Building decoration and special material preparation device

By designing a building decoration and special material preparation device including a configuration cylinder, a first shaft cylinder, a second shaft cylinder and a spiral groove, the problem of slow coating preparation speed in the prior art is solved, and the rapid and uniform mixing of the coating is achieved, and the configuration efficiency is improved.

CN222930664UActive Publication Date: 2025-06-03ZHEJIANG RUIMAO CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421693768.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2025-06-03
Estimated Expiration
2034-07-17

AI Technical Summary

Technical Problem

The existing architectural coating configuration devices require long-term stirring when adding coatings, resulting in slower coating preparation speed.

Method used

A building decoration and special material preparation device is designed, including a configuration cylinder, a first shaft cylinder, a second shaft cylinder, a spiral groove and a planetary gear set. The coating substrate is stirred by the arrangement of the first shaft cylinder and the spiral push plate, and the second shaft cylinder and the spiral groove rotating in the opposite direction are used to uniformly mix the material and improve the uniformity of the filler.

Benefits of technology

It realizes uniform mixing of materials into the coating substrate in a short time, significantly improving the efficiency of coating configuration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222930664U_ABST
    Figure CN222930664U_ABST
Patent Text Reader

Abstract

The utility model relates to a building decoration and special material preparation device which comprises a configuration barrel, a first shaft barrel is rotationally installed in the configuration barrel, a second shaft barrel is rotationally installed in the first shaft barrel, a first spiral groove is formed in the barrel wall of the first shaft barrel, and a second spiral groove is formed in the barrel wall of the second shaft barrel. The utility model relates to the technical field of architectural coating preparation equipment. According to the preparation device for the building decoration and the special materials, a first shaft barrel and a spiral push plate are arranged to stir a coating substrate, when materials need to be added, the added materials are put into a second shaft barrel, and due to the fact that the spiral directions of a first spiral groove and a second spiral groove are opposite, the materials can be conveniently added; and at the joint of the first spiral groove and the second spiral groove, the inner cavity of the configuration barrel communicates with the second shaft barrel, so that when materials are added, the materials entering the second shaft barrel can enter the configuration barrel, and the effect of conveniently adding the materials is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building coating configuration equipment, in particular to a device for preparing building decoration and special materials. Background Technique

[0002] In recent years, the overall upgrading and transformation of China's construction industry has accelerated, driving the rapid development of domestic building decoration material product enterprises. With domestic enterprises continuously increasing their R & D efforts, new domestic technologies, new models, and new products, including prefabricated buildings and new building decoration materials, have emerged continuously.

[0003] In the construction field, decorative materials play a crucial role. With the continuous development of technology, building decorative materials have been greatly improved in terms of quality, function, environmental protection, etc. Under this social background, the construction aspect that has developed requires a variety of liquid materials, including but not limited to liquid coatings such as exterior wall radiation insulation coatings, interior and exterior wall coatings, paints, coatings, waterproof coatings, anti-corrosion coatings, and fireproof coatings;

[0004] In the prior art, most of the above-mentioned coatings are composite materials. Therefore, during the production and mixing process of these liquid materials, different materials need to be added at different time periods to improve the heat insulation effect;

[0005] However, in the existing configuration devices, during the process of adding coatings, the materials are usually put into the configuration cylinder from the top, and it is necessary to stir for a long time to make the materials evenly mixed, and then the next material is put in. This way greatly reduces the speed of coating preparation. Content of the Utility Model

[0006] According to the deficiencies in the prior art, the purpose of the utility model is to provide a device for preparing building decoration and special materials, so as to solve the technical problems mentioned in the above background technique.

[0007] The above technical purpose of the utility model is achieved through the following technical solutions:

[0008] A device for preparing building decoration and special materials, including a configuration cylinder, a first shaft cylinder is rotatably installed inside the configuration cylinder, a second shaft cylinder is rotatably installed inside the first shaft cylinder, a first spiral groove is provided on the cylinder wall of the first shaft cylinder, a second spiral groove is provided on the cylinder wall of the second shaft cylinder, a spiral push plate is fixedly installed on the outer wall of the first shaft cylinder, a fixed cover is provided at the top of the configuration cylinder, and a planetary gear set is provided at the top of the first shaft cylinder and the second shaft cylinder.

[0009] Furthermore, the spiral directions of the first spiral groove and the second spiral groove are opposite.

[0010] Further, the top end of the second shaft cylinder penetrates through the fixed cover.

[0011] Further, a driving motor is arranged at the top end of the fixed cover, and a driving bevel gear is key-connected to the motor shaft of the driving motor.

[0012] Further, a bevel gear ring meshing with the driving bevel gear is sleeved on the outer side wall of the second shaft cylinder.

[0013] Further, a feeding pump is arranged at the top end of the second shaft cylinder.

[0014] In summary, the present utility model includes at least one of the following beneficial technical effects:

[0015] 1. For the building decoration and special material preparation device, the paint base is stirred through the arrangement of the first shaft cylinder and the spiral pushing plate. When materials need to be added, the added materials are put into the interior of the second shaft cylinder. Since the spiral directions of the first spiral groove and the second spiral groove are opposite, at the intersection of the first spiral groove and the second spiral groove, the inner cavity of the configuration cylinder is communicated with the second shaft cylinder. Therefore, when the materials are added, the materials entering the interior of the second shaft cylinder can enter the interior of the configuration cylinder, achieving the effect of facilitating the addition of materials.

[0016] 2. For the building decoration and special material preparation device, since the spiral directions of the first spiral groove and the second spiral groove are opposite, a through hole is formed between the first shaft cylinder and the second shaft cylinder, enabling the inner cavity of the second shaft cylinder to be communicated with the inner cavity of the configuration cylinder, allowing the materials to enter the interior of the configuration cylinder through the inner cavity of the second shaft cylinder. And through the arrangement of the first spiral groove and the second spiral groove, when the first shaft cylinder and the second shaft cylinder rotate in opposite directions, the position of the intersection point of the first spiral groove and the second spiral groove will continuously change. Therefore, when the materials are discharged through the second shaft cylinder, they can be at different positions in different configuration cylinders, achieving the effect of improving the uniformity of the filling materials and effectively improving the efficiency of preparing the paint. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the following drawings are only some embodiments of the present utility model. For those of ordinary skill in the art, without creative efforts, other drawings can be obtained based on these drawings.

[0018] Figure 1 It is a schematic structural diagram of a building decoration and special material preparation device of the present utility model.

[0019] Figure 2 It is a schematic internal structure diagram of the configuration cylinder of a building decoration and special material preparation device of the present utility model.

[0020] Figure 3 Structural schematic of the first shaft cylinder and the second middle cylinder of a building decoration and special material preparation device of the present utility model Figure 1 。

[0021] Figure 4 Structural schematic of the first shaft cylinder and the second middle cylinder of a building decoration and special material preparation device of the present utility model Figure 2 。

[0022] In the figure, 1, preparation cylinder; 2, first shaft cylinder; 3, second shaft cylinder; 4, first spiral groove; 5, second spiral groove; 6, spiral push plate; 7, fixed cover; 8, planetary gear set; 9, drive motor; 10, drive bevel gear; 11, bevel gear ring; 12, feeding pump. Specific implementation mode

[0023] The following further describes the present utility model in detail with reference to the accompanying drawings.

[0024] Embodiment:

[0025] Refer to Figures 1 - 4 , a building decoration and special material preparation device disclosed by the present utility model includes a preparation cylinder 1, a first shaft cylinder 2 is rotatably installed inside the preparation cylinder 1, a second shaft cylinder 3 is rotatably installed inside the first shaft cylinder 2, a first spiral groove 4 is formed on the cylinder wall of the first shaft cylinder 2, a second spiral groove 5 is formed on the cylinder wall of the second shaft cylinder 3, a spiral push plate 6 is fixedly installed on the outer wall of the first shaft cylinder 2, a fixed cover 7 is arranged at the top of the preparation cylinder 1, and a planetary gear set 8 is jointly arranged at the tops of the first shaft cylinder 2 and the second shaft cylinder 3.

[0026] In this embodiment, when in use, the paint base is placed inside the preparation cylinder 1, and the paint base is stirred through the arrangement of the first shaft cylinder 2 and the spiral push plate 6. When materials need to be added, the added materials are put into the inside of the second shaft cylinder 3. Since the spiral directions of the first spiral groove 4 and the second spiral groove 5 are opposite, at the junction of the first spiral groove 4 and the second spiral groove 5, the inner cavity of the preparation cylinder 1 is communicated with the second shaft cylinder 3. Therefore, when the materials are added, the materials entering the inside of the second shaft cylinder 3 can enter the inside of the preparation cylinder 1;

[0027] Through the arrangement of the planetary gear set 8, the first shaft cylinder 2 and the second shaft cylinder 3 can rotate in opposite directions. During the rotation of the first shaft cylinder 2 and the second shaft cylinder 3, the position of the junction of the first spiral groove 4 and the second spiral groove 5 changes continuously. As a result, the height of the material discharge point inside the preparation cylinder 1 changes continuously, so that the materials can be evenly mixed into the paint base, thereby effectively reducing the time for mixing the materials and the paint base and achieving the purpose of improving the preparation efficiency.

[0028] The internal gear ring of the planetary gear set 8 is fixedly connected to the first shaft cylinder 2. The sun gear of the planetary gear set 8 is sleeved on the top end of the second shaft cylinder 3. A rotating shaft is arranged inside the planetary gear of the planetary gear set 8, and the rotating shaft is fixedly connected to the fixed cover 7.

[0029] In a further preferred embodiment of the present utility model, as Figures 1 - 4 shown, the spiral directions of the first spiral groove 4 and the second spiral groove 5 are opposite.

[0030] In this embodiment, since the spiral directions of the first spiral groove 4 and the second spiral groove 5 are opposite, a through hole is formed between the first shaft cylinder 2 and the second shaft cylinder 3, so that the inner cavity of the second shaft cylinder 3 is communicated with the inner cavity of the configuration cylinder 1, enabling the material to enter the inside of the configuration cylinder 1 through the inner cavity of the second shaft cylinder 3. And through the arrangement of the first spiral groove 4 and the second spiral groove 5, when the first shaft cylinder 2 and the second shaft cylinder 3 rotate in opposite directions, the position of the intersection point of the first spiral groove 4 and the second spiral groove 5 will continuously change. Thus, when the material is discharged through the second shaft cylinder 3, it can be at different positions of different configuration cylinders 1, achieving the effect of improving the uniformity of the filler and effectively improving the efficiency of configuring the coating.

[0031] In a further preferred embodiment of the present utility model, as Figures 1 - 4 shown, the top end of the second shaft cylinder 3 penetrates through the fixed cover 7.

[0032] In this embodiment, through the arrangement of the second shaft cylinder 3 extending out the fixed rod, it is convenient to directly put the added material into the inside of the second shaft cylinder 3 when adding the material, achieving the effect of facilitating the input of the material.

[0033] In a further preferred embodiment of the present utility model, as Figures 1 - 4 shown, a driving motor 9 is arranged at the top end of the fixed cover 7, and a driving bevel gear 10 is key-connected to the motor shaft of the driving motor 9.

[0034] In this embodiment, the driving motor 9 and the driving bevel gear 10 are arranged to drive the second shaft cylinder 3.

[0035] In a further preferred embodiment of the present utility model, as Figures 1 - 4 shown, a bevel gear ring 11 meshing with the driving bevel gear 10 is sleeved on the outer side wall of the second shaft cylinder 3.

[0036] In this embodiment, through the arrangement of the bevel gear ring 11, in cooperation with the driving motor 9 and the driving bevel gear 10, the driving motor 9 drives the second shaft cylinder 3 to rotate, and then in cooperation with the planetary gear set 8, the effect of making the first shaft cylinder 2 and the second shaft cylinder 3 rotate in opposite directions is achieved.

[0037] In a further preferred embodiment of the present utility model, as Figures 1 - 4 shown, a feeding pump 12 is provided at the top of the second shaft cylinder 3.

[0038] In this embodiment, the feeding energy is provided to pressurize the inside of the second shaft cylinder 3, so that the materials inside the second shaft cylinder 3 can be quickly discharged into the inside of the configuration cylinder 1.

[0039] The embodiments of the specific implementation manners are all preferred embodiments of the present utility model, and do not limit the protection scope of the present utility model accordingly. Therefore, all equivalent changes made according to the structure, shape and principle of the present utility model shall be covered within the protection scope of the present utility model.

Claims

1. A device for preparing building decoration and special materials, comprising a preparation cylinder (1), characterized in that: A first shaft cylinder (2) is rotatably mounted inside the configuration cylinder (1), a second shaft cylinder (3) is rotatably mounted inside the first shaft cylinder (2), a first spiral groove (4) is provided on the wall of the first shaft cylinder (2), a second spiral groove (5) is provided on the wall of the second shaft cylinder (3), a spiral push plate (6) is fixedly mounted on the outer wall of the first shaft cylinder (2), a fixed cover (7) is provided at the top end of the configuration cylinder (1), and a planetary gear set (8) is commonly provided at the top ends of the first shaft cylinder (2) and the second shaft cylinder (3).

2. A building decoration and special material preparation device according to claim 1, characterized in that: The spiral directions of the first spiral groove (4) and the second spiral groove (5) are opposite.

3. A building decoration and special material preparation device according to claim 2, characterized in that: The top end of the second shaft cylinder (3) passes through the fixing cover (7).

4. A building decoration and special material preparation device according to claim 3, characterized in that: A driving motor (9) is arranged at the top end of the fixed cover (7), and a driving bevel gear (10) is key-connected at the motor shaft of the driving motor (9).

5. A building decoration and special material preparation device according to claim 4, characterized in that: The outer wall of the second shaft cylinder (3) is sleeved with a bevel gear ring (11) meshing with the driving bevel gear (10).

6. A building decoration and special material preparation device according to claim 5, characterized in that: A feeding pump (12) is provided at the top end of the second shaft cylinder (3).