and connected with the steel beams, the steel bar trusses are tied and fixed with the embedded bolts.

7. The steel structure floor deck and steel beam connection structure according to claim 1, characterized in that: After the embedded bolts are aligned and connected with the steel beam, the embedded bolts are fixed to the holes by welding.