Vine climbing assembly of fruit planting greenhouse

By designing a fruit planting greenhouse climbing assembly using curved support frames and insertion cone rods, the complex problems of assembly and disassembly in the prior art are solved, convenient assembly and disassembly operations are achieved, and portability and stability of use are improved.

CN222916689UActive Publication Date: 2025-05-30HONGHEZHOU YIXUN AGRI TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421513788.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2025-05-30
Estimated Expiration
2034-06-28

AI Technical Summary

Technical Problem

When using existing ivy climbing components, the assembly and disassembly process is complicated and is not convenient for portable use.

Method used

A crawling assembly for fruit planting greenhouses is designed, using arc-shaped support frames, insertion conical rods, inclined mounting plates, V-shaped clamping plates and mounting rods. The assembly is completed through simple construction operations, and stable fixation is achieved using mesh rubber grilles and fixing rods.

Benefits of technology

It realizes the convenient assembly and disassembly of the ivy-climbing components, simplifies the operation process, is convenient for portability, and prevents the components from slipping and dislocation through limiting and fixed structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222916689U_ABST
    Figure CN222916689U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of crop vine climbing tools, in particular to a vine climbing assembly of a fruit planting greenhouse, which comprises two mutually symmetrical arc-shaped support frames, two end parts of each arc-shaped support frame are fixedly provided with insertion conical rods, and the vertical section and the bent section part close to the vertical section of each arc-shaped support frame are fixedly provided with inclined lapping plates. V-shaped clamping plates are fixedly installed at the top positions of the arc-shaped supporting frames, carrying rods are erected on the left inclined lapping plates, the right inclined lapping plates and the two V-shaped clamping plates correspondingly, end limiting discs are fixedly installed at the two ends of each carrying rod, the multiple carrying rods are covered with mesh rubber grids, and the mesh rubber grids are of mesh-shaped belt body structures; pedal plates are fixedly mounted at the two ends of the arc-shaped supporting frame, and a center hole with the two ends communicating with the outside is formed in the carrying rod. The utility model is convenient to erect and disassemble, simple to operate and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of crop climbing tools, specifically to a climbing component for a fruit planting greenhouse. Background Technique

[0002] When carrying out fruit planting operations in a fruit planting greenhouse, when the planted fruits and vegetables are vine-type plants, such as grapes, etc., due to their long vines, in order to avoid the fruits directly contacting the soil and rotting, at this time, it is usually necessary to erect corresponding climbing components in the fruit planting greenhouse for the vines to climb. There are many types of climbing components on the market, and most of the climbing components are fixed by splicing.

[0003] However, when most of the climbing components fixed by splicing are in use, their splicing methods generally use bolt fixation, and the multiple frames and the supporting rods are also fixed by bolts. Since the number of erected support rods is large, at this time, multiple fastening bolts are required to complete the fixing operation, and both its assembly and disassembly processes are relatively complex, which is not conducive to portable assembly and disassembly operations, bringing inconvenience to users. In view of this, we have proposed a climbing component for a fruit planting greenhouse. Content of the Utility Model

[0004] The purpose of the utility model is to provide a climbing component for a fruit planting greenhouse to solve the defects mentioned in the above background technique.

[0005] To achieve the above purpose, the utility model provides the following technical solutions:

[0006] A climbing component for a fruit planting greenhouse, including two symmetrically arranged arc-shaped support frames. Insertion cone rods are fixedly installed at both ends of the arc-shaped support frames. Inclined laying plates are fixedly installed on both the vertical section and the curved section part close to the vertical section of the arc-shaped support frames. A V-shaped clamping plate is fixedly installed at the top position of the arc-shaped support frames. Carrying rods are laid on the corresponding left and right inclined laying plates and the two V-shaped clamping plates. End limit discs are fixedly installed at both ends of the carrying rods. A mesh hole rubber grille is covered on the multiple carrying rods, and the mesh hole rubber grille is a mesh-shaped belt structure.

[0007] Preferably, the inclined laying plate is arranged to be inclined upward at 60° - 75°, and a clamping groove is arranged between the inclined laying plate and the arc-shaped support frame.

[0008] Preferably, the outer diameter of the end limit disc is larger than the width of the clamping groove for limiting and anti-disengagement operations.

[0009] Preferably, foot pedals are fixedly installed at both ends of the arc-shaped support frames, and the foot pedals are used for foot stepping and force application operations.

[0010] Preferably, bolt holes are provided on the foot pedal, and the bolt holes are used for the insertion and fixing operation of bolts.

[0011] Preferably, a central hole with both ends communicating with the outside is provided in the carrying rod, and the central hole is used for reducing weight.

[0012] Preferably, a plurality of drain holes communicating with the outside are provided on the annular hole wall of the central hole, and the drain holes are used for drainage operation.

[0013] Preferably, a fixing rod is inserted and fitted in the end through hole of the mesh rubber grille. A force-bearing plate is fixedly installed at the top end of the fixing rod, and a conical rod is fixedly installed at the bottom end of the fixing rod.

[0014] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0015] 1. By means of the arc-shaped support frame and the insertion cone rod provided in the present utility model, the arc-shaped support frame is supported by inserting the insertion cone rod into the soil. In addition, the carrying rod is supported by the inclined support plate and the V-shaped clamping plate provided. The carrying rod is directly placed on the corresponding inclined support plate and V-shaped clamping plate to complete the assembly operation. Finally, the mesh rubber grille is laid on a plurality of carrying rods to complete the assembly. The overall operation is simpler and more convenient to use, achieving the effect of being able to be assembled and disassembled portably.

[0016] 2. By means of the end limiting plate provided in the present utility model, the carrying rod can be limited, so that the carrying rod is not easily slipped off from the inclined support plate and the V-shaped clamping plate. In addition, by means of the fixing rod, the force-bearing plate and the conical rod provided, the end of the mesh rubber grille can also be fixed to prevent the mesh rubber grille from shifting. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 is a schematic diagram of the overall structure of the present utility model;

[0018] Figure 2 is a schematic diagram of a part of the structure of the present utility model I;

[0019] Figure 3 is a schematic diagram of a part of the structure of the present utility model II;

[0020] Figure 4 is of the present utility model Figure 3 is an enlarged view of part A in the present utility model.

[0021] The meanings of the various reference numerals in the drawings are as follows:

[0022] 1. Arc-shaped support frame; 10. Inclined boarding; 101. Card slot; 11. V-shaped clamping plate; 12. Insertion taper rod; 13. Foot pedal; 131. Anchor rod hole; 14. Loading rod; 141. Central hole; 15. End limiting disc; 16. Drainage hole;

[0023] 2. Mesh rubber grille; 20. Fixed rod; 21. Stress plate; 22. Cone rod. Specific embodiments

[0024] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0025] Please refer to Figures 1 - 4 , the present invention provides a technical solution: a climbing component for a fruit planting greenhouse, including two symmetrically arranged arc-shaped support frames 1. Insertion taper rods 12 are fixedly installed at both ends of the arc-shaped support frame 1, and the insertion taper rods 12 are used to insert into the soil for fixed support operations;

[0026] Specifically, inclined boarding 10 is fixedly installed on both the vertical section and the curved section part close to the vertical section of the arc-shaped support frame 1. The inclined boarding 10 is arranged to be inclined upward at 60° - 75°. A card slot 101 is arranged between the inclined boarding 10 and the arc-shaped support frame 1; a V-shaped clamping plate 11 is fixedly installed at the top position of the arc-shaped support frame 1. Corresponding left and right inclined boarding 10 and two V-shaped clamping plates 11 are all provided with loading rods 14 to realize the construction operation of the frame body;

[0027] Specifically, a mesh rubber grille 2 is covered on multiple loading rods 14. The mesh rubber grille 2 is a mesh-shaped belt structure, enabling the vines to climb along the mesh rubber grille 2.

[0028] In this embodiment, end limiting discs 15 are fixedly installed at both ends of the loading rod 14. The outer diameter of the end limiting disc 15 is larger than the width of the card slot 101, which is used for limiting and anti-detachment operations. When the loading rod 14 slides left and right, the end limiting disc 15 will not fall off after abutting against the side of the inclined boarding 10 or the V-shaped clamping plate 11.

[0029] Specifically, foot pedals 13 are fixedly installed at both ends of the arc-shaped support frame 1. The foot pedals 13 are used for foot force application operations, making it more smooth to insert the insertion taper rod 12 into the soil.

[0030] Furthermore, an anchor rod hole 131 is provided on the foot pedal 13. The anchor rod hole 131 is used for the insertion and fixation operation of the anchor rod, achieving the effect of further stable fixation.

[0031] In addition, a central hole 141 with both ends communicating with the outside is provided inside the carrying rod 14. The central hole 141 is used to reduce the weight.

[0032] It should be noted that a plurality of drain holes 16 communicating with the outside are provided on the annular hole wall of the central hole 141. The drain holes 16 are used for drainage operations.

[0033] It is worth noting that a fixing rod 20 is inserted and fitted in the end through hole of the mesh rubber grille 2. A force receiving plate 21 is fixedly installed at the top end of the fixing rod 20, and a conical rod 22 is fixedly installed at the bottom end of the fixing rod 20, realizing the fixing operation of the end of the mesh rubber grille 2 and preventing the mesh rubber grille 2 from shifting.

[0034] When the climbing component of the fruit-growing greenhouse of the present utility model is in use, first, the insertion cone rod 12 at the end of the arc-shaped support frame 1 is inserted into the soil at a suitable position according to the distance of the carrying rod 14. After the left and right arc-shaped support frames 1 are fixed, the carrying rod 14 is placed on the corresponding card slots 101 and the left and right V-shaped clamping plates 11. After setting up the corresponding number of carrying rods 14, the mesh rubber grille 2 is then laid and covered on the plurality of carrying rods 14. Finally, the fixing rod 20 is passed through the corresponding through hole at the end of the mesh rubber grille 2, so that the force receiving plate 21 abuts against the mesh rubber grille 2, and the conical rod 22 is inserted into the soil to complete the fixing operation.

[0035] The above shows and describes the basic principles, main features and advantages of the present utility model. Those skilled in the art of this industry should understand that the present utility model is not limited by the above embodiments. The above embodiments and the descriptions in the specification are only preferred examples of the present utility model and are not used to limit the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model will have various changes and improvements, and these changes and improvements all fall within the scope of the present utility model claimed. The scope of protection claimed by the present utility model is defined by the appended claims and their equivalents.

Claims

1. A climbing vine assembly for a fruit growing greenhouse, characterized in that: The invention comprises two mutually symmetrical arc-shaped support frames (1), both ends of the arc-shaped support frames (1) are fixedly mounted with inserted cone rods (12), the vertical section of the arc-shaped support frame (1) and the curved section near the vertical section are fixedly mounted with inclined straps (10), a V-shaped card plate (11) is fixedly mounted at the top position of the arc-shaped support frame (1), and corresponding left and right inclined straps (10) and two V-shaped card plates (11) are mounted with carrying rods (14), both ends of the carrying rods (14) are fixedly mounted with end limit plates (15), and a plurality of the carrying rods (14) are covered with mesh rubber grilles (2), and the mesh rubber grilles (2) are mesh-shaped belt structures.

2. The climbing vine assembly for a fruit planting greenhouse according to claim 1, characterized in that: The inclined strap (10) is arranged to be inclined upward at an angle of 60° to 75°, and a clamping groove (101) is arranged between the inclined strap (10) and the arc-shaped support frame (1).

3. The climbing vine assembly for a fruit planting greenhouse according to claim 2, characterized in that: The outer diameter of the end limiting plate (15) is greater than the width of the clamping slot (101), and is used for limiting and preventing slipping operations.

4. The climbing vine assembly for a fruit planting greenhouse according to claim 1, characterized in that: Foot plates (13) are fixedly mounted on both ends of the arc-shaped support frame (1), and the foot plates (13) are used for foot-operated force-bearing operations.

5. The climbing vine assembly for a fruit planting greenhouse according to claim 4, characterized in that: The foot plate (13) is provided with an anchor rod hole (131), and the anchor rod hole (131) is used for inserting and fixing the anchor rod.

6. The climbing vine assembly for a fruit planting greenhouse according to claim 1, characterized in that: The carrying rod (14) is provided with a central hole (141) whose two ends are both connected to the outside, and the central hole (141) is used to reduce weight.

7. The climbing vine assembly for a fruit planting greenhouse according to claim 6, characterized in that: A plurality of drainage holes (16) connected to the outside are arranged on the annular hole wall of the central hole (141), and the drainage holes (16) are used for drainage operation.

8. The climbing vine assembly for a fruit planting greenhouse according to claim 1, characterized in that: A fixing rod (20) is inserted into the through hole at the end of the mesh rubber grille (2), a force plate (21) is fixedly mounted on the top end of the fixing rod (20), and a conical rod (22) is fixedly mounted on the bottom end of the fixing rod (20).